Closing Soon

Government Contract Solicitation

R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017

City of Long Beach

  • Solicitation #PW-26-795
  • StateCA
  • State & Local
5 days until responses close Mon, November 16, 2026
Request proposal support

Winning government proposals usually start 4+ weeks ahead.

RFP / Bid Procurement Vehicle
State & Local Jurisdiction Level
California (CA) Geographic Location
9 Attached Documents

Scope of work

Solicitation overview

Header Information Bid Number: PW-26-795 Description: R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017 Bid Opening Date: 11/16/2026 10:00:00 AM Purchaser: Natalie Gonzalez Organization: City of Long Beach Department: PW - PUBLIC WORKS Location: 3007 - CAPITAL IMPROVEMENT PROGRAM Fiscal Year: 26 Type Code: 05 - RBID - Construction Bid Allow Electronic Quote: Yes Alternate Id: R...

Important dates

Procurement schedule

  • November 10, 2026 Solicitation posted
  • November 11, 2026 Today — 5 days remaining in response window
  • November 16, 2026 Responses due / Closing date

Awarding agency

Issuing organization

Agency name
City of Long Beach
Jurisdiction
California (CA)
Agency level
State & Local
Buyer / Contact
562-570-6555 · https://www.longbeach.gov/ · 333 W Ocean Blvd · Long Beach
Official portal
View solicitation on govspend ↗
Source
govspend

Procurement attachments

Solicitation documents & addenda (9)

  • 📄
    R-7259-Palo-Verde-Avenue-Pedestrian-Overcrossing-Bid-Documents.pdf
    96.3 MB
    Download ↗
  • 📄
    Seller-Guidance-v4.pdf
    505.4 KB
    Download ↗
  • 📄
    R-7259-Palo-Verde-Ave-Bridge-Addendum-2.pdf
    870.0 KB
    Download ↗
  • 📄
    R-7259-Palo-Verde-Ave-Overcrossing-Bridge-Sign-Pre-Bid-Presentation-1.pdf
    2.8 MB
    Download ↗
  • 📄
    R-7259-Palo-Verde-Bridge-Signage-On-Site-Meeting-Sign-In-Sheet-1020.26 1.pdf
    209.0 KB
    Download ↗
  • 📄
    R-7259-Palo-Verde-Overcrossing-Bridge-Sign-Pre-Bid-PLA-Presentation.pdf
    776.4 KB
    Download ↗
  • 📄
    R7259-Palo-Verde-Ave-Bridge-Addendum-1.pdf
    437.8 KB
    Download ↗
  • 📄
    R7259-Palo-Verde-Ave-Bridge-Addendum-3.pdf
    859.8 KB
    Download ↗
  • 📄
    R7259-Palo-Verde-Ave-Bridge-Bid-RFIs-Responses.pdf
    152.4 KB
    Download ↗

Line items, specifications & terms

Full solicitation details

Header Information

Bid Number:PW-26-795Description:R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017Bid Opening Date:11/16/2026 10:00:00 AM
Purchaser:Natalie GonzalezOrganization:City of Long Beach
Department:PW - PUBLIC WORKSLocation:3007 - CAPITAL IMPROVEMENT PROGRAM
Fiscal Year:26Type Code:05 - RBID - Construction BidAllow Electronic Quote:Yes
Alternate Id:Required Date:Available Date :09/30/2026 05:35:32 PM
Info Contact:Kimvy Nguyen, Kimvy.Nguyen@psomas.comBid Type:OPENInformal Bid Flag:No
Purchase Method:Contract
Begin Date:03/01/2027End Date:12/31/2027
Pre Bid Conference:Mandatory pre-bid via Microsoft Teams to review bidding processes, PLA, and Long Beach Small Business Enterprise (LBSBE) requirements at 9:00a.m. on October 20, 2026. Job-site walk through will be at 11:30am on October 20, 2026.
Bulletin Desc:The work to be done consists of fabrication and installation of a gateway sign signifying the entrance to the City via 7th Street. The sign will be mounted on the Long Beach Bridge over 7th Street near Channel View Park, and will include LED lighting to illuminate the facade of the Long Beach letters. Bids are required for the entire Work.
Ship-to Address:Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Bill-to Address:Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Print Format:Bid Print
Required Quote Attachments
Desired Attachment NameDescription
Pre-Bid Meeting:Yes
Mandatory:Yes
Pre-Bid Meeting On (PST):10/20/2026 09:00:00 AM
Pre-Bid Meeting Location:Virtual Meeting
Procurement Amendments
Amendment #Amendment DateAmendment Note
110/12/2026 09:23:48 AMHeader 1. Contact Info changed from "" to "Kimvy Nguyen, Kimvy.Nguyen@psomas.com". Attachment File Changes: Header 1. File 'R-7259 Addendum No. 1': File 'R-7259 Addendum No. 1' added .
210/21/2026 11:40:33 AMAddendum No. 2, Pre-Bid Presentations, and Sign In Sheets Attachment File Changes: Header 1. File 'R-7259 Addendum No. 2': File 'R-7259 Addendum No. 2' added . 2. File 'R-7259 Pre-Bid Presentation': File 'R-7259 Pre-Bid Presentation' added . 3. File 'R-7259 Pre-Bid PLA Presentation': File 'R-7259 Pre-Bid PLA Presentation' added . 4. File 'R-7259 Pre-Bid Sign In Sheet': File 'R-7259 Pre-Bid Sign In Sheet' added . 5. File 'R-7259 Site Walk Sign In Sheet': File 'R-7259 Site Walk Sign In Sheet' added .
311/04/2026 01:05:04 PMAttachment File Changes: Header 1. File 'R-7259 Palo Verde Ave Pedestrian Bridge Bid RFI Responses.pdf': File 'R-7259 Palo Verde Ave Pedestrian Bridge Bid RFI Responses.pdf' added .
411/09/2026 08:14:50 AMHeader 1. Bid Opening Date changed from "11/10/2026 10:00:00 AM" to "11/16/2026 10:00:00 AM". Attachment File Changes: Header 1. File 'R-7259 Addendum No. 3': File 'R-7259 Addendum No. 3' added .

Detailed Specifications & Scope from Attached Documents

📄 Seller-Guidance-v4.pdf (Parsed Contract Document)

Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 Long Beach Buys User Guide: Submitting a Quote This guide is designed to enhance the user experience on Long Beach Buys by providing detailed guidance on process of submitting a response to a contract opportunity. It aims to address frequently asked questions and streamline the submittal process, ensuring users have all the necessary information they need to navigate the system effectively. USER ROLES There are two roles for users in Long Beach Buys: • Seller – this role allows vendors to interact with the City’s bid solicitations, allowing users to review bid details, download bid attachments, and ultimately create and submit a quote. • Seller Administrator – this is designated for administrative maintenance of the organization’s account. Any piece of information provided during registration, with the exception of a user’s Login ID, can be updated via the Seller Administrator role. Please note: The two roles have different homepages. The Seller Administrator homepage does not allow user to view, engage with, or submit a response to a bid solicitation. Please reference the image below detailing how to change roles in the system. Page 2 of 6 Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 LOCATING THE BID SOLICITATION – OPTION 1 1. Log into Long Beach Buys 2. Click Bids Tab as shown below: 3. Under the section, Open Bids locate the Bid Solicitation number. The Bid Solicitation number is provided in the email sent by Long Beach Buys or can be found on the ‘Open Bids’ page linked on the homepage. 4. Click Create Quote (Located at the bottom of the Bid summary tab) 5. Click Follow and Yes on the Acknowledge Receipt and View Solicitation screen. • Clicking Yes opts you into being notified when an amendment occurs against the document. • If an amendment occurs, the user who acknowledges receipt of the Bid Solicitation is emailed that a change occurred and needs to log into the system and locate the Bid Solicitation to view the change. • The page refreshes and will be directed to the Create a Quote. https://longbeachbuys.buyspeed.com/bso/view/login/login.xhtml Page 3 of 6 Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 LOCATING THE BID SOLICITATION – OPTION 2 1. Click the Settings icon 2. Click Advanced Search 3. Click Bids in the Document Type field 4. Enter the Bid Solicitation number in the Bid # field • The Bid Solicitation number is provided in the email sent by Long Beach Buys 5. Click Find it 6. Click the Bid Solicitation number 7. Click Yes on the Acknowledge Receipt and View Solicitation screen • This opts you into being notified when there is an amendment to the document. • You're directed to the Bid Solicitation screen 8. Click Create Quote – page will refresh, and you will be directed to the General tab of the Quote SUBMITTING THE QUOTE Validation Errors Upon creating a quote, validation errors will appear. All red validation error messages that appear will need to be addressed before submitting the quote. Common validation errors include: • Terms & Conditions is not acknowledged • Please attach all required attachment(s) before submitting Quote Page 4 of 6 Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 Line-Item Tab Pricing will only be provided in the line-item tab if the solicitation in question is an Invitation to Bid (ITB). For all other types of solicitations (RFPs, RFQs, EOI) the line-item tab provides a description of the opportunity and includes all associated commodity codes in order to notify potential vendors. For ITBs the tab will capture the vendor’s response (e.g., pricing) for each Item on the Bid Solicitation. 1. Enter the price for each Item being bided against in the Unit Cost field 2. Sellers can export all the Items by clicking the Export button located at the bottom of the screen, enter their Price for each Item under the Unit Cost column and removing “Y” under the No Bid column, save the CSV File to their computer, then upload it by clicking the Upload button, and selecting the file from their computer. 3. Items not being bided against, leave the Unit Cost as $0 4. Click Save & Continue Terms and Conditions Tab The Terms & Conditions, which are established by the City Attorney and Risk Manager, and all other Bid Attachments are shown on this tab. Be sure to read and understand the terms and conditions associated with the Bid Solicitation before accepting. 1. Review materials. Any attachment shown on the tab may be downloaded by the Seller. 2. The Seller has the option to accept or to not accept the Terms & Conditions of the Bid. 3. Click Yes 4. Click Save & Continue 5. Click the Attachments tab Page 5 of 6 Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 Attachment Tab Allows the Seller to capture any supporting documentation related to their Quote that may be helpful to the evaluators. Required Attachments are used to ensure that vendors provide all mandatory attachments at the time of submittal, to ensure all proposers are responsive. All Required Attachments must be uploaded for the attachment validation error to be addressed. 1. Click on ‘Required Upload’ then Click Choose File (Google Chrome) or Click Browse (Internet Explorer, Mozilla Firefox), Select the file, Click Open, Complete the fields – The Seller may update the Name for the attachment and enter a description that displays to the Organization user. Click Save & Exit – Repeat previous steps to add additional attachments. • Examples include proposal documents, product specifications, warranty documents and completed/signed forms required by the Bid Solicitation. Sellers have the option to make attachments confidential from the public. Documents containing sensitive information, such as tax information, would be deemed confidential. 2. Click Confidential associated with the document 3. Click Save & Continue Sellers also have the option to delete an attachment: 1. Click Delete associated with the document 2. Click Save & Continue Page 6 of 6 Department of Financial Management 411 West Ocean Boulevard, 6th Floor Long Beach, CA 90802 (562) 570-6425 Summary Tab Allows the Seller to review all the information entered on the previous tabs prior to submitting the Quote. Once the Quote is submitted, the Seller cannot edit the document; however, the Seller may withdraw the Quote (for editing and resubmission) at any time before the Bid Opening Date and Time. 1. Click Submit Quote 2. Click OK in the popup window confirming you want to submit your Quote. The screen refreshes, leaving you on the Summary tab. The status changes to Submitted – The Quote is officially submitted ending the process.

📄 R-7259-Palo-Verde-Ave-Bridge-Addendum-2.pdf (Parsed Contract Document)

R-7259
Addendum 2





October 21, 2026



ADDENDUM NO. 2

PLANS AND SPECIFICATIONS NO. R-7259
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT
IN THE CITY OF LONG BEACH, CALIFORNIA


NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS

Please note the following changes, clarifications and additions:

1. SPECIFICATIONS

Division A Notice Inviting Bids

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor
Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State
of California, the Director of Public Works of the City by and on behalf of the City Council has
obtained from the Director of the Department of Industrial Relations of the State of California
the general prevailing rate of per diem wages, and the general prevailing rate of holiday and
overtime work in the locality in which the public work is to be performed for each craft,
classification or type of workers needed to perform the work. Copies of the prevailing rate of
per diem wages are on file in the office of the City Engineer, 5th Floor, City Hall, 411 West
Ocean Boulevard, Long Beach, California 90802. The Contractor to whom the Contract is
awarded, and its subcontractors, shall pay to all workers in the performance of the work not
less than the prevailing rate of wages needed to execute the contract. Copies of schedules of
prevailing wage rates may be obtained on the California Department of Industrial Relations
website http://www.dir.ca.gov/dlsr. This project will be subject to the 2026-2 prevailing wage
rate, as determined by the Director of the Department of Industrial Relations for the State of
California. Bidders are directed to Section 7-2, “Labor,” of the Standard Specifications, and
to Division H, Subsection 7-2.2, “Prevailing Wages,” for requirements concerning payment of
prevailing wages, payroll records, and hours of labor.

Division H General Requirements
7-2.2 Prevailing Wages.
CALIFORNIA WAGE RATE REQUIREMENTS: Contractor agrees that all public work (as
defined in California Labor Code section 1720) performed pursuant to this Agreement (the
“Public Work”), if any, shall comply with the requirements of California Labor Code sections
1770 et seq. If there is a difference between the general prevailing wage rates determined by
the director of the Department of Industrial Relations and the applicable minimum wage rates
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
http://www.dir.ca.gov/dlsr


R-7259
Addendum 2
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
determined by the Secretary of Labor (for federally assisted projects) for similar classifications
of work, the Contractor and its subcontractors of every tier shall pay their workers not less than
the higher wage rate.

In all bid specifications, contracts and subcontracts for any such Public Work, Developer shall
obtain the general prevailing rate of per diem wages and the general prevailing rate for holiday
and overtime work in this locality for each craft, classification or type of worker needed to
perform the Public Work, and shall include such rates in the bid specifications, contract or
subcontract. Such bid specifications, contract or subcontract must contain the following
provision: “It shall be mandatory for the contractor to pay not less than the said prevailing rate
of wages to all workers employed by the contractor in the execution of this contract. The
awarded contractor expressly agrees to comply with the penalty provisions of California Labor
Code section 1776.

This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part 7,
Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City
by and on behalf of the City Council has obtained from the Director of the Department of
Industrial Relations of the State of California the general prevailing rate of per diem wages, and
the general prevailing rate of holiday and overtime work in the locality in which the public work
is to be performed for each craft, classification or type of workers needed to perform the Work.
Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th
floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made
available upon request. Copies may also be obtained on the California Department of Industrial
Relations website http://www.dir.ca.gov/dlsr. This project will be subject the 2026-2 prevailing
wage rate, as determined by the Director of the Department of Industrial Relations for the State
of California. The Contractor to whom the Contract is awarded, and its subcontractors is
directed to pay not less than the general rate of per diem wages for each craft, classification,
or type of worker needed to execute the contract. Contractor is required to post a copy of the
determination of the director of the prevailing rate of per diem wages at each job site.
Contractors are required to pay at least the California minimum wage for the basic hourly rate
in all cases where the published prevailing wage rate is below the California minimum wage.
Any and all employer payments required by the prevailing wage determinations must also be
paid. If the California minimum wage is increased in the future to an amount above that shown
in the prevailing wage determination, the basic hourly rate in that determination automatically
increases to the new minimum wage.


7-18 Public Safety
You are responsible to provide for public safety.
Do not construct a temporary facility that interferes with the safe passage of traffic. Control dust
resulting from the work, inside and outside the right-of-way.
Move workers, equipment, and materials without endangering traffic.
Whenever your activities create a condition hazardous to the public, furnish, erect and maintain
those fences, temporary barrier system, barricades, lights, signs, and other devices and take
any other necessary protective measures to prevent damage or injury to the public.
http://www.dir.ca.gov/dlsr


R-7259
Addendum 2
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
Any fences, temporary railing, barricades, lights, signs, or other devices furnished, erected and
maintained by you are in addition to those for which payment is provided elsewhere in the
specifications.
Provide flaggers whenever necessary to ensure that the public is given safe guidance
through the work zone. Flagging must comply with Caltrans 2024 Standard Specifications
Section 12-1. Providing flaggers is included in the bid items of work involved.
At locations where traffic is being routed through construction under one-way controls, move
your equipment in compliance with the one-way controls unless otherwise ordered.
Use of signs, lights, flags, or other protective devices must comply with the California MUTCD
and any directions of the Engineer. Signs, lights, flags or other protective devices must not
obscure the visibility of, nor conflict in intent, meaning, and function of either existing signs,
lights and traffic control devices, or any construction area signs.
Keep existing traffic signals and highway lighting in operation. Other forces within the
Department will perform routine maintenance of these facilities during the work.
Cover signs that direct traffic to a closed area. Except for work specified in Caltrans 2024
Standard Specifications Section 12, maintaining, and removing the covers on construction area
signs is included in the bid items of work involved.
Install temporary illumination such that the illumination and the illumination equipment do not
interfere with public safety. The installation of general roadway illumination does not relieve you
from furnishing and maintaining any protective devices.
Equipment must enter and leave the highway via existing ramps and crossovers and must
move in the direction of traffic. All movements of workers and construction equipment on or
across lanes open to traffic must be performed in a manner that do not endanger the public.
Your vehicles or other mobile equipment leaving an open traffic lane to enter the construction
area must slow down gradually in advance of the location of the turnoff to give the traffic
following an opportunity to slow down. When leaving a work area and entering a roadway
carrying traffic, your vehicles and equipment must yield to traffic. Compensation for flaggers,
used for all movement of workers and construction vehicles and equipment on or across
lanes open to traffic, is included in the bid items of work involved.
Immediately remove hauling spillage from a roadway lane or shoulder open to traffic. When
hauling on roadways, trim loads and remove material from shelf areas to minimize spillage.
Notify the Engineer not less than 25 days and not more than 125 days before the anticipated
start of an activity that will change the vertical or horizontal clearance available to traffic,
including shoulders.
If vertical clearance is temporarily reduced to 15.5 feet or less, place low clearance warning
signs in compliance with the California MUTCD and any directions of the Engineer. Signs must
comply with the dimensions, color, and legend requirements of the California MUTCD and
Caltrans 2023 Standard Specifications Section 12-3.11 except that the signs must have black
letters and numbers on an orange retroreflective background. W12-2P signs must be
illuminated so that the signs are clearly visible.
Pave or provide full width continuous and cleared wood walks for pedestrian openings through
falsework. Protect pedestrians from falling objects and concrete-curing water. Extend overhead


R-7259
Addendum 2
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
protection for pedestrians at least 4 feet beyond the edge of the bridge deck. Illuminate all
pedestrian openings through falsework. Provide railings, barricades and barriers between
temporary pedestrian walkways and construction activities. Temporary pedestrian facilities
must comply with the California MUTCD, Part 6, Chapter 6D, "Pedestrian and Worker Safety",
as well as the current California ADA codes
Do not store vehicles, material, or equipment in a way that:
1. Creates a hazard to the public
2. Obstructs traffic control devices

Do not install or place temporary facilities used to perform the work which interfere with the free
and safe passage of traffic.
Temporary facilities that could be a hazard to public safety if improperly designed must comply
with design requirements described in the Contract for those facilities or, if none are described,
with standard design criteria or codes appropriate for the facility involved. Submit shop
drawings and design calculations for the temporary facilities and show the standard design
criteria or codes used. Shop drawings and supplemental calculations must be sealed and
signed by an engineer who is registered as a civil engineer in the State.
Contractor shall provide a temporary overhead covering system above the pedestrian path to
protect against falling objects. Protection system should account for a continuous overhead
protective surface supported by an appropriate framing system consisting of a rigid covering
layer capable of shielding pedestrians from falling objects, such as decking or similar protective
surfaces. In addition, contractor to provide supplemental netting or screening along exposed
edges or work zones to contain smaller debris.

Where construction activities occur above active traffic lanes, the Contractor shall ensure that
no falling objects can reach traffic below.

Lane closures, freeway closures may be used to eliminate exposure to overhead hazards. This
is acceptable provided all overhead work with risk of falling objects is performed while traffic is
not present below. No work involving suspended loads or falling object risk shall occur over
open lanes without adequate protection
Where the Contractor proposes to perform work over active traffic lanes and cannot fully rely
on closures, the Contractor shall provide a designed containment/protection system that
prevents falling objects from reaching the roadway. The Contractor shall submit:
• Engineered shop drawings
• Structural design calculations
• Details demonstrating how the system protects traffic below
The protection system should account for a structural support system located beneath the
bridge or work area. This should also include a continuous protective surface or deck capable
of intercepting falling objects, including larger components associated with installation
activities. Protection system to include framing and protective elements sufficient to protect


R-7259
Addendum 2
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
motorists from both small debris and larger falling items associated with the work. Contractor
to coordinate protection approach with traffic control staging and clearly identify in submittals
when traffic closures will be used and protective systems are required
If you appear to be neglectful or negligent in furnishing warning devices and taking protective
measures, the Engineer may direct your attention to the existence of a hazard. You must
furnish and install the necessary warning devices. If the Engineer points out the inadequacy of
warning devices and protective measures, that action on the part of the Engineer does not
relieve you from your responsibility for public safety or abrogate your obligation to furnish and
pay for these devices and measures.
Install temporary barrier system or other authorized protective systems under any of the
following conditions:
1. Excavations: Where the near edge of the excavation is within 15 feet from the edge of an
open traffic lane
2. Temporarily unprotected permanent obstacles: When the work includes the installation of a
fixed obstacle together with a protective system, such as a sign structure together with
protective railing, and you elect to install the obstacle before installing the protective
system; or you, for your convenience and as authorized, remove a portion of an existing
protective railing at an obstacle and do not replace such railing completely the same day
3. Storage areas: When material or equipment is stored within 15 feet of the edge of an open
traffic lane and the storage is not otherwise prohibited by the Contract
4. Height differentials: When construction operations create a height differential greater than
0.15 feet within 15 feet of the edge of traffic lane

Installation of temporary barrier system is not required if an excavation within 15 feet from the
edge of an open traffic lane is protected by any of the following:
1. Steel plate or concrete covers of adequate thickness to prevent accidental entry by traffic
or the public
2. Side slope where the downhill slope is 4:1 (horizontal:vertical) or less unless a naturally
occurring condition
3. Barrier or railing

Offset the approach end of temporary barrier system a minimum of 15 feet from the edge of an
open traffic lane. Install the temporary barrier system on a skew toward the edge of the traffic
lane of not more than 1 foot transversely to 10 feet longitudinally with respect to the edge of
the traffic lane. If the 15-foot minimum offset cannot be achieved, the temporary barrier system
must be installed on the 10 to 1 skew to obtain the maximum available offset between the
approach end of the railing and the edge of the traffic lane, and an array of temporary crash
cushion modules must be installed at the approach end of the temporary barrier system.
Secure temporary barrier system in place before starting work for which the temporary barrier
system is required.
If a traffic lane is closed with channelizers for excavation work, move the devices to the adjacent
edge of the traveled way when not excavating. Space the devices as specified for the closure.
Do not move or temporarily suspend anything over a traffic lane open to the public unless the
public is protected.


R-7259
Addendum 2
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
The City has prepared a bike detour plan exhibit as a guide for Contractor reference. See
Division F for Temporary Traffic Control Bikeway Route 10 Detour Plan.
Contractor shall prepare a full traffic control plan for pedestrian/bike route closure including
timelines for implementation during the project and for removal and restoration upon
completion of the project. Traffic control plan shall be submitted to the Engineer for approval
prior to start of any project work.

CONTACT: Before the Bid opening, prospective Bidders shall direct any communications
regarding this Work to:

City of Long Beach, Department of Public Works
Project Management Bureau
5th Floor, City Hall
411 W. Ocean Boulevard
Long Beach, CA 90802
Attention: Kimvy Nguyen / Natalie Gonzalez
E-mail: Kimvy.Nguyen@psomas.com /Natalie.Gonzalez@longbeach.gov



Communications may be written or oral, but the City is not bound by any oral interpretation of
the Contract Documents made by any City employee, nor does the City guarantee the accurate
transcription of oral questions.




PREPARED BY: Kimvy Nguyen



ACKNOWLEDGED BY:
Company Name




Print Name Title


Signature Date
mailto:Kimvy.Nguyen@psomas.com


Department of Public Works A-1 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DIVISION A
NOTICE INVITING BIDS
FOR
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT

RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the work, until
10:00 am on November 10, 2026 for Palo Verde Avenue Pedestrian Bridge Sign Project
via the City’s online portal https://longbeachbuys.buyspeed.com/ keyword Project R-
7259.

MANDATORY PRE-BID CONFERENCE AND JOB-SITE WALK-THROUGH: The City
will conduct a mandatory pre-bid conference to review bidding processes, Project Labor
Agreement (PLA), at 9:00am on October 20, 2026. Prospective Bidders must attend this
meeting.

The pre-bid conference will be conducted via Microsoft Teams. Prospective Bidders must
attend this meeting. The meeting can be accessed online via the following link or by
phone:

Palo Verde Avenue Pedestrian Overcrossing Bridge R-7259 Pre Bid Virtual Teams
Meeting

Meeting ID: 244 616 748 949 827
Passcode: Dc2gm3DF


Dial in by phone
+1 951-344-4988, 984456970# United States, Riverside
Phone conference ID: 984 456 970#

PREBID QUESTIONS AND RFIs: All questions, including requests for interpretation or
correction, or comments regarding the Contract Documents, must be submitted no later
than October 27, 2026 at 5:00 p.m. Questions received after the pre-Bid question
deadline will not be accepted.

The job-site walk-through will be conducted on site on Tuesday October 20, 2026 at
11:30 a.m. We will be meeting at cul-de-sac at E 5th St near Channel View Park. Job-site
walk-through is mandatory. Prospective Bidders must also attend this meeting.

DESCRIPTION OF WORK: The work to be done consists of fabrication and installation
of a gateway sign signifying the entrance to the City via 7th Street. The sign will be
mounted on the Long Beach Bridge over 7th Street near Channel View Park, and will
include LED lighting to illuminate the façade of the Long Beach letters. Bids are required
for the entire Work.

LONG BEACH SMALL BUSINESS ENTERPRISE (LBSBE) PROGRAM: Bidders are
advised that this project is subject to the City’s Small Business (SBE), Very Small
https://longbeachbuys.buyspeed.com/
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
tel:+19513444988,,984456970


Department of Public Works A-2 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
Business, (VSBE), and Local Small Business (LSBE) Enterprise Program (“LBSBE
Program”) established by City Ordinance no. ORD 11-0010. A 10% combined
SBE/VSBE/LSBE goal has been assigned to this project. See Division C and E of the
Specifications.

PROJECT LABOR AGREEMENT (PLA): This work is covered by a Citywide Project
Labor Agreement (PLA) entered into by the City of Long Beach with the Los
Angeles/Orange Counties Building and Construction Trades Council and the signatory
Craft Unions. The PLA establishes the labor relations Policies and Procedures for the
City, the Contractor and subcontractors awarded contracts for the work and for the craft
persons employed by the Contractor or subcontractor while engaged in the work. See
Division E of the Specifications for the applicable PLA.


CONTRACTOR'S LICENSE: The Contractor shall possess a valid California Class A
Contractor license at the time of bid. The City may deem any Bidder who fails to possess
the required license to be non-responsive at the time of bid opening.

MINIMUM QUALIFICATIONS: Please note that for this work, minimum qualifications
Apply. Information concerning these requirements can be found in Division C of the
specifications. Bidders are required to complete the Bidders Qualifications Form and
submit as part of the Bid Package.

PLANS AND SPECIFICATIONS: Plans and specifications are posted on the City’s
website at the URL http://www.longbeach.gov/finance/business-info/purchasing-division/
on the “Bids/RFPs” tab and available for free download, however, you must be registered
(registration is free and may be accomplished at the same URL) and logged in to view or
download the documents.

BID SECURITY: Bidders must scan and upload with their bid documents, a certified
check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the
United States of America, or a satisfactory bond in an amount not less than 10 percent of
the bid. The original of the above instrument shall be submitted to the City Clerk in a
sealed envelope and must be received and time/date stamped by the City Clerk’s
Office no later than the time and date stated for receipt of bids. The outside of the
envelope shall clearly state “Bid Security for Specification R-7259 PALO VERDE
AVENUE PEDESTRIAN BRIDGE SIGN PROJECT. DO NOT OPEN WITH REGULAR
MAIL.” The City Clerk’s Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach,
CA 90802. The bid security may be submitted through certified mail or in-person. Bidders
may proceed directly to Window 12 without pulling a service ticket.

The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will
execute, and deliver to the City, no later than 15 calendar days after the date shown on
the “Notice of Award,” the following items:

1. The Contract for doing the work, and
http://www.longbeach.gov/finance/business-info/purchasing-division/


Department of Public Works A-3 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
2. A corporate surety bond in favor of the City of Long Beach in an amount not less
than 100 percent of the Contract price for the faithful performance of the Contract,
and
3. A corporate surety bond in an amount not less than 100 percent of the Contract
price for the payment of all labor and material claims, and
4. Evidence of required insurance coverage as written in Division H of the Bid
Specifications.

Failure to submit the items noted above when specified may result in the City, in its sole
discretion, declaring the bid security forfeited and depositing the same into the City
Treasury.

The City will retain the bid security accompanying all bids until it awards the Contract.
The City will retain the bid security submitted with the bid of the Bidder to whom an award
of Contract is made, and the bid security of the next higher bid, until the Contract between
the Bidder to whom award of the Contract is made and the City has been executed.

RETENTION: In the event the contract to be awarded hereunder, including Bid
Specifications and other documents incorporated therein by reference, provides for the
withholding of monies by the City to ensure performance of such contract, the Contractor
may: a) deposit with the City as a substitute for said monies, securities listed in Section
16430 of the California Government Code or bank or savings and loan certificates of
deposit, or both, equivalent to the amount withheld; or, b) request payment of retentions
earned directly to the escrow agent at the expense of the Contractor, provided Contractor
requests, in writing, to make such substitution within five (5) days of the date of the Notice
of Award of the Contract and bears all expenses in connection therewith. Either option
shall be in accordance with Public Contract Code Section 22300.

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor
Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the
State of California, the Director of Public Works of the City by and on behalf of the City
Council has obtained from the Director of the Department of Industrial Relations of the
State of California the general prevailing rate of per diem wages, and the general
prevailing rate of holiday and overtime work in the locality in which the public work is to
be performed for each craft, classification or type of workers needed to perform the work.
Copies of the prevailing rate of per diem wages are on file in the office of the City
Engineer, 5th Floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802.
The Contractor to whom the Contract is awarded, and its subcontractors, shall pay to all
workers in the performance of the work not less than the prevailing rate of wages needed
to execute the contract. Copies of schedules of prevailing wage rates may be obtained
on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr.
This project will be subject to the 2026-2 prevailing wage rate, as determined by the
Director of the Department of Industrial Relations for the State of California. Bidders are
directed to Section 7-2, “Labor,” of the Standard Specifications, and to Division H,
Subsection 7-2.2, “Prevailing Wages,” for requirements concerning payment of prevailing
wages, payroll records, and hours of labor.

http://www.dir.ca.gov/dlsr


Department of Public Works A-4 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is
subject to the following: No contractor or subcontractor may be listed on a bid proposal
for a public works project (submitted on or after March 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section
1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on
a public works project (awarded on or after April 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5. This project
is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Contractors are further cautioned that certified payrolls shall be submitted
electronically directly to the Department of Industrial Relations.

CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the
provisions of Labor Code Section 1776, Contractor shall keep and shall cause each
subcontractor performing any portion of the work under this Contract to keep an accurate
payroll record, showing the name, address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per diem
wages paid to each journeyman, apprentice, worker, or other employee employed by
Contractor or subcontractor in connection with the work. Such payroll records for
Contractor and all subcontractors shall be certified and shall be available for inspection
at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or
City’s authorized Labor Compliance representative in the manner provided herein for
notices shall entitle City to withhold the penalty prescribed by law from progress payments
due to Contractor.

Each contractor and every subcontractor and supplier shall be required to submit certified
payrolls and labor compliance documentation electronically at the discretion of and the
manner specified by the City of Long Beach. Electronic submittal will be a web-based
system, accessed on the World Wide Web by a web browser. Each contractor and
subcontractor will be given a Log On identification and password to access the City of
Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other
requirements or obligations established and imposed by any department of the City with
regard to submission and retention of certified payroll records for Contractor and
subcontractors.

APPRENTICESHIP EMPLOYMENT (CONTRACTS OVER $30,000 ONLY): The
Contractor shall comply with Section 1777.5 of the Labor Code concerning the
employment of apprentices by the Contractor or any subcontractor under the Contractor
and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall
so comply. Contractors employing apprentices or trainees under approved programs shall
maintain written evidence of the registration of apprenticeship programs and certification
of trainee programs, the registration of the apprentices and trainees, and the ratios and
wage rates prescribed in the applicable programs.



Department of Public Works A-5 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
PENALTIES: Contractor and subcontractors are subject to penalties, including, but not
limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with
Labor Code § 1720 et seq. The Awarded Contractor expressly agrees to comply with the
penalty provisions of California Labor Code section 1776.



(SEAL) /s/ MONIQUE DE LA GARZA
CITY CLERK, CITY OF LONG BEACH, CALIFORNIA

_____________ /s/ THOMAS B. MODICA
DATE CITY MANAGER


End of Division A – Notice Inviting Bids
Department of Public Works H- 1 R-7259
City of Long Beach Division H – General Requirements



STANDARD SPECIFICATIONS
(PART 1 - GENERAL)

These provisions are modifications of the Standard Specifications for Public Works
Construction, 2015 Edition, called the Standard Specifications. The Standard
Specifications are a part of the Work’s Specifications.

The Standard Specifications are written and promulgated by Public Works
Standards, Incorporated. Copies of the Standard Specifications are available from the
publisher, Building News, Incorporated, 1612 South Clementine Street, Anaheim,
California 92802, telephone (714) 517-0970.

GENERAL PROVISIONS

SECTION 1 – TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF
MEASURE, AND SYMBOLS

1-1 GENERAL Add the following:
The following items from the Departments are in writing:
1. Approvals
2. Authorizations
3. Decisions
4. Notifications
5. Orders
6. Responses

The following items from the Contractor must be in writing:
1. Notifications
2. Proposals
3. Reports
4. Requests, including RFIs, sequentially numbered
5. Subcontracts
6. Test results

Where a location is not specified with the words shown, specified, or described,
interpret:
1. Shown as shown on the plans.
2. Specified as specified in the specifications.
3. Described as described in the Contract. Described means shown, specified, or both.

Department of Public Works H-2 R-7259
City of Long Beach Division H – General Requirements

1-2 TERMS AND DEFINITIONS.
Replace and add the following definitions:
Activity - Task, event, or other project element on a schedule that contributes to
completing the project. An activity has a description, start date, finish date, duration, and
one or more logic ties.
Acts of God - Acts of God as defined in Pub Cont Code § 7105.
Addendum - Written or graphic instrument issued prior to the opening of Bids which
clarifies, corrects, or changes the Contract Documents. The term "Addendum" shall
include bulletins and all other types of written notices issued to potential bidders prior to
opening of the Bids.

Agency – See “City.”
Agreed Price - The cost for new or unforeseen work, or for adjustments in the Contract
Unit Price for changes in the character of the work as specified in 3-2.4, established by
mutual agreement between the Contractor and the Agency.
Agreement - See Contract.
Assessment Act Contract - A Contract financed by special assessments authorized
under a State Act or procedural ordinance of a City or County.
Authorized laboratory - Independent testing laboratory (1) not employed or
compensated by any subcontractor or subcontractor's affiliate providing other services
for the Contract and (2) authorized by the Department.
Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth
the prices for the Work.
Bid Item - Work unit for which the Bidder provides a price.
Bid Item List - List of bid items, units of measure, and the associated quantities.
The verified Bid Item List is the Bid Item List with verified prices. The Contract Proposal
of Low Bidder at the Department's website is the verified Bid Item List. After contract
award, interpret a reference to the Bid Item List as a reference to the verified Bid Item
List.
Bidder - Any individual, firm, partnership, corporation, or combination thereof,
submitting a Bid for the Work, acting directly or through a duly authorized
representative.
Borrow - Fill acquired from an excavation source outside the described cut area.
1. local borrow - Material obtained by widening cuts or excavating from sources
outside the planned or authorized cross section on the job site. The location of the
local borrow is described or designated by the Engineer.
2. imported borrow - Borrow that is not local borrow.
Board – The City Council of the City of Long Beach, California, or its designated
agencies and boards.
Bond - Bid, performance, or payment bond or other instrument of security.
Department of Public Works H-3 R-7259
City of Long Beach Division H – General Requirements

Caltrans-The State of California Department of Transportation.
California Test - Department-developed test for determining work quality. For California
Tests, go to the Caltrans Materials Engineering and Testing Services (METS) website.

Cash Contract - A Contract financed by means other than special assessments.

Certificate of compliance - Certificate stating the material complies with the Contract.
Change Order - A written order to the Contractor signed by the Agency directing an
addition, deletion, or revision in the Work, or an adjustment in the Contract Price or the
Contract time issued after the effective date of the Contract. A Change Order may or
may not also be signed by the Contractor.
Change order work - Work described in a Change Order, including extra work and
work described in the Contract as change order work.
City – The City of Long Beach, California, its Boards and Commissions, and their
officials, employees, and agents.
Closure - Closure of a traffic lane or lanes, including shoulder, ramp, or connector
lanes, within a single traffic control system.
Code- The terms Government Code, Labor Code, etc., refer to codes of the State of
California.
Commercial quality - Quality meeting the best general practices.

Commercial source - Established business operating as a material source for the
general public.

Contract- The written agreement between the Agency and the Contractor covering the
Work.
Contract acceptance - City's written acceptance of a completed Contract.
Contract Documents - The Contract, Addenda, notice inviting bids, instructions to
bidders, Bid (including documentation accompanying the Bid and any post-bid
documentation submitted prior to the Notice of Award) when attached as an exhibit to
the Contract, the Bonds, permits from jurisdictional regulatory agencies, Special
Provisions, Plans, Standard Plans, Standard Specifications, Reference Specifications,
Change Orders, and Supplemental Agreements.
Contract Price - The total amount of money for which the Contract is awarded.
Contract time - Number of original working days as adjusted by any time adjustment.
Contract Unit Price-The amount stated in the Bid for a single unit of an item of work.
Contractor - The individual, partnership, corporation, joint venture, or other legal entity
having a Contract with the Agency to perform the Work. In the case of work being
Department of Public Works H-4 R-7259
City of Long Beach Division H – General Requirements

done under a permit issued by the Agency, the permittee shall be construed to be
the Contractor. The term "prime contractor" shall mean the Contractor.
Controlling activity - Construction activity that will extend the scheduled completion
date if delayed.
County Sealer- The Sealer of Weights and Measures of the county in which the Contract
is awarded.
Critical path - Longest continuous chain of activities for the project that has the least
amount of total float of all chains. In general, a delay on the critical path extends
the scheduled completion date.
Critical path method - Network-based planning technique using activity durations and
relationships between activities to calculate a schedule for the entire project.
Data date - Day after the date through which a schedule is current. Everything occurring
earlier than the data date is as-built and everything on or after the data date is
planned.
Day - 24 consecutive hours running from midnight to midnight; calendar day.
1. business day - Day on the calendar except a Saturday and a holiday.
2. working day - Time measure unit for work progress. Any day within the period
between the date of the start of the Contract time as specified in 6-1 and the
date of field acceptance of the Work by the Engineer, other than:
a) Saturday
b) Sunday
c) Any day designated as a holiday by the City. See definition for "holiday".
d) Any other day designated as a holiday in a Master Labor Agreement
entered into by the Contractor or on behalf of the Contractor as an eligible
member of a contractor’s association,
e) Any day the Contractor is prevented from working at the beginning of the
workday for cause as specified in 6-6.1, or
f) Any day the Contractor is prevented from working during the first 5 hours
with at least 60 percent of the normal work force for cause as specified in
6-6.1.
g) Day during a concurrent delay.

Where working days is specified without the modifier original in the context of the
number of working days to complete the work, interpret the number as the number
of original working days as adjusted by any time adjustment.
Days - Days shall mean consecutive calendar days unless otherwise specified in the
Special Provisions.
Deduction - Money permanently taken from a progress payment or the final payment.
Deductions are cumulative and are not retentions under Pub Cont Code § 7107.
Delay - Event that extends the completion of an activity.
1. excusable delay - Delay caused by the Department and not reasonably
foreseeable when the work began, such as:
1.1. Change in the work
1.2. Department action that is not part of the Contract
1.3. Presence of an underground utility main not described in the Contract
Department of Public Works H-5 R-7259
City of Long Beach Division H – General Requirements

or in a location substantially different from that specified
1.4. Described facility rearrangement not rearranged as described, by the
utility owner by the date specified, unless the rearrangement is solely
for the Contractor's convenience
1.5. Department's failure to obtain timely access to the right-of-way
1.6. Department's failure to review a submittal or provide notification in the
time specified
2. critical delay - Excusable delay that extends the scheduled completion date
3. concurrent delay - Occurrence of at least 2 of the following events in the same
period of time, either partially or entirely:
3.1. Critical delay
3.2. Delay to a controlling activity caused by you
3.3. Non–working day

Department - Department of Transportation as defined in St & Hwy Code § 20 and
authorized in St & Hwy Code § 90; its authorized representatives.
Dispose of - Remove from the job site.
Disputed Work- Work in which the City and the Contractor are in disagreement.
Divided highway - Highway with separated traveled ways for traffic, generally in
opposite directions.
Engineer - Resident Engineer responsible for the Contract's administration; Resident
Engineer's authorized representatives.
Early completion time - Difference in time between an early scheduled completion
date and the work completion date.

Encroachment permit - A permit issued by Caltrans granting permissive authority to
enter the state right-of-way and construct approved facilities. It authorizes only the
permittee or permittee’s agent to perform the scope of work specified within the
encroachment permit or cooperative agreement. The permittee may not transfer or
assign an approved permit to another party. When a permittee hires a contractor to
perform the approved work, an additional permit is required for the contractor.
Extra Work - New or unforeseen work not covered by a Contract Unit Price or
Stipulated Unit Price.
Highway - Whole right-of-way or area reserved for use in constructing the roadway and
its appurtenances.
Holiday - Holiday shown in the following table:
Holiday Date observed
Every Sunday Every Sunday
New Year's Day January 1st
Birthday of Martin Luther King, Jr. 3rd Monday in January
Lincoln’s Birthday February 12th
Washington’s Birthday 3rd Monday in February
Cesar Chavez Day March 31st
Department of Public Works H-6 R-7259
City of Long Beach Division H – General Requirements

Memorial Day Last Monday in May
Juneteenth 3rd Monday in June
President’s Day 3rd Monday in February
Election Day First Tuesday of November
Independence Day July 4th
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veterans Day November 11
Thanksgiving Day 4th Thursday in November
Day after Thanksgiving Day Day after Thanksgiving Day
Christmas Day December 25th

If January 1st, February 12th, March 31st, July 4th, November 11th, or December 25th falls
on a Sunday, the Monday following is a holiday. If November 11th falls on a Saturday,
the preceding Friday is a holiday.
Hours of darkness - Hours of darkness as defined in Veh Code § 280.
Idle equipment - Equipment:
1. On the job site at the start of a delay
2. Idled because of the delay
3. Not operated during the delay
Job site - Area within the defined boundaries of a project.
Landscaping - Practice of a landscaping contractor under 16 CA Code of Regs
§832.27.
Major Bid Item – A single Contract item constituting 10% or more of the original
Contract Price.
Material - Any product or substance specified for use in the construction of a project.
Material shortage -
1. Shortage of raw or produced material that is area-wide and caused by an unusual
market condition except if any of the following occurs:
1.1. Shortage relates to a produced, nonstandard material
1.2. Supplier's and the Contractor's priority for filling an order differs
1.3. Event outside the United States for a material produced outside the United
States
2. Unavailability of water that delays a controlling activity

Median - Portion of a divided highway separating the traveled ways including inside
shoulders.
Milestone - Event activity that has zero duration and is typically used to represent the
start or end of a certain stage of the project.
Mobilization - Preparatory work that must be performed or costs incurred before
starting work on the various items on the job site (Pub Cont Code § 10104).
Department of Public Works H-7 R-7259
City of Long Beach Division H – General Requirements

Modification - Includes Change Orders and Supplemental Agreements. A
Modification may only be issued after the effective date of the Contract.
Modify - Add to or subtract from an appurtenant part.
Narrative report - Document submitted with each schedule that discusses topics
related to project progress and scheduling.
Notice of Award - The written notice by the Agency to the successful Bidder stating
that upon its compliance with the required conditions, the Agency will execute the
Contract.
Notice to Proceed - A written notice given by the Agency to the Contractor fixing
the date on which the Contract time will start.
Operation, Maintenance, and Warranty Instructions - Documents published by
manufacturers of pre-manufactured products describing operation, maintenance
and any other actions that must be performed by the Agency as a condition for the
manufacturer to honor the specified warranty.
Person - Any individual, firm, association, partnership, corporation, trust, joint
venture, or other legal entity.
Plans – The Plans for this Work consist of Long Beach Drawing #B-4849 on file
with the Department of Public Works. A copy is included in the Specifications.

Private Contract - Work subject to Agency inspection, control, and approval,
involving private funds, not administered by the Agency.
Proposal - See Bid.
Quality characteristic - Characteristic of a material that is measured to determine
conformance with a given requirement.
Quality control - Quality control includes sampling, testing, and inspections performed
under your QC program to (1) control material quality and (2) ensure the specified
quality characteristics for the project are met.

Quality control plan - Contractor's plan to ensure QC.

Reference Specifications - The latest edition, including amendments, in effect as of
the date of advertisement of the Contract or issuing the permit, unless otherwise
specified, of:
a) bulletins,
b) standards,
c) rules,
d) methods of analysis or testing,
e) codes,
f) installation instructions, and
g) specifications of other agencies, engineering societies, manufacturers, or
industrial associations referred to in the Contract Documents.
Roadway - The portion of a street reserved for vehicular use.
Department of Public Works H-8 R-7259
City of Long Beach Division H – General Requirements

Shop Drawings - Drawings showing details of manufactured or assembled products
proposed to be incorporated into the Work.
Special Provisions - Additions and revisions to the Standard Specifications setting
forth conditions and requirements peculiar to the Work.
Specifications - Standard specifications, and special provisions, and specifications in
Change Orders or Supplemental Agreements between the Contractor and the Board.
1. Standard specifications - For Division H, the Standard Specifications for
Public Works Construction (SSPWC), the "Greenbook."For Division I, the
California Department of Transportation (Caltrans) 2025 Standard
Specifications.
2. Special provisions - Specifications specific to the project. These specifications
are in a section titles special provisions of a book titled Notice to Bidders and
Special Provisions.

Standard Plans – See "Plans"

State - State of California, including its agencies, departments or divisions whose
conduct or action is related to the work.
Stipulated unit price - unit prices established by the agency in the contract documents.
Street- any road, highway, parkway, freeway, alley, walk, or way.
Subcontractor - An individual, firm, or corporation having a direct contract with the
Contractor or with any other Subcontractor for the performance of a part of the Work.
Submittal -
1. action submittal - Written and graphic information and samples that require the
Department's response.
2. informational submittal - Written information that does not require the
Department's response.

Substantial defects - Defects plainly seen as damaged, displaced, or missing parts or
improper functioning of materials, parts, equipment, or systems.
Supervision - Supervision, where used to indicate supervision by the Engineer, shall
mean the performance of obligations, and the exercise of rights, specifically imposed
upon and granted to the Agency in becoming a party to the Contract. Except as
specifically stated herein, supervision by the Agency shall not mean active and
direct superintendence of details of the Work.
Supplemental Agreement - A written amendment of the Contract Documents
signed by the Agency and the Contractor.
Supplemental project information - Information relevant to the project, specified as
supplemental project information, and made available to bidders.
Surety - Any individual, firm, or corporation, bound with and for the Contractor for
the acceptable performance, execution, and completion of the Work, and for the
satisfaction of all obligations incurred.
Department of Public Works H-9 R-7259
City of Long Beach Division H – General Requirements

Unauthorized work - Work performed beyond the lines and grades described in the
Contract or established by the Engineer or extra work performed without Department
authorization.
Work - That which is proposed to be constructed or done under the Contract or
permit, including the furnishing of all labor, materials, equipment, and services.
Work - Resources and activities required for Contract acceptance, including labor,
materials, equipment, and the created product.
Work plan - Detailed formulation of a program of action.
Working Day – See "Day"

Working Drawings - Drawings showing details not shown on the Plans which are
required to be designed by the Contractor.


1-3 ABBREVIATIONS.
Replace section with the following:
1-3.2 Common Usage. Abbreviations pertaining to construction are included in in
Division I.

1-4 UNITS OF MEASURE.
1-4.1 General. The specifications are expressed in US customary units except where
a referenced document uses the International System of Units as the standard.

1-4.2 Units of Measure and Their Abbreviations.
Units used in the project plan quantity tables and in the Bid Item List:
Unit Definition
ACRE Acre
CF Cubic Foot
CY Cubic Yard
EA Each
GAL Gallon
LB Pound
LF Linear Foot
LNMI Lane Mile
LS Lump Sum
SQFT Square Foot
SQYD Square Yard
STA 100 Feet
TON 2,000 Pounds
Units used in the plans other than in the project plan quantity tables:
Unit Definition
Department of Public Works H-10 R-7259
City of Long Beach Division H – General Requirements

ksi Kips Per Square Inch
ksf Kips Per Square Foot
psi Pounds per Square Inch
psf Pounds per Square Foot
lb / ft 3, pcf Pounds per Cubic Foot
tsf Tons per Square Foot
mph, MPH* Miles per Hour
oz Ounce
lb Pound
kip 1,000 Pounds
cal Calorie
ft Foot or Feet
gal Gallon

Units of measure for Electrical Plans are listed in Caltrans Standard Plan A3C
available at https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-
specifications


1-5 SYMBOLS. Add the following:
Additional symbols used in the project plans are provided in Caltrans Standard
Plans dated 2025 available at https://dot.ca.gov/programs/design/ccs-standard-
plans-and-standard-specifications


SECTION 2– SCOPE AND CONTROL OF THE WORK

2-1 AWARD AND EXECUTION OF THE CONTRACT.
Add the following:
2.-1.1 Control of Work
This section includes specifications related to the Contract parties' relations and Contract
acceptance.
Furnish the resources except Department-furnished materials required to complete the
work as described in the Contract.
Provide QC.
Work is subject to the City and Department's inspection, sampling, and testing. The City
and Department's inspection, sampling, and testing do not relieve you of your
responsibility to provide QC.
Ensure the Department's safe and unrestricted access to the work. Furnish facilities
necessary for the Department's inspection.
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Department of Public Works H-11 R-7259
City of Long Beach Division H – General Requirements

Where the means and methods to complete the work are not described in the
Contract, choose the means and methods to complete the work.
Where the Contract describes more than 1 construction method or more than 1 type of
material or equipment, the Department does not assure that each construction method
or type of material or equipment can be used successfully throughout all or any part of
the project. You are responsible to use the alternative or alternatives that will
accomplish the work under the conditions encountered.
Failure to comply with any Contract part is a waiver of your right to an adjustment of time
and payment related to that part.
Use contract administration forms available at the Department's website.

2-2 ASSIGNMENT. No Changes

2-3 SUBCONTRACTS.
2-3.1 General. Add the following:
To the extent that Subsection 2-3.1 is inconsistent with Long Beach Municipal
Code Sections 2.87.010 through 2.87.080, the Long Beach Municipal Code supersedes
Subsection 2-3.1.

2-3.2 Self Performance. Replace this subsection with the following:
Standard requirements apply unless changed herein.
The Contractor shall perform, with its own organization, Contract work amounting to at
least 20 percent of the Contract price except that any designated “Specialty Items” may
be performed by subcontract and the amount of any such “Specialty Items” so
performed will be deducted from the Contract Price before computing the amount
required to be performed by the Contractor with its own organization. “Specialty Items”
will be identified by the Agency in the Bid or the Special Provisions. Where an entire
item is subcontracted, the value of the work subcontracted will be based on the Contract
Unit Price. When a portion of an item is subcontracted, the value of the work
subcontracted will be based on the estimated percentage of the Contract Unit Price.
This will be determined from information submitted by the Contractor, and subject to
approval by the Engineer.


2-4 CONTRACT BONDS. Add the following:
Sureties that are not listed in the latest revision of the United States Department
of the Treasury Circular 570 shall nevertheless be admitted to issue bonds in the State of
California.

2-5 PLANS AND SPECIFICATIONS.
2-5.1 General

Department of Public Works H-12 R-7259
City of Long Beach Division H – General Requirements

2-5.2 Precedence of the Contract Documents
Replace with the following:
A component in one Contract part applies as if appearing in each. The parts are
complementary and describe and provide for a complete work.
If a discrepancy exists:
1. Governing ranking of Contract parts in descending order is:
a) Permits issued by jurisdictional regulatory agencies.
b) Change Orders and Supplemental Agreements; whichever occurs last
c) Contract/ Agreement.
d) Addenda.
e) Bid/Proposal
f) Special provisions
g) Project plans
h) Standard specifications
i) Revised standard plans
j) Standard plans
k) Supplemental project information
2. Written numbers and notes on an approved drawing govern over graphics
3. Detail drawing governs over a general drawing
4. Specific specification governs over a general specification
5. Specification in a section governs over a specification referenced by that section

If a discrepancy is found or confusion arises, Contractor shall submit an RFI.
2-5.3 Submittals.
Supplement Table 2-5.3.2(A), untitled, and the listing shown in Subsection 2-5.3.4,
“Supporting Information,” with the following combined table:
Department of Public Works H-13 R-7259
City of Long Beach Division H – General Requirements

TABLE 2-5.3(A), Submittals
Item Section Number Title Subject
18 2-5.4 Record Drawings Record Drawings
19 2-9 Surveying Survey Records
20 4-1.4 Test of Materials List of Materials
21 4-1.5 Certification Certifications
22 6-1 Construction Schedule
and Commencement of
Work
Construction Schedule
23 6-8 and various
technical
sections
Completion,
Acceptance, and
Warranty
Special Warranties
24 7-2.2 Labor Labor Compliance documentation
25 7-3 and 7-4 Liability and Workers’
Compensation
Insurance
Insurance documentation
26 7-5 Permits Permits
27 7-9 Protection and
Restoration of Existing
Improvements

28 9-2 Lump Sum Work Lump Sum Details
29 Various technical
sections
Concrete Mix Designs Per Caltrans Std Spec
30 Various technical
sections
Asphalt Concrete Mix
Designs
Per Caltrans Std Spec
31 12 (Caltrans) Public Convenience
and Safety
Temporary Traffic Control
32 Various technical
sections
Catalog Details /
Manufacturer’s
Specifications
Per Caltrans Std Spec
33 Various technical
sections
Shop Drawings Per Caltrans Std Spec
34 Various technical
sections
Mock-ups Per Caltrans Std Spec
35 Various technical
sections
Extra Supplies Per Caltrans Std Spec
36 Various technical
sections
Instruction Manuals /
Control Charts
Per Caltrans Std Spec
This table is not comprehensive: additional submittal items may be listed in other
Department of Public Works H-14 R-7259
City of Long Beach Division H – General Requirements

sections of the Specifications.

2-5.3B Sign Letter Submittal:

Contractor shall prepare and submit to the Engineer one letter of the proposed sign for
review and approval. The sign letter submittal shall be at a 1:1 scale made with final
production materials. Match exact color, texture, finish and structural makeup as shown
on the drawings. Fix any functional parts as shown on the drawings.

Contractor shall deliver the Sign Letter submittal to a location as directed by the
Engineer for review and approval.

Contractor shall not order final Sign Letters materials or begin manufacturing of Sign
Letters until Engineer as approved the Sign Letter submittal.

Add the following subsection:
2-5.3.1 General Add the following: Deliver submittals to the City’s Project
Management Software. (Information provided in Division E). Division H Section 2-
5.3.2 and 2-5.3.4 include specifications for action and informational submittals.
Any submittal not specified as an informational submittal is an action submittal.
Submit action and informational submittals to the Engineer.
Each sheet of a submittal must include:
1. Contract number
2. District–County–Route–Post Mile
3. Structure name and number, if any
The Department rejects a submittal if it has any error or omission.
If the last day for submitting a document falls on a Saturday or holiday, it may be submitted
on the next business day with the same effect as if it had been submitted on the day
specified.
Convert foreign language documents to English and US customary units.
Deliver submittals to:

City of Long Beach, Department of Public Works
Project Management Bureau
5th Floor, City Hall
411 W. Ocean Boulevard
Long Beach, CA 90802
Attention: Kimvy Nguyen
E-mail: kimvy.nguyen@psomas.com

The Contractor shall not begin Work until the Engineer has approved relevant submittals
in writing. The City will not make final payment before the Contractor delivers all required
mailto:kimvy.nguyen@psomas.com
Department of Public Works H-15 R-7259
City of Long Beach Division H – General Requirements

Work submittals.

2-5.3.2 Action Submittals
Maintain a sequential list of action submittals except for samples, test samples, and
material sources. With each individual submittal, submit a copy of the updated list.
Submit an action submittal before the start of the affected work to allow for review and
corrections without work delays.
Except for test samples, obtain the Department's authorization for action submittals
before you perform work based on them.
Except for shop drawings and test samples, allow 15 days for review.
For a revised action submittal, allow the same number of days for review as for the original
submittal.
The time allowed for the review of an action submittal starts when the Department
receives the submittal.
Do not change the scope of work on revised submittals.
The Department's authorization of an action submittal does not void any Contract part(s)
and / or requirement(s).
2-5.3.3 Shop Drawings
Submit shop drawings as specified and as otherwise required to control the work. Each
drawing and calculation sheet must be in black ink and sequentially numbered.
Each drawing sheet, if not submitted electronically, must:

1. Be 11 by 17 inches
2. Be on a minimum of 20 lb paper
3. Have text of a minimum nominal height of 5/32 inch

Each calculation sheet, if not submitted electronically, must:
1. Be 8-1/2 by 11 inches
2. Have text of a minimum 12-point font

Paper submittals text and graphics must be legible for photocopying and reduction.
Calculations must demonstrate the design adequacy. Calculations specified as
independently checked must be sealed and signed by an engineer who is registered as
a civil engineer in the State and who did not seal and sign the drawings.
Allow 20 days for the review.
If multiple sets are submitted simultaneously or an additional set is submitted before the
review of a previously submitted set is complete, designate the sequence that the sets
Department of Public Works H-16 R-7259
City of Long Beach Division H – General Requirements

are to be reviewed. Allow the review time specified plus 15 days for each additional set.
A set consists of 40 or fewer sheets.
If drawings require corrections, the Department:
1. Describes the deficiencies
2. Stamps the drawings with the date that the review stopped
3. Returns the drawings

Show the set revision number. Uniquely number each revised detail. Show the number in
an inverted triangle near the revised portion of the detail. In a legend, describe and date
the revision.
Upon review completion, the Department returns 1 copy that shows the authorized date.
To make a change to an authorized drawing, submit it as specified for a new submittal.
Note the changes.
Upon the completion of work shown on the drawings, submit electronic copies of as-built
drawings. Include an index of the sheet numbers and titles on the 1st sheet for each
structure. Arrange the drawings in the drawing-number order shown in the index.
2-5.3.4 Informational Submittals
Informational submittals include:
1. Certificates of compliance
2. Manufacturer's instructions not associated with drawing submittals
3. Notifications
4. PLACs
5. Subcontracts
6. QC test data, QC test results, and QC evaluation reports
2-5.4 Record Drawings.
The Contractor shall keep one complete set of the Plans, reserved for use as
record drawings, at the Work site at all times. The Contractor shall maintain on these
drawings a currently updated record of all construction changes and variations from the
Plans, including all underground and surface improvements installed in locations other
than those indicated on the Plans. The Contractor shall enter the record information in
red. Where a Plan does not exist, the Contractor shall submit an accurate and detailed
sketch. The Contractor shall properly dimension and locate all changes and variations to
the Plans.
The Contractor shall submit the record drawings to the Engineer prior to final
acceptance of the Work.
2-5.5 Supplemental Project Information
The City makes the following supplemental project information is available as noted:
Logs of test borings are supplemental project information.

Department of Public Works H-17 R-7259
City of Long Beach Division H – General Requirements



2-9 SURVEYING.
2-9.1 Permanent Survey Markers.
Replace this subsection with the following:
The Contractor shall be responsible for the preservation and perpetuation of all existing
monuments which control subdivisions, tracts, boundaries, or rights-of-way, or which
provide survey control, including benchmarks, which will be disturbed by the Contractor’s
activities.
After receiving the Notice to Proceed, the Contractor, using the services of a surveyor
licensed in California, shall submit to the City preliminary Corner Records for those
monuments that were found in the construction area. The Contractor will not be given
authorization for any removals until the City’s Surveyor has accepted and approved the
preliminary Corner Records.
Prior to removals, the Contractor shall request the City of Long Beach Surveyor to transfer
to temporary bench marks the elevation for any benchmarks to be reset, and provide a
brass disc for the City Surveyor to stamp. When the discs are stamped and returned to
the Contractor, the Contractor shall construct the benchmarks at locations marked out by
the City Surveyor.
The Contractor's surveyor shall set new ties for any monuments whose ties are disturbed,
and prepare preliminary Corner Records for the new ties.
After construction and before final payment, the Contractor's surveyor shall submit to the
City for its review the preliminary Corner Records for any monuments replaced or
constructed, or whose ties are reset. The City will not approve preliminary Corner Records
showing “No Reference” unless the Contractor can demonstrate that a diligent effort was
made to find a reference. After the City’s approval, the Contractor's surveyor shall file
Supplemental Project Information
Means Description
Included in the Information Handout 1. Right of Way Maps
2a. 1981 As-built Drawings (7th St Pedestrian Bridge)
2b. 1995 As-built Drawings (Earthquake Retrofit)
3. Signature Gateway East Concept
4a. Lighting Fixture Specification Sheet
4b. Lighting Fixture Wiring Specification Sheet
5a. Pharos DMX Controller Specification Sheet
5b. Pharos DMX Controller O&M
6. Cradlepoint IBR900 Series Router Specification Sheet
7. Matthews Primer Product Information
8. Matthews Paint Product Information
9. Matthews Clear Product Information
10. Caltrans Encroachment Permit Issued to City
11. Caltrans Encroachment Permit Special Provisions
Available for inspection at:
411 W. Ocean Blvd.
Long Beach, CA 90802
Telephone no.: (562)570-5000
Referee Paint Samples
Department of Public Works H-18 R-7259
City of Long Beach Division H – General Requirements

Corner Records for those monuments in the Office of the County Surveyor and shall
provide the City with a copy of all Corner Records filed.
Payment for monument preservation and perpetuation by the Contractor shall be
considered as included in the prices bid for the various items of Work, and the City will
make no additional payment therefor.

2-9.2 Survey Service.
Replace this subsection with the following:
The Contractor shall set and maintain all stakes and marks necessary for the construction
of the Work and perform any additional design surveys that may be required. Except for
the survey control data provided on the plans, all calculations, surveying and measures
required for setting and maintaining the necessary lines and grades shall be performed
by the Contractor.
Surveys performed by the Contractor shall conform to the California Land Surveyor’s Act.
In accordance with the Act, “responsible charge” for surveying shall reside with a licensed
land surveyor or a civil engineer qualified to practice land surveying in California.
The minimum standard of survey quality shall be that of similar surveys performed by the
City of Long Beach and as outlined in Department's Surveys Manual.
The Contractor shall provide to the Engineer copies of all calculations, survey notes, and
staking data when requested by the Engineer. The Engineer shall decide all questions
which may arise as to the quality or acceptability of deliverables furnished and surveying
performed for this Work, and the Engineer’s decision shall be final.
The Contractor shall verify layout information shown on the Plans before proceeding with
layout of construction features.
The Contractor shall record deviations from the required lines and levels and shall advise
the Engineer promptly upon detecting deviations exceeding indicated or recognized
tolerances. Record deviations which are accepted (not corrected) shall be shown on the
as-built record drawings. Before final acceptance of the Work, the Contractor shall
provide to the Engineer all computations, survey notes, and other survey data used to
accomplish the Work, which shall become the property of the City. Construction stakes
shall be removed from the Work when no longer needed.
Payment for surveying by the Contractor shall be considered as included in the prices bid
for the various items of Work, and the City will make no additional payment therefor.

2-10 AUTHORITY OF BOARD AND ENGINEER.
Replace 2nd paragraph with the following:
If there appears to be any error or discrepancy in or between the Plans and Specifications,
the Contractor shall refer the matter to the Engineer for adjustment before proceeding
with the Work. If the Contractor proceeds with the Work without referring the matter, the
Contractor does so at its own risk and must bear any additional cost incurred as a result
of failure to refer.

Department of Public Works H-19 R-7259
City of Long Beach Division H – General Requirements

2-13 CONTRACTOR REQUIREMENTS.
2-13.1 Character Of Workers
If a worker appears to the Engineer to be incompetent or acts disorderly or improperly,
discharge the worker immediately upon request. Do not employ that worker again on the
work.
2-13.2 Coordination With Other Entities
Other entities may perform work at or near the job site and material sources at any time.
Coordinate activities to avoid delays.
Each contractor or other entity performing work at or near the job or material site is
responsible to the other for damage to work, persons, or property and for costs due to
unnecessary delays.
2-13.2.1 Coincident or Adjacent Contracts
During the progress of the work under this Contract, work under the following contracts
may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
County–Route–Post Mile Location Type of work
LA-22--0/10.2 Long Beach Roadway Improvements
Coordinate lane closures and traffic handling with the Engineer and with contractors of
coincident or adjacent projects. Potential conflicts may not be limited to the contracts
listed above.
2-13.6 Records
2-13.6.1 Record Retention
Retain project records from bid preparation through:
1. Final payment
2. Resolution of claims, if any
For at least 3 years after the later of these, retain cost records, including records of:
1. Bid preparation
2. Overhead
3. Payrolls
4. Payments to subcontractors and suppliers
5. Cost accounting

Maintain the records in an organized way in the original format, electronic and hard copy,
conducive to professional review and audit.
2-13.6.2 Record Inspection, Copying, and Auditing
Make your records available for inspection, copying, and auditing by State
representatives for the same time frame specified under section 5-1.27B. The records of
subcontractors and suppliers must be made available for inspection, copying, and
auditing by State representatives for the same period. Before Contract acceptance, the
Department of Public Works H-20 R-7259
City of Long Beach Division H – General Requirements

State representative notifies the Contractor, subcontractor, or supplier 5 business days
before inspection, copying, or auditing.
If an audit is to start more than 30 days after Contract acceptance, the State
representative notifies the Contractor, subcontractor, or supplier of the date when the
audit is to start.
2-13.7 Project Safety Reviews
Your assigned project safety representative must perform and document project safety
reviews with the Engineer:
1. At least 3 business days before the start of job site activities
2. Every other week after the start of job site activities and after any incident that results
in serious injury, illness, or fatality to your personnel, subcontractor’s and supplier’s
personnel, and any other persons present at the job site at the request of you or your
subcontractors
3. Submit project safety review documentation to the Engineer and correct deficiencies
within 3 business days from the day the project safety review is completed or sooner as
directed by the Engineer

Upon Contract acceptance, your project safety representative must participate in a safety
meeting with the Engineer.
2-13.8 Job Hazard Analyses
Prepare a job hazard analysis for each work activity to be performed on the job site as
required by CA Code of Regs § 3203(a)(4) and 1511(b).
Submit each job hazard analysis as an informational submittal.
Each job hazard analysis must identify the following:
1. Work activity description
2. Existing and predictable hazards associated with the work activity
3. Hazard control measures, preventative, or corrective actions to be taken for the work
activity
Submit each job hazard analysis at least 5 working days before the start of a work activity.
During the project safety reviews required under Section 5-1.28, discuss job hazard
analyses for active work activities and work activities planned to start within 5 business
days.
Submit a revised job hazard analysis when equipment or methods change results in a
change to the hazards previously identified. Submit a revised job hazard analysis within
one working day of the identified change.
2-13.9 Noncompliant And Unauthorized Work
Correct or remove and replace work that (1) does not comply with the Contract, (2) is
unauthorized, or (3) both. The Department does not pay for any of the following:
1. Corrective, removal, or replacement work
2. Unauthorized work

If ordered, submit a work plan for the corrective, removal, or replacement work.
Department of Public Works H-21 R-7259
City of Long Beach Division H – General Requirements

If you fail to comply promptly with an order under this Section 5-1.30, the Department may
correct, remove, or replace noncompliant or unauthorized work. The Department deducts
the cost of this work.
2-13.10 Job Site Appearance
Keep the job site neat. In areas visible to the public:
1. If practicable, dispose of debris removed during clearing and grubbing concurrently
with its removal. If stockpiling is necessary, dispose of debris weekly.
2. Furnish trash bins for construction debris. Place the debris in trash bins daily.
3. For falsework to be reused, stack the forms neatly and concurrently with their removal.
2-13.11 Areas For Use
Occupy the highway only for purposes necessary to perform the work.
If no State-owned area is designated for Contractor’s use, you may arrange for temporary
storage with the Department.
Defend, indemnify, and hold the City and State harmless to the same extent as under
section 7-1.05.
Department does not allow temporary residences within the highway.


SECTION 3 – CHANGES IN WORK

3-2 CHANGES INITIATED BY THE AGENCY.
3-2.2 Contract Unit Prices.

3-2.2.1 General. Replace this subsection with the following:
If the Engineer orders a change in quantity of an item of Work, and the change
does not involve a substantial change in character of the Work from that shown in the
Plans or Specifications, the City will adjust the total payment to be made for the item of
Work by multiplying the amount authorized and installed by the Contract Unit Price. This
amount may be greater or less than the amount shown in the Bid.
If the total quantity of a Major Bid Item is changed, only changes within 25% of the
quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price.
If the total quantity of a Major Bid Item is changed in excess of 25%, the adjustment in
payment will be made per 3-2.4. The adjustment in payment will be made only for the
quantity of the Major Bid Item that exceeds 25%, either increase or decrease.
3-2.2.2 Increases of More Than 25%.
Replace this subsection with the following:
If the total quantity of a Major Bid Item is increased in excess of 25% more than
the quantity shown in the Bid, and if the City and the Contractor cannot agree upon an
adjustment in Contract Unit Price, the Work shall proceed according to 3-3, and as
Department of Public Works H-22 R-7259
City of Long Beach Division H – General Requirements

follows:
The costs determined for the item of Work shall not include fixed costs. Fixed
costs shall be deemed to have been recovered by the Contractor through payment for
125% of the Bid quantity at the Contract Unit Price.
3-2.2.3 Decreases of More Than 25%. Replace this subsection with the
following:
If the total quantity of a Major Bid Item is decreased in excess of 25% less than the
quantity shown in the Bid, no adjustment in the Contract Unit Price will be made unless
so requested in writing by the Contractor. If the Contractor so requests, the adjustment
in payment will be made per 3-2.4. If no adjustment in Contract Unit Price can be agreed
upon by the City and the Contractor, the Work shall proceed according to 3-3, and as
follows:
In no case will payment be less than would be made for the actual quantity at the
Contract Unit Price, nor more than would be made for 75% of the Bid quantity at the
Contract Unit Price.

3-3 EXTRA WORK.
3-3.2 Payment.
3-3.2.3 Markup.

3-3.2.3.1 Work by Contractor.
Replace this subsection with the following:
The following percentages shall be added to the Contractor's costs and shall
constitute the markup for all overhead and profit:

Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%

One percent (1%) may also be added to the sum of costs and markups as
compensation for the Contractor's bond premium.
3-3.2.3.2 Work by Subcontractor. Replace this subsection with the following:
When a subcontractor performs all or any part of the extra work, the markups in 3-3.2.3.1
shall be added to the subcontractor's actual cost of such work. The Contractor may add
an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra
work and 5% on work added in excess of $5,000 of the subcontracted portion of work.
Add the following:
3-4 CHANGED CONDITIONS
Promptly notify the Engineer if you find either of the following conditions:
Department of Public Works H-23 R-7259
City of Long Beach Division H – General Requirements

1. Physical conditions differing materially from either of the following:
1.1. Contract documents
1.2. Job site examination
2. Physical conditions of an unusual nature, differing materially from those ordinarily
encountered and generally recognized as inherent in the work provided for in the
Contract

Include details explaining the information you relied on and the material differences you
discovered.
If you fail to promptly notify the Engineer, you waive your claim of a differing site condition
for the period between your discovery of the differing site condition and your notification
to the Engineer.
If you disturb the site after discovery and before the Engineer's investigation, you waive
the differing-site-condition claim.
3-4.1 Engineer's Investigation and Decision
Upon your notification, the Engineer investigates job site conditions and:
1. Notifies you whether to resume affected work
2. Decides whether the condition differs materially and is cause for an adjustment of
time, payment, or both

SECTION 4 – CONTROL OF MATERIALS

4-1 MATERIALS AND WORKMANSHIP
4-1.1 General. Add the following:
Store materials and samples in a way that preserves the quality and facilitates prompt
inspection.
Material incorporated into the work must be new.
Before the preconstruction conference, submit material source information on a Notice of
Materials to be Used form.

4-1.2 Protection of Work and Materials. Add the following:
The Contractor shall remove and replace materials damaged by the Contractor's
operations at the Contractor's sole expense before the final inspection and acceptance.

4-1.3.2 Inspection by the Agency Add the following:
If a material is to be inspected or tested at the job site, the material must be
authorized for use before it is incorporated into the work.
4-1.4 Test of Materials. Add the following:
The Contractor shall submit samples of materials, at the Contractor's sole
expense, as the Engineer may require, 15 days in advance of being incorporated in the
Department of Public Works H-24 R-7259
City of Long Beach Division H – General Requirements

Work to a testing laboratory designated by the City.
Samples of materials to be tested shall be properly identified and shall establish
exact nature and character of materials. The City may reject any material or part thereof
that proves defective as a result of testing and requires satisfactory replacement.
Add the following subsection:
4-1.4.1 Test Samples
This subsection applies where a test sample is specified or if a test sample is
requested.
Notify the Engineer 10 days before taking a sample.
Submit material to be tested with a Sample Identification Card. For the card, go to the
METS website.
Restore work immediately after sampling.
If requested, obtain the Department’s authorization for the material before incorporating
the material represented by the test sample into the work.

4-1.5 Certificates of Compliance Add the following:
The following applies (1) where a certificate of compliance is specified and (2) if any
material is produced outside the United States.
Submit a certificate of compliance:
1. Before the material is incorporated into the work
2. For each lot of the material. Identify the lot on the certificate.
3. Signed by the producer of the material and stating that the material complies with
the Contract.

4-1.6 Trade Names or Equals. Add the following:
Where a specific manufacturer is noted on the Plans or listed in the Specifications,
unless otherwise noted, an "approved equal" item may be substituted.
If a Bidder desires to bid an "approved equal" item, the Bidder shall submit a
request to do so to the Engineer in writing by the time and as shown in the Instructions to
Bidders.
Add the following subsection:
4.1.9 Equipment
Legibly stencil or stamp at a clearly visible location on each piece of equipment except
hand tools an identifying number and:
1. On compacting equipment, its make, model number, and empty gross weight that
is either the manufacturer's rated weight or the scale weight
2. On meters and on the load-receiving element and indicators of each scale, the
make, model, serial number, and manufacturer's rated capacity

Department of Public Works H-25 R-7259
City of Long Beach Division H – General Requirements

Submit a list describing each piece of equipment and its identifying number.
Upon request, submit the manufacturer's information that designates portable vehicle
scale capacities.
For proportioning materials, use measuring devices, material plant controllers, and
undersupports complying with section 9-1.02B,
The indicator over-travel must be at least 1/3 of the loading travel. The indicators must be
enclosed against moisture and dust.
Group the measuring system dials such that the smallest increment for each indicator
can be read from the location at which proportioning is controlled.

Add the following section:
4-2 QUALITY ASSURANCE
4-2.1 General
This section includes provisions related to quality.
Quality assurance includes all activities used to
(1) provide an overall level of quality for the project and
(2) determine compliance with the Contract documents.
Quality control includes sampling, testing, and inspections performed under your QC
program to (1) control material quality and (2) ensure the specified quality characteristics
for the project are met.
Department acceptance includes sampling, testing, and inspections performed by the
Department to verify compliance with the Contract.
The Department's independent assurance program is described in the Department's
Independent Assurance Manual: Procedures for Accreditation of Laboratories and
Qualification of Testers. For the manual, go to the Caltrans METS website.
For a material specified to comply with a State Specification number, the material may
comply with a later version of the specification. Obtain State Specifications from Caltrans
METS.
For a material specified to comply with a requirement for a quality characteristic shown in
the following table, the quality characteristic is tested under the corresponding California
Test:
California Tests
Quality characteristic California Test
Relative compaction 216 or 231
Sand equivalent 217
Resistance (R-value) 301
Gradation (sieve analysis) 202
Durability index 229
Department of Public Works H-26 R-7259
City of Long Beach Division H – General Requirements

4-2.2 Authorized Facility Audit Lists
This subsection applies where a facility is specified to be on an Authorized Facility Audit
List.
An audit authorized by the Department not more than 3 years before completion of the
fabrication process is acceptable if the Department determines the audit was for the same
type of work to be performed.
For procedures to be included on an Authorized Facility Audit List, go to the Authorized
Facility Audit List website.
4-2.3 Authorized Material Lists.
This subsection applies where a material is specified to be on an Authorized Material List.
The material must be on an Authorized Material List before it is incorporated into the work.
For procedures to be included on an Authorized Material List, go to the Authorized
Material List website.

4-3 QUALITY CONTROL
4-3.1 General
Material production and testing equipment must measure accurately and precisely.
4-3.2 Quality Control Program
Develop, implement, and maintain a QC program. Prepare and maintain QC records,
including:
1. Names and qualifications of:
1.1. Samplers
1.2. Testers
1.3. Inspectors
2. Testing laboratories' identification and certifications
3. Testing equipment calibrations and certifications
4. Inspection reports
5. Sampling and testing records organized by date and type of material
6. Test results with comparison of quality characteristic requirements
7. Test results in relation to action and any suspension limits
8. Records of corrective actions and suspensions
Within 24 hours, notify the Engineer of any noncompliance identified by your QC
program. Allow the Department access to all QC records.
Submit QC test data and QC test results within 2 business days of test completion.
4-3.3 Quality Control Manager
This subsection applies to work requiring a QC manager.
The QC manager must be responsible directly to you for the quality of the work, including
materials and workmanship performed by you and your subcontractors.
Department of Public Works H-27 R-7259
City of Long Beach Division H – General Requirements

Assign the QC manager before the start of the affected work. The QC manager must be
the sole individual responsible for:
1. Receiving, reviewing, and approving all correspondence, submittals, and reports
before they are submitted to the Department
2. Signing the QC plan
3. Implementing the QC plan
4. Maintaining the QC records

The QC manager must be your employee or must be hired by a subcontractor
providing only QC services. The QC manager must not be employed or compensated
by a subcontractor or by other persons or entities hired by subcontractors who will
provide other services or materials for the project.
Notify the Engineer of the name and contact information of the QC manager.
4-3.4 Quality Control Plans
Submit 7 copies of each authorized QC plan.
Make 1 copy available at each location where work is performed.

4-4 CITY ACCEPTANCE
4-4.1 General
The Department may use multiple acceptance methods for a material.
Specifications in sections titled "Department Acceptance" do not include all
requirements on which the Department makes its acceptance.
The Department may inspect, sample, and test materials for compliance with the
Contract at any time.
Allow the Department to record, including photograph and video, to ensure a material is
produced to comply with the Contract.
You may examine the records and reports of tests the Department performs.
Schedule work to allow time for the Department's inspection, sampling, and testing.
The Department deducts testing costs for work that does not comply with the Contract.
The Department may retest material previously tested and authorized for use. If the
Department notifies you of a retest, furnish resources for retesting.

SECTION 5 – UTILITIES

Department of Public Works H-28 R-7259
City of Long Beach Division H – General Requirements

5-1 LOCATION. Replace with the following:
5-1.1 General
The City has determined the locations of all known existing subsurface facilities
from records and field investigations and these facilities are shown on substructure
drawings, which are included in the Plans. However, the City does not guarantee the
accuracy of the indicated locations or that all facilities are shown.
The Contractor shall conduct potholing at least two weeks prior to any other
excavation. Any discrepancies between field conditions and the Plans and Specifications
shall be submitted to the Engineer in writing for review.
The City may arrange for and conduct a preconstruction meeting between the
Contractor, the Engineer, and the utility owners to discuss scheduling, coordination of any
required utility relocations, and the protections of existing utilities. The Contractor shall
attend any preconstruction meeting scheduled by the Agency and shall cooperate with all
utility owners performing utility markings, relocation or installation work of the Project site.
5-1.2 Nonhighway Facilities
Before starting work that could damage or interfere with underground infrastructure,
locate the infrastructure described in the Contract, including laterals and other
appurtenances, and determine the presence of other underground infrastructure inferred
from visible facilities, such as buildings, meters, and junction boxes.
Underground infrastructure described in the Contract may be in different locations from
those described, and additional infrastructure may exist.
Upon discovering an underground main or trunk line not described in the Contract,
immediately notify the Engineer and the infrastructure owner. The Engineer orders the
locating and protecting of the infrastructure.
The locating and protecting is change order work. If ordered, repair infrastructure
damage. If the damage is not due to your negligence, the repair is change order work.
Immediately notify the Engineer of a delay due to the presence of main-line underground
infrastructure not described in the Contract or in a substantially different location.
Notify the Engineer if the infrastructure described in the Contract cannot be found. If after
giving the notice, you find the infrastructure in a substantially different location from that
described, finding the infrastructure is change order work.
5-1.3 Nonhighway Facility Rearrangement
The Department may rearrange a nonhighway facility during the Contract.
Rearrangement of a nonhighway facility includes installation, relocation, alteration, or
removal of the facility.
The Department may authorize facility owners and their agents to enter the highway to
perform rearrangement work for their facilities or to make connections or repairs to their
property. Coordinate activities to avoid delays.
Department of Public Works H-29 R-7259
City of Long Beach Division H – General Requirements

If necessary rearrangement of underground infrastructure is not described in the Contract,
the Engineer may order you to perform the work. The rearrangement is change order
work.
Immediately notify the Engineer of a delay due to a rearrangement different from that
described in the Contract.
If you want infrastructure rearrangement different from that described in the Contract:
1. Notify the Engineer
2. Make an arrangement with the infrastructure owner
3. Obtain authorization for the rearrangement
4. Pay the infrastructure owner any additional cost

The Department does not adjust time or payment for a rearrangement different from that
described the Contract.

5-3 REMOVALS.
Add the following:
The Contractor shall remove interferences shown on the Plans, other than utilities,
to clear construction by at least 12 inches.

5-4 RELOCATION.
Add the following:
The Contractor shall perform work on utilities only when authorized by the utility’s
owner and only using the services of firms pre-qualified by the owner.

Add the following subsection:
5-4.1 Resetting Vaults and Other Appurtenances.
Certain manholes, vaults, valve boxes or other appurtenances belonging to utility
companies or others may need resetting to grade. The City does not guarantee that all
such items are shown on the Plans. The Contractor is not required to do the work of
resetting such to grade, except sewer and storm drain manholes, Long Beach Gas & Oil
Department and Long Beach Water Department valve boxes and meter boxes, and City-
owned communications vaults; however, the Contractor shall notify the owners at least
one week in advance of construction to give them opportunity to perform the necessary
work in conjunction with Work performed by the Contractor.
Add the following section:
5-7 UNKNOWN FACILITIES.
If the Contractor encounters any unknown facility, or if any known facility's actual
location is greatly different than the Plans indicate, the Contractor shall immediately notify
the Engineer and not disturb the facility except in the presence of the Engineer.
Add the following section:
Department of Public Works H-30 R-7259
City of Long Beach Division H – General Requirements

5-8 FACILITIES REQUIRING SPECIAL PRECAUTIONS.
The Contractor's attention is directed to the existence of certain underground
facilities that may require that Contractor take special precautions to protect the health,
safety and welfare of workers and the public. Facilities requiring special precautions
include but are not limited to: conductors of petroleum products, oxygen, chlorine, and
toxic or flammable gases; natural gas in pipelines; underground electric supply system
conductors or cables either directly buried or in duct or conduit which do not have
concentric neutral conductors or other effectively grounded metal shields or sheaths; and
underground electrical conductors with a potential-to-ground of more than 300 volts. The
Contractor shall notify the Engineer at least 48 hours before performing any Work in the
vicinity of such facilities.
If such facilities are not located on the Plans in both alignment and elevation, the
Contractor shall perform no Work in the vicinity of these facilities until the owner, or its
representative, has located the facility by potholing, probing, as-built plans or other means
that will locate and identify the facility.
5-9 GENERAL REQUIREMENTS WHEN WORKING AROUND LONG BEACH
ENERGY RESOURCES (LBER) FACILITIES.
All excavations, whether in the public right of way, or on private property require a valid
Dig Alert Ticket from Underground Service Alert of Southern California (USASC).
Excavators MUST contact USASC by dialing 811 at least 48 hours prior to any excavation
work. LBER, and all other underground facility operators will locate and mark existing
substructures at no charge in delineated areas.

The excavator shall immediately contact LBER Inspection upon damaging or exposing
any LBER main or service. All active LBER facilities, including gas distribution mains &
services, shall be protected in place by the excavator. Wrap damage of LBER mains or
services will be repaired by LBER free of charge. Any other damage to LBER’s facilities
will be repaired by LBER at the excavator’s expense. Any repair or relocation work
required on LBER’s facilities can solely be performed by LBER and will be subject to
LBER’s availability of resources.

Any exposed, active LBER main or service shall be supported at the excavator’s expense
with an approved LBER method. Any active LBER main or service exposed for a duration
longer than 5 days shall be protected from exposure to sunlight. The support design shall
be submitted to LBER Engineering for approval prior to implementation.

A minimum 12” clearance around LBER’s facilities shall be maintained by the excavator
when installing new pipelines or other structures near LBER facilities. The excavator shall
notify LBER Inspection prior to backfilling around any active LBER main or service. The
backfill material & method used by the excavator is subject to LBER Inspection’s review
& approval.
LBER contacts: LBER Engineering/Inspection – (562) 570-2085
LBER 24-Hour Emergency Line – (562) 570-2140
Department of Public Works H-31 R-7259
City of Long Beach Division H – General Requirements


SECTION 6 – PROSECUTION, PROGRESS, AND
ACCEPTANCE OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

Replace the entire subsection with the following:

6-1.1 Construction Schedule.

6-1.1.1 Terms and Definitions. The following terms and their respective definitions are
in addition to those specified in 1-2.

As-Built Schedule – The final updated Construction Schedule that reflects actual
construction progress throughout the entire duration of the Project.

Baseline Schedule – The original Construction Schedule used as the basis for
measuring construction progress and Contract performance.

Constraint – A requirement that restricts or dictates the Construction Schedule.

Construction Schedule – The schedule of construction activities that reflects the
means and methods, planned sequencing, duration, and Milestone dates for the
completion and acceptance of the Work. Types include the Baseline Schedule, Weekly
Schedule Update, Monthly Schedule Update, and the As-Built Schedule.

Critical Path – The sequence of activities shown on the Construction Schedule which
adds up to the longest overall duration.

Data Date – The latest date through which the activities shown on the Construction
Schedule have been updated.

Milestone – A schedule activity that has zero duration and which graphically
represents the start or finish of a portion of the Work.

Monthly Schedule Update – An updated Construction Schedule submitted every
month that compares actual construction progress versus the progress planned on the
Baseline Schedule.

Total Float - the maximum amount of time an activity can be delayed from its early
start without delaying the completion of the Work. Float shall be an expiring resource
available to both the Contractor and the Agency. Float shall not be for the exclusive use
or benefit of either the Agency or the Contractor.

Department of Public Works H-32 R-7259
City of Long Beach Division H – General Requirements

Weekly Schedule Update – An updated Construction Schedule submitted every
week that reflects the status of construction activities from the past week and also
includes construction activities scheduled in detail for the following 2 weeks.

6-1.1.2 General. Construction schedules shall conform to the following requirements:

a) The Construction Schedule shall be prepared using the latest version of
Primavera "Suretrak", Microsoft "Project Professional", Primavera "Project Planner
(P6)", or Agency-approved equal.

b) The Construction Schedule shall be prepared using the Critical Path Method
(CPM) illustrating the chronological relationship and sequence of work activities.
Activities on the Critical Path shall be clearly delineated.

c) Work activities shall be based on the Bid items listed in the Schedule of Prices
in the Bid Proposal and the following:

i) Bid Items shall be subdivided into those portions to be constructed during each
stage or phase of construction, or portions which do not exceed 20 Working
Days, whichever is less.

ii) Each activity shall be identified with its corresponding Bid item number(s) or
Change Order item number(s) listed in the Engineer’s Monthly Estimate.

iii) Each submittal, and the corresponding Agency review period, shall be shown
as an individual activity.

iv) Submittals which must be accepted prior to issuance of the NTP shall be
identified.

v) The procurement of construction materials and equipment shall be identified
and shown as individual activities.

vi) Work to be performed by subcontractors shall be identified and shown as
individual activities.

vii) NTP requirements shall be shown as individual activities.

vii) Each submittal of the Equal Employment Opportunity Form per 7-2.6 shall be
shown as a separate activity

d) Start and completion dates of each work activity shall be illustrated.

e) The Construction Schedule shall commence on the date of issuance of the
NTP and end on the date of fulfillment of all of the requirements in the Contract
Documents.
Department of Public Works H-33 R-7259
City of Long Beach Division H – General Requirements


f) Change Orders, including number, description, approval date, and duration shall be
shown as individual activities.

g) The schedule shall reflect the following Constraints:

i) Utility relocations per 5-4.

ii) Schedule impacts due to the protection, removal, or relocation of utilities per 5-1.
Sequencing and phasing of work shall be clearly outlined to provide for
reasonable time to respond to utility marking requests.

iii) The Sequence of Work per 6-2.3

iv) Temporary traffic control requirements per Section TTC of the Special
Provisions.

v) The Time of Completion per 6-7. A Baseline Schedule submitted showing
completion earlier or later than the time of completion specified will not be
accepted.

h) The schedule activities shall include the following information:

i) Activity ID

ii) Bid Item No(s).

iii) Activity Name

iv) Original Duration

v) Actual Duration

vi) Start Date

vii) Finish Date

viii) Actual Start Date

ix) Actual Finish Date

x) Total Float

6-1.1.3 Submittals.

a) Baseline Schedule.
Department of Public Works H-34 R-7259
City of Long Beach Division H – General Requirements


Within 10 Days of issuance of the NTP, the Contractor shall submit a Baseline
Schedule for review and acceptance by the Engineer in accordance with 2-5.3 and
6-1.1.3.

The Baseline Schedule submittal shall include a portable document file (pdf) and
a program file, accessible using the latest version of Primavera "Suretrak",
Microsoft "Project Professional", Primavera “Project Planner (P6)”, or Agency-
approved equal. The schedule may be emailed to the Engineer or submitted on a
compact disc (CD) along with 2 printed color copies on 11-inch x 17-inch sheets.

b) Bi-weekly Schedule Updates. During the bi-weekly on-site management
meetings, the Contractor shall submit Weekly Schedule Updates using the same
software used to prepare the Baseline Schedule. The schedule updates will be
used to manage, coordinate, and schedule all upcoming Contract activities. These
detailed schedules may be submitted in bar chart format and shall reflect the logic
and sequence used for the accepted Baseline Schedule. The Weekly Schedule
Update shall include the following:

i) Status of the construction activities of the past week, scheduled vs. actual.

ii) An explanation for deviations from planned activities, together with actions
taken or planned to recover lost time, if applicable.

iii) Two-week "look-ahead" Schedule detailing all work activities p l a n n e d for
the next 2 weeks, including all work to be performed by others. Activities
included in the Baseline Schedule shall be further broken down into detailed
activities, by specific task, by specific area, at the crew level or lower.

c) As-Built Schedule. Within 7 Days after completion of the Work per 6-8.1, the
Contractor shall prepare and submit an As-Built Construction Schedule using
the same software used to prepare the Baseline Schedule. The Engineer will not
submit the f i n a l progress payment for processing until the s c h e d u l e has
been submitted. The schedule may be emailed to the Engineer or submitted on a
CD with 2 printed color copies on 11-inch x 17-inch sheets.

The As-Built Schedule shall reflect the actual progress of the Work from the
date of issuance of the NTP through the date of completion. Should the As-Built
Schedule not reflect the actual start and finish dates of all work activities, the
schedule will be returned to the Contractor for revision and re-submittal.

The schedule shall be submitted with a written certificate signed by the
Contractor’s Authorized Representative stating:

“To my knowledge and belief, the enclosed As-Built Schedule reflects
the actual start and finish dates of the actual work activities for the
Contract contained herein.”

Department of Public Works H-35 R-7259
City of Long Beach Division H – General Requirements

6-1.1.4 Payment. Payment for preparation of Schedule shall be considered as
included in the prices for the various items of Work, and the City will make no additional
payment therefor.

No separate or additional payment will be made for preparation of each Bi-weekly
Schedule Update.

Contractor’s failure to update and obtain approved of said updates of the baseline
schedule will constitute withholding of any future progress payments until such time as
the schedule is updated and accepted by the City.
6-1.2 Commencement Of Work.
Add the following:
The Contractor shall commence work on the date to be specified in a written
"Notice to Proceed" from the City and complete all Work within the time stated in Division
B. The Contractor shall begin the procurement of materials within 5 working days after
approval by the Engineer of shop drawings and submittals relating to equipment and
materials.
Notice to Procure – After award of contract, the Contractor shall prioritize preparation
and submission of shop drawings for the wayfinding signage, which is considered a
critical long-lead item for the Project. Signage shop drawings shall be submitted as soon
as practicable following Contract award to allow for sufficient time for review, approval,
procurement, and fabrication. After approval of shop drawings, the City will issue to the
Contractor a written "Notice to Procure" for all long lead items necessary to construct
the Work. Within five working days after receipt of this Notice, the Contractor shall place
orders for long lead items. Within the same five days, the Contractor shall submit copies
of the orders to the City, along with the manufacturer's estimated delivery dates.

As soon as the Contractor receives notification of delivery of the equipment and
materials, the Contractor shall notify the City and submit a construction schedule.
For a project that does not require a SWPPP, start job site activities with 15 working days
after receiving notice that the Contract has been approved by the Attorney General or the
appointed and authorized to represent the Department.
For a project the requires a SWPPP, start job site activities within 55 days after receiving
notice that the Contract has been approved by the Attorney General or the attorney
appointed and authorized to represent the Department.
Submit a notice 72 hours before starting job site activities. If the project has more than 1
work location, submit a separate notice for each location.
You may start job site activities before receiving notice of Contract approval if you:
1. Deliver the signed Contract, bonds, and evidence of insurance to the Department
2. Submit a 72-hour notice
3. Obtain an encroachment permit from the Department
4. Receive the Department's authorization to start
5. Perform work at your own risk
Department of Public Works H-36 R-7259
City of Long Beach Division H – General Requirements

6. Perform work under the Contract

If the Contract is approved, work already performed that complies with the Contract is
authorized.
If the Contract is not approved, leave the job site in a neat condition. If a facility has been
changed, restore it to its former condition or an equivalent condition. The Department
does not pay for the restoration.
The Department does not adjust time for work performed before Contract approval.

The Contractor shall submit a written proposed construction schedule to the
Engineer at the preconstruction conference required in Subsection 6-1.3. The Contractor
shall submit updated construction schedules biweekly.

Add the following subsection:
6-1.3 Preconstruction Conference.
Attend a preconstruction conference with key personnel, including your assigned
representative, at a time and location determined by the Engineer. Submit documents as
required before the preconstruction conference. You may start work before the
preconstruction conference.
Be prepared to discuss the topics and documents shown in the following table:

Topic Document
Potential claim and dispute
resolution
Potential claim forms
Contractor's representation Assignment of Contractor's representative
DBE and DVBE Final utilization reports
Equipment Equipment list
Labor compliance and equal
employment opportunity
Job site posters and benefit and payroll reports
Material inspection Notice of Materials to be Used form
Materials on hand Request for Payment for Materials on Hand form
Measurements --
Partnering --
Quality control QC plans
Safety Injury and Illness Prevention Program, Code of Safe
Practices, and job site posters
Schedule Baseline schedule and Weekly Statement of Working Days
form
Subcontracting Subcontracting Request form
Surveying Survey Request form
Traffic control Traffic contingency plan and traffic control plans
Utility work --
Department of Public Works H-37 R-7259
City of Long Beach Division H – General Requirements

Weight limitations --
Water pollution control SWPPP or WPCP
Work restrictions PLACs
Action submittals --
Add the following subsection:
6-1.4 Notices.
The Contractor shall give advance notice, shown below, to the proper office prior
to the time each of the following operations is to be commenced.
Operation Office Phone Advance
Notice
Start of Work

City Inspection Section (562) 570-5160 2 working days
Shutdown of work
or resumption of
work after
shutdown

City Inspection Section (562) 570-5160 2 working days
Ramp Closure

State Inspector and
State Traffic
Management Center

Refer to State
Permit


7 working days

Traffic Striping and
Signs

City Inspection Section (562) 570-5160 3 working days
Caltrans Lighting or
Electrical Facilities

State Electrical
Inspector

Refer to State
Permit

7 working days


*Notify the Inspection Section before notifying these offices.

The Contractor shall notify the owners of all utilities at least 48 hours before any
excavation or work adjacent to utility structures. The utility companies listed below can
be contacted as indicated.
1. LACSD
Esther Kang
Engineering Counter Coordinator, Sewer Design
562-908-4288 ext. 1204
engineeringcounter@lacsd.org

2. City of Long Beach Water Department or USA/SC
(Water, Sewer and Storm Drain Facilities)
Operations Service Center
Telephone: (562) 570-2389 or (562) 570-2390

Department of Public Works H-38 R-7259
City of Long Beach Division H – General Requirements

3. Southern California Edison Company or USA/SC
Telephone: 1-800-655-4555

4. Long Beach Utilities
(Gas, Water, Sewer and Storm Drain Facilities)
Telephone: (562) 570-5700

6-1.5 Weekly Update Meetings.
The Agency will schedule and conduct weekly meetings for the purposes of construction
management as well as assessing the status of the informal partnership. The weekly
meetings will have a set agenda, including, but not limited to, a report and discussion of
the status of the following:

a) Weekly Detailed Schedule per 6-1.1(d).
b) Quality assurance/quality control
c) BMPs/SWPPP Compliance
d) Site operations, including coordination of work by others
e) Community/public relations
f) Change Orders
g) Submittals
h) RFI’s

6-2 PROSECUTION OF THE WORK.
Add the following subsection:

6-2.3 Sequence of Work. Add the following:
The Contractor’s construction schedule and sequence of work shall conform to the
following:

a) The first order of construction work shall be any construction work specified as
such in 6-1.2 or on the Plans.
b) The surface course of pavement shall be scheduled to follow completion of
parkway improvements throughout the length of the Project unless otherwise
approved in writing by the Engineer.
c) Unless otherwise directed by the Engineer, all parkway improvements behind
the curb and gutter shall be completed immediately following completion of a
continuous pour of curb and gutter. This requirement shall not be interpreted to
prohibit the Contractor from performing concurrent work.

6-6 DELAYS AND EXTENSION OF TIME
Replace the following subsection:
6-6.1 General.
If delays are caused by unforeseen events beyond the control of the Contractor, such
delays will entitle the Contractor to an extension of the Contract time as provided herein,
Department of Public Works H-39 R-7259
City of Long Beach Division H – General Requirements

but the Contractor will not be entitled to damages or additional payment due to such
delays, except as otherwise specified in 6-6.3.

Such unforeseen events may include:
1. Adverse weather or elements necessitating cessation of work,
2. Traffic maintenance under the Contract.
3. Suspension of a controlling activity that you and the Engineer agree benefits both
parties.
4. Unanticipated event not caused by either party, such as:
• War
• Government Regulations
• Fires
• Floods
• Act of God
• Act of a public enemy.
• Epidemic.
• Fire.
• Governor-declared state of emergency.
• Landslide.
• Quarantine restriction.
5. Issue involving a third party, including:
• Strikes
• inability to obtain materials, labor or equipment,
• Freight embargo.
• Jurisdictional requirement of a law enforcement agency.
• labor disputes
• Workforce labor dispute of a utility or nonhighway facility owner resulting in a
nonhighway facility rearrangement not described and not solely for the
Contractor's convenience. Rearrangement of a nonhighway facility includes
installation, relocation, alteration, or removal of the facility.
6. Required Extra Work
7. Other specific events as may be further described in the Special Provisions.

No extension of time will be granted for a delay caused by the Contractor's inability to
obtain materials unless the Contractor furnishes to the Engineer documentary proof.
The proof must be provided in a timely manner in accordance with the sequence of the
Contractor's operations and the approved construction schedule.

If delays beyond the Contractor's control are caused by events other than those
mentioned above, the Engineer may deem an extension of time to be in the best
interests of the Agency. The Contractor will not be entitled to damages or additional
payment due to such delays, except as otherwise specified in 6-6.3.

If delays beyond the Contractor's control are caused solely by action or inaction by the
Agency, such delays will entitle the Contractor to an extension of time per 6-6.2.
Department of Public Works H-40 R-7259
City of Long Beach Division H – General Requirements


6-7 TIME OF COMPLETION.
Add the following subsections:
6-7.4 Additional Requirements. Add the following:
The Contractor shall perform no Work on days other than Working Days or outside
of normal working hours (defined as the hours between 7:00 a.m. to 4:00 p.m.) without
the consent of the Engineer, unless otherwise specified. In any event, all Work shall be
subject to approval of the Engineer. Before starting such work, the Contractor shall make
arrangements with the Engineer for the continuous or periodic inspection of the work and
tests of materials, when necessary. If the Contractor requests permission to work outside
of the above time periods and if the City grants such request, the Contractor shall pay all
extra expense to the City for inspection and other incidental expenses caused by such
overtime work. If the City requests the Contractor to work overtime or if overtime work is
specifically required by these Specifications, the City will pay all extra expense of
inspection.
Due to the proximity of educational facilities, bicycle facilities, and pedestrian
routes within the Project vicinity, construction activities requiring pedestrian detours (See
Division F for additional information), bridge access restrictions, traffic control, lane
closures, or Caltrans right-of-way closures shall be performed during Summer 2027
construction window. Contractor shall coordinate all procurement, fabrication, submittals
permits, Caltrans approvals, and construction activities to allow commencement of field
construction no later than June 2027, and Final Completion no later than August 2027.
Contractor’s Baseline Schedule shall demonstrate compliance with this requirement.
If the Contractor finds it necessary, in order to complete the work according to
schedule, to perform certain of its operations outside of Working Days or normal working
hours, these operations shall be performed as part of the Work included in the Contract
Price and shall not constitute a basis for additional payments.

6-8 COMPLETION, ACCEPTANCE, AND WARRANTY.
Add the following subsection:
Upon acceptance by the Engineer, the Engineer will file a Notice of Completion
with Los Angeles County Recorder. The date the Notice of Completion is filed will be the
date of acceptance of the Work and the date the Contractor is relieved from responsibility
to protect the Work.
The acceptance of the Work or the payment of any money by the City shall not
operate as a waiver of any provision of the Contract, or of any power reserved to the City,
or of any right to damages or indemnity provided in the Contract. The waiver of any
breach of the Contract, or any default hereunder, shall not be held to be a waiver of any
other or subsequent breach or default.
The Contractor shall guarantee all Work against failure due to defective materials
and faulty workmanship for a period of 1 year after the date of acceptance of the Work by
the City, unless some longer period is expressly set forth in any manufacturer's warranty
or within the Specifications.
Department of Public Works H-41 R-7259
City of Long Beach Division H – General Requirements

When the City discovers defective material or workmanship that requires repair or
replacement under guarantee, the Contractor shall furnish all necessary labor, materials,
and equipment to correct and make good, at no expense to the City, all such defects.
The Contractor shall commence repair or replacement within 24 hours after receiving
written notice from the Engineer, and diligently and continuously perform the Work until
the repair or replacement is completed and the City has accepted it.
6-8.2 Final Inspection and contract Acceptance. Add the following:
When you complete the work, request the Engineer's final inspection.
If the Engineer determines that the work is complete, the Engineer recommends
Contract acceptance. Immediately after Contract acceptance, you are relieved from:
1. Maintenance and protection duties
2. Responsibility for injury to persons or property or damage to the work occurring after
Contract acceptance except as specified in Division H Section 6-8.3.
6-8.3 Guarantee. Replace the following:
Guarantee that work remains free from substantial defects for 1 year after Contract
acceptance except for work parts for which you were relieved of maintenance and
protection. Guarantee each of these relieved work parts for 1 year after the relief date.
The guarantee excludes damage or displacement caused by an event outside your
control, including:
1. Normal wear and tear
2. Improper operation
3. Insufficient maintenance
4. Abuse
5. Unauthorized change
6. Act of God

During the guarantee period, repair or replace each work part having a substantial defect.
The Department does not pay for corrective work.
During corrective work activities, provide the same insurance specified before Contract
acceptance.
The Contract bonds must be in force until the later of (1) the expiration of the guarantee
period or (2) the completion of the corrective work.
If a warranty specification conflicts with this subsection, comply with the warranty
specification.
During the guarantee period, the Engineer monitors the completed work. If the Engineer
finds work having a substantial defect, the Engineer lists the defective work parts and
furnishes you the list.
Within 10 days of receipt of the list, submit for authorization a detailed plan for correcting
the work. Include a schedule that includes:
Department of Public Works H-42 R-7259
City of Long Beach Division H – General Requirements

1. Start and completion dates
2. List of labor, equipment, materials, and any special services you plan to use
3. Work related to the corrective work, including traffic control and temporary and
permanent pavement markings

The Engineer notifies you when the plan is authorized. Start the corrective work and
related work within 15 days of notice.
If the Engineer determines corrective work is urgently required to prevent injury or
property damage:
1. The Engineer furnishes you an order to start emergency repair work and a list of
parts requiring corrective work
2. Mobilize within 24 hours and start work
3. Submit a corrective work plan within 5 business days of starting the emergency
repair work

If you fail to perform the work as specified, the Department may perform the work and bill
you.

6-9 LIQUIDATED DAMAGES. Add the following:
The City will assess liquidated damages at the rate of $4,800 per calendar day that
the Contractor exceeds the specified time of completion.

6-11 CLAIMS RESOLUTION. Add the following subsection:

6-11.1 Compliance with Mandatory Procedures. Contractor’s use of the claims
resolution process available in Public Contract Code Section 9204 (as set forth below in
Section 6-11.2) shall not satisfy or otherwise excuse Contractor’s compliance with the
mandatory notice and claim presentation procedures pursuant to Chapter 5
(commencing with Section 930) of Part 3 of Division 3.6 of Title 1 of the California
Government Code.
6-11.2 Public Contract Code Section 9204.
Section 9204 is added to the Public Contract Code, to read:
The Legislature finds and declares that it is in the best interests of the state and its citizens
to ensure that all construction business performed on a public works project in the state
that is complete and not in dispute is paid in full and in a timely manner.
Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with
Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of
Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this
section shall apply to any claim by a Contractor in connection with a public works project.
For purposes of this section:
Department of Public Works H-43 R-7259
City of Long Beach Division H – General Requirements

1. “Claim” means a separate demand by a contractor sent by registered mail or certified
mail with return receipt requested, for one or more of the following:
(a) A time extension, including, without limitation, for relief from damages or
penalties for delay assessed by a public entity under a contract for a public
works project.
(b) Payment by the public entity of money or damages arising from work done by,
or on behalf of, the contractor pursuant to the contract for a public works
project and payment for which is not otherwise expressly provided or to which
the claimant is not otherwise entitled.
(c) Payment of an amount that is disputed by the public entity.
2. “Contractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who has entered into a direct contract with a public entity for a public works project.
3. “Public entity” means, without limitation, except as provided in subparagraph 4.
below, a state agency, department, office, division, bureau, board, or commission,
the California State University, the University of California, a city, including a charter
city, county, including a charter county, city and county, including a charter city and
county, district, special district, public authority, political subdivision, public
corporation, or nonprofit transit corporation wholly owned by a public agency and
formed to carry out the purposes of the public agency.
4. “Public entity” shall not include the following:
(a) The Department of Water Resources as to any project under the jurisdiction
of that department.
(b) The Department of Transportation as to any project under the jurisdiction of
that department.
(c) The Department of Parks and Recreation as to any project under the
jurisdiction of that department.
(d) The Department of Corrections and Rehabilitation with respect to any project
under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000)
of Title 7 of Part 3 of the Penal Code.
(e) The Military Department as to any project under the jurisdiction of that
department.
(f) The Department of General Services as to all other projects.
(g) The High-Speed Rail Authority.
Department of Public Works H-44 R-7259
City of Long Beach Division H – General Requirements

5. “Public works project” means the erection, construction, alteration, repair, or
improvement of any public structure, building, road, or other public improvement of
any kind.
6. “Subcontractor” means any type of contractor within the meaning of Chapter 9
(commencing with Section 7000) of Division 3 of the Business and Professions Code
who either is in direct contract with a contractor or is a lower tier subcontractor.
Upon receipt of a claim pursuant to this section, the public entity to which the claim applies
shall conduct a reasonable review of the claim and, within a period not to exceed 45 days,
shall provide the claimant a written statement identifying what portion of the claim is
disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a
contractor may, by mutual agreement, extend the time period provided in this subdivision.
The claimant shall furnish reasonable documentation to support the claim.
If the public entity needs approval from its governing body to provide the claimant a written
statement identifying the disputed portion and the undisputed portion of the claim, and
the governing body does not meet within the 45 days or within the mutually agreed to
extension of time following receipt of a claim sent by registered mail or certified mail,
return receipt requested, the public entity shall have up to three days following the next
duly publicly noticed meeting of the governing body after the 45-day period, or extension,
expires to provide the claimant a written statement identifying the disputed portion and
the undisputed portion.
Any payment due on an undisputed portion of the claim shall be processed and made
within 60 days after the public entity issues its written statement. If the public entity fails
to issue a written statement, paragraph 3, below, shall apply.
1. If the claimant disputes the public entity’s written response, or if the public
entity fails to respond to a claim issued pursuant to this section within the time
prescribed, the claimant may demand in writing an informal conference to
meet and confer for settlement of the issues in dispute. Upon receipt of a
demand in writing sent by registered mail or certified mail, return receipt
requested, the public entity shall schedule a meet and confer conference
within 30 days for settlement of the dispute.
2. Within 10 business days following the conclusion of the meet and confer
conference, if the claim or any portion of the claim remains in dispute, the
public entity shall provide the claimant a written statement identifying the
portion of the claim that remains in dispute and the portion that is undisputed.
Any payment due on an undisputed portion of the claim shall be processed
and made within 60 days after the public entity issues its written statement.
Any disputed portion of the claim, as identified by the contractor in writing,
shall be submitted to nonbinding mediation, with the public entity and the
claimant sharing the associated costs equally. The public entity and claimant
shall mutually agree to a mediator within 10 business days after the disputed
portion of the claim has been identified in writing. If the parties cannot agree
Department of Public Works H-45 R-7259
City of Long Beach Division H – General Requirements

upon a mediator, each party shall select a mediator and those mediators shall
select a qualified neutral third party to mediate with regard to the disputed
portion of the claim. Each party shall bear the fees and costs charged by its
respective mediator in connection with the selection of the neutral mediator. If
mediation is unsuccessful, the parts of the claim remaining in dispute shall be
subject to applicable procedures outside this section.
For purposes of this section, mediation includes any nonbinding process,
including, but not limited to, neutral evaluation or a dispute review board, in
which an independent third party or board assists the parties in dispute
resolution through negotiation or by issuance of an evaluation. Any mediation
utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by the public entity and the contractor in writing,
the mediation conducted pursuant to this section shall excuse any further
obligation under Section 20104.4 to mediate after litigation has been
commenced.
This section does not preclude a public entity from requiring arbitration of
disputes under private arbitration or the Public Works Contract Arbitration
Program, if mediation under this section does not resolve the parties’ dispute.
3. Failure by the public entity to respond to a claim from a contractor within the
time periods described in this subdivision or to otherwise meet the time
requirements of this section shall result in the claim being deemed rejected in
its entirety. A claim that is denied by reason of the public entity’s failure to have
responded to a claim, or its failure to otherwise meet the time requirements of
this section, shall not constitute an adverse finding with regard to the merits of
the claim or the responsibility or qualifications of the claimant.
4. Amounts not paid in a timely manner as required by this section shall bear
interest at 7 percent per annum.
5. If a subcontractor or a lower tier subcontractor lacks legal standing to assert a
claim against a public entity because privity of contract does not exist, the
contractor may present to the public entity a claim on behalf of a subcontractor
or lower tier subcontractor. A subcontractor may request in writing, either on
his or her own behalf or on behalf of a lower tier subcontractor, that the
contractor present a claim for work which was performed by the subcontractor
or by a lower tier subcontractor on behalf of the subcontractor. The
subcontractor requesting that the claim be presented to the public entity shall
furnish reasonable documentation to support the claim. Within 45 days of
receipt of this written request, the contractor shall notify the subcontractor in
writing as to whether the contractor presented the claim to the public entity
and, if the original contractor did not present the claim, provide the
subcontractor with a statement of the reasons for not having done so.
Department of Public Works H-46 R-7259
City of Long Beach Division H – General Requirements

The text of this section or a summary of it shall be set forth in the plans or specifications
for any public works project that may give rise to a claim under this section.
A waiver of the rights granted by this section is void and contrary to public policy, provided,
however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in
writing, mediation and proceed directly to the commencement of a civil action or binding
arbitration, as applicable; and (2) a public entity may prescribe reasonable change order,
claim, and dispute resolution procedures and requirements in addition to the provisions
of this section, so long as the contractual provisions do not conflict with or otherwise
impair the timeframes and procedures set forth in this section.
This section applies to contracts entered into on or after January 1, 2017.
Nothing in this section shall impose liability upon a public entity that makes loans or grants
available through a competitive application process, for the failure of an awardee to meet
its contractual obligations.
This section shall remain in effect only until January 1, 2027, and as of that date is
repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes
or extends that date.

Add following sections:

6-12 DAMAGE REPAIR AND RESTORATION
6-12.1 General
Before Contract acceptance, restore damaged work to the same state of completion as
before the damage. Restoration of damaged work includes restoration of erected
falsework and formwork.
The Department does not adjust payment for repair or restoration that the Engineer
determines was caused by your failure to construct the work under the Contract or protect
the work.
6-12.2 Landscape Damage
Repair slopes or other existing facilities that were damaged after starting job site activities
and before starting plant establishment or permanent erosion control establishment.
As ordered, replace plants that have been damaged from either or both of the following
conditions:
1. Ambient air temperature falling below 32 degrees F during the plant establishment
period
2. Department or its supplier restricting or stopping water delivery during the plant
establishment period

This plant replacement work is change order work.


Department of Public Works H-47 R-7259
City of Long Beach Division H – General Requirements

SECTION 7 – RESPONSIBILITIES OF THE CONTRACTOR

7-1 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.

7-1.1 General. Add the following:
The Contractor shall provide and maintain enclosed toilets for the use of its
employees engaged in the Work. These accommodations shall be maintained in a neat
and sanitary condition. They shall also comply with all applicable laws, ordinances, and
regulations pertaining to public health and sanitation of dwellings and camps.
7-1.2 Temporary Utility Services. Add the following:
The Contractor shall make arrangements and pay for telephone and gas during
construction, including necessary service lines to the nearest point of takeoff.
The Contractor shall use potable water for the Work. Water may be obtained from
the Long Beach Water Department by applying for temporary water service at the Water
Department offices at 1800 Wardlow Road, Long Beach. The Long Beach Water
Department will provide a construction meter at the nearest fire hydrant available. The
City will charge for water service at the standard established rates of the Long Beach
Water Department.

Replace section 5-1.36C(2) with:
5-1.36C(2) Nonhighway Facility Protection
The utilities shown in the following table may interfere with the work and must be
exposed or protected in place. Make arrangements with the utility owner (1) to conduct
or witness all exposures or (2) to request temporary deactivation of the utility.
Utilities to Be Exposed and/or Protected in Place During Construction
Utility Location
6-1.03 Water Line, Long Beach Water
District
Between Pier # 10 and Pier #11
1" Lighting Conduit, City Light and Power Channel View Park Along Sidewalk

Utility location activities must be concurrent with construction activities. Contractor is
responsible to identify and locate any existing utilities that may be in conflict prior to
construction and if conflicts exist coordinate with the utility owner to mitigate conflicts.

7-1.3 Scaffolding
General
Section 7-1.02K(6)(e) applies to scaffolding constructed:
1. Over traffic
2. On or suspended from a bridge
3. Within a distance equal to the scaffolding height plus 6 feet from the edge of a
traveled way open to traffic
Department of Public Works H-48 R-7259
City of Long Beach Division H – General Requirements


Section 7-1.02K(6)(e) does not apply to scaffolding at sound walls, retaining walls, and
buildings.
Submit 6 copies of scaffolding shop drawings and 1 copy of scaffolding calculations.
The shop drawings and calculations must be sealed and signed by:
1. Engineer who is registered as a civil engineer
2. Independent checker who is:
2.1. Registered as a civil engineer in the State
2.2. Not employed by the same entity that prepared the drawings or calculations

The shop drawings must include:
1. Descriptions, calculations, and values for loads anticipated during scaffolding
erection, use, and removal.
2. Methods and equipment for erecting, moving, and removing scaffolding.
3. Design details, including bolt layouts, welding details, and connections to existing
structures.
4. Stress sheets showing summary of computed stresses in the scaffolding and in the
connections between the scaffolding and existing structures. The computed stresses
must include the effects of erection, movement, and removal of the scaffolding.
5. If manufactured scaffolding is used, include the manufacturer's:
5.1. Name, address, and telephone number
5.2. Written design load capacities for the scaffolding

Welding must comply with AWS D1.1 for steel and AWS D1.2 for aluminum.

7-1.4 All Projects

Delete the 24th paragraph of section 7-1.04.


7-2 LABOR.

7-2.2 Prevailing Wages. Add the following:
PROJECT LABOR AGREEMENT: This Contract may be covered by a Citywide
Project Labor Agreement (“PLA”) entered into by the City of Long Beach with the Los
Angeles/Orange Counties Building and Construction Trades Council and the signatory
Craft Unions. The PLA contains a local hiring goal of 40%, calculated based on total
hours worked. The local hire provision requires best efforts to utilize qualified workers
residing in first tier zip codes (which include all of the City of Long Beach), then in
second tier zip codes (which reflect the Gateway Cities), and finally in Los Angeles and
Orange Counties. However, if Project work is funded in full or in part by State of
California Tideland funds, then the local hire provision requires best efforts to utilize
qualified workers residing within the Counties of Los Angeles or Orange. In addition,
there is a provision with a goal of 10% to hire Transitional Workers and Veterans.
Department of Public Works H-49 R-7259
City of Long Beach Division H – General Requirements

Contractor shall complete and deliver to City the form (“Letter of Assent”) to comply with
the PLA. Contractor agrees to work with the City and its selected Independent Jobs
Coordinator, if applicable, to promote the local hiring goals and objectives of the PLA.


CALIFORNIA WAGE RATE REQUIREMENTS: Contractor agrees that all public work
(as defined in California Labor Code section 1720) performed pursuant to this Agreement
(the “Public Work”), if any, shall comply with the requirements of California Labor Code
sections 1770 et seq. If there is a difference between the general prevailing wage rates
determined by the director of the Department of Industrial Relations and the applicable
minimum wage rates determined by the Secretary of Labor (for federally assisted
projects) for similar classifications of work, the Contractor and its subcontractors of every
tier shall pay their workers not less than the higher wage rate.

In all bid specifications, contracts and subcontracts for any such Public Work, Developer
shall obtain the general prevailing rate of per diem wages and the general prevailing rate
for holiday and overtime work in this locality for each craft, classification or type of worker
needed to perform the Public Work, and shall include such rates in the bid specifications,
contract or subcontract. Such bid specifications, contract or subcontract must contain the
following provision: “It shall be mandatory for the contractor to pay not less than the said
prevailing rate of wages to all workers employed by the contractor in the execution of this
contract. The awarded contractor expressly agrees to comply with the penalty provisions
of California Labor Code section 1776.

This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part
7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of
the City by and on behalf of the City Council has obtained from the Director of the
Department of Industrial Relations of the State of California the general prevailing rate of
per diem wages, and the general prevailing rate of holiday and overtime work in the
locality in which the public work is to be performed for each craft, classification or type of
workers needed to perform the Work. Copies of prevailing rate of per diem wages are on
file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long
Beach, California 90802, and shall be made available upon request. Copies may also be
obtained on the California Department of Industrial Relations website
http://www.dir.ca.gov/dlsr. This project will be subject the 2026-2 prevailing wage rate, as
determined by the Director of the Department of Industrial Relations for the State of
California. The Contractor to whom the Contract is awarded, and its subcontractors is
directed to pay not less than the general rate of per diem wages for each craft,
classification, or type of worker needed to execute the contract. Contractor is required to
post a copy of the determination of the director of the prevailing rate of per diem wages
at each job site. Contractors are required to pay at least the California minimum wage for
the basic hourly rate in all cases where the published prevailing wage rate is below the
California minimum wage. Any and all employer payments required by the prevailing
wage determinations must also be paid. If the California minimum wage is increased in
the future to an amount above that shown in the prevailing wage determination, the basic
hourly rate in that determination automatically increases to the new minimum wage.
http://www.dir.ca.gov/dlsr
Department of Public Works H-50 R-7259
City of Long Beach Division H – General Requirements


DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is
subject to the following: No contractor or subcontractor may be listed on a bid proposal
for a public works project (submitted on or after March 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section
1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on
a public works project (awarded on or after April 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5. This project
is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Contractors are further cautioned that certified payrolls shall be submitted
electronically directly to the Department of Industrial Relations.

CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the
provisions of Labor Code Section 1776, Contractor shall keep and shall cause each
subcontractor performing any portion of the work under this Contract to keep an accurate
payroll record, showing the name, address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per diem
wages paid to each journeyman, apprentice, worker, or other employee employed by
Contractor or subcontractor in connection with the work. Such payroll records for
Contractor and all subcontractors shall be certified and shall be available for inspection
at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or
City’s authorized Labor Compliance representative in the manner provided herein for
notices shall entitle City to withhold the penalty prescribed by law from progress payments
due to Contractor.

Each contractor and every subcontractor and supplier shall be required to submit certified
payrolls and labor compliance documentation electronically at the discretion of and the
manner specified by the City of Long Beach. Electronic submittal will be a web-based
system, accessed on the World Wide Web by a web browser. Each contractor and
subcontractor will be given a Log On identification and password to access the City of
Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other
requirements or obligations established and imposed by any department of the City with
regard to submission and retention of certified payroll records for Contractor and
subcontractors.

APPRENTICESHIP EMPLOYMENT (CONTRACTS OVER $30,000 ONLY): The
Contractor shall comply with Section 1777.5 of the Labor Code concerning the
employment of apprentices by the Contractor or any subcontractor under the Contractor
and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall
so comply. Contractors employing apprentices or trainees under approved programs shall
maintain written evidence of the registration of apprenticeship programs and certification
of trainee programs, the registration of the apprentices and trainees, and the ratios and
wage rates prescribed in the applicable programs. For federally assisted contracts,
Department of Public Works H-51 R-7259
City of Long Beach Division H – General Requirements

prospective bidders should refer to the Federal Davis Bacon Contract Provisions and
Related Matters (29 CFR § 5.5) in Appendix E.

PENALTIES: Contractor and subcontractors are subject to penalties, including, but not
limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with
Labor Code § 1720 et seq. The Awarded Consultant expressly agrees to comply with the
penalty provisions of California Labor Code section 1776.

SMALL BUSINESS ENTERPRISE (SBE) PROGRAM: Bidders are advised that this
project is subject to the City’s SBE Program. An 10 percent combined SBE/VSBE/LSBE
goal has been assigned to this project. See Divisions C and E of the Specifications.

Replace Section 7-3, “Liability Insurance,” and 7-4,”Workers’ Compensation Insurance,”
with the following combined section.
7-3 LIABILITY AND WORKERS’ COMPENSATION INSURANCE.
The Contractor shall comply with the following requirements and the City of Long Beach
Certificate of Insurance and Endorsements.
The Contractor shall, at its sole cost and expense, procure and maintain for the
duration of the Contract insurance against claims for injuries to persons or damages to
property which may arise from or in connection with the performance of the Work
hereunder by the Contractor, Contractor's agents, representatives, officers, employees,
or subcontractors. Payment for insurance shall be considered as included in the various
items of Work as bid or in the lump sum price bid (as the case may be), and no additional
payment will be made.
7-3.1 Minimum Insurance Requirements.

7-3.1.1 Commercial general liability insurance equivalent in scope to Insurance
Services Office (ISO) form number CG 00 01 11 85 or CG 00 01 11 93 in an amount not
less than $5,000,000 per occurrence and $5,000,000 general aggregate. Such
coverage shall include but shall not be limited to broad form contractual liability, XCU
(explosion, underground, and collapse) perils, products and completed operations
liability, independent contractors liability, and cross liability protection. The City, its
Boards and Commissions, and their officials, employees, and agents shall be named as
additional insureds by endorsement equivalent in scope to ISO form CG 20 10 11 85 or
to both CG 20 10 10 01 and CG 20 37 10 01. There shall be no limitations on the
coverage afforded to the City, its Boards and Commissions, and their officials,
employees, and agents.
7-3.1.2 Commercial automobile liability insurance equivalent in scope to ISO form
CA 00 01 06 92 covering symbol 1, "Any Auto" in an amount not less than $1,000,000
combined single limit. The City, its Boards and Commissions, and their officials,
employees, and agents shall be named as additional insureds by endorsement. There
shall be no limitation of coverage afforded to the City, its Boards and Commissions, and
their officials, employees, and agents.

Department of Public Works H-52 R-7259
City of Long Beach Division H – General Requirements

7-3.1.3 Workers' compensation insurance as required by the California Labor Code
and employer's liability insurance in an amount of not less than $1,000,000 per accident
or occupational illness.

7-3.2 Acceptability of Insurers The insurance required herein must be placed with
carriers as follows:

7-3.2.1 Non-admitted in California and subject to Section 1763 of the Insurance Code
(a current list of eligible surplus lines insurers is maintained by the California
Department of Insurance at http://www.slacal.org/resources/insurer-member-lookup with
a current financial responsibility rating of A (Excellent) or better and a current financial
size category (FSC) of VIII (capital surplus and conditional surplus funds of greater than
$100 million) or greater as reported by A.M. Best company or equivalent, or
7-3.2.2 Admitted (licensed) in the State of California with a current financial
responsibility rating of A (Excellent) or better and a current financial size category (FSC)
of V (capital surplus and conditional surplus funds of greater than $10 million) or greater
as reported by A.M. Best Company or equivalent, or

7-3.2.3 For Worker’s Compensation only, admitted (licensed) in the State of
California.

7-3.3 Verification of Coverage.
The Contractor shall furnish to the City the documentation set forth in paragraph
D below prior to the effective date of the Contract and, at least 30 days prior to expiration
of the insurance required herein, furnish to the City renewal documentation. Each
required document shall be signed by the insurer or a person authorized by the insurer to
bind coverage on its behalf.
The City reserves the right to require complete, certified copies of all insurance
required herein at any time.
The Contractor shall notify the City in writing within five business days if any
insurance required herein is voided by the insurer or cancelled by the insured. This notice
shall be sent by certified mail, return receipt requested, and shall include a certificate of
insurance and the required endorsements for the replacement coverage.

7-3.4 Documentation Required.
The certificates and endorsements shall be on forms provided by the City and shall
be received and approved by the City before Work commences. As an alternative, the
Contractor may submit certified copies of any policy that includes the required
endorsement language set forth in 7-3.4.2, 7-3.4.3, and 7-3.4.4.

7-3.4.1 Certificates of insurance evidencing the required general liability insurance,
Department of Public Works H-53 R-7259
City of Long Beach Division H – General Requirements

automobile liability insurance, and workers' compensation insurance required
hereunder.

7-3.4.2 General liability insurance endorsements.

(a) ADDITIONAL INSURED endorsement equivalent in scope to ISO form CG 20
10 11 85 or to both CG 20 10 10 01 and CG 20 37 10 01 naming the City, its Boards and
Commissions, and their officials, employees, and agents as additional insureds.
(b) CANCELLATION endorsement which provides that the City is entitled to 30
days prior written notice of cancellation or nonrenewal of the policy, or reduction in
coverage, by certified mail, return receipt requested.
(c) CONTRIBUTION NOT REQUIRED endorsement which provides that the
insurance afforded by the general liability policy is primary to any insurance or self-
insurance of the City, its Boards or Commissions, or their officials, employees, or agents
as respects operations of the Named Insured. Any insurance maintained by the City, its
Boards or Commissions, or their officials, employees, or agents shall be in excess of
Contractor's insurance and shall not contribute to it.
(d) SEVERABILITY OF INTEREST endorsement which provides that Contractor's
insurance shall apply separately to each insured against whom a claim is made or suit is
brought, except with respect to the limits of the insurer's liability.
(e) ADDITIONAL INSURED COVERAGE NOT AFFECTED BY INSURED'S
DUTIES AFTER ACCIDENT OR LOSS endorsement. The policy must be endorsed to
provide that any failure to comply with the reporting provisions of the policy shall not affect
coverage to the City, its Boards or Commissions, or their officials, employees, or agents.

7-3.4.3 Automobile liability insurance endorsements.

(a) ADDITIONAL INSURED endorsement naming the City, its Boards and
Commissions, and their officials, employees, and agents as additional insureds with
respect to any auto owned, leased, hired, borrowed or used by the Named Insured, in
connection with this Contract.
(b) CANCELLATION endorsement which provides that the City is entitled to 30
days prior written notice of cancellation or nonrenewal of the policy, or reduction in
coverage, by certified mail, return receipt requested.
(c) CONTRIBUTION NOT REQUIRED endorsement which provides that the
insurance afforded by the general liability policy is primary to any insurance or self-
insurance of the City, its Boards or Commissions, or their officials, employees, or agents
as respects operations of the Named Insured. Any insurance maintained by the City, its
Boards or Commissions, or their officials, employees, or agents shall be in excess of the
Contractor's insurance and shall not contribute to it.
(d) SEVERABILITY OF INTEREST endorsement, which provides that the
Contractor's insurance shall apply separately to each insured against whom a claim is
made or suit is brought, except with respect to the limits of the insurer's liability.
(e) ADDITIONAL INSURED COVERAGE NOT AFFECTED BY INSURED'S
DUTIES AFTER ACCIDENT OR LOSS endorsement. The policy must be endorsed to
provide that any failure to comply with the reporting provisions of the policy shall not affect
Department of Public Works H-54 R-7259
City of Long Beach Division H – General Requirements

coverage to the City, its Boards or Commissions, or their officials, employees, or agents.

7-3.4.4 Workers' compensation and employer's liability insurance endorsements.

(a) CANCELLATION endorsement which provides that the City is entitled to 30
days prior written notice of cancellation or nonrenewal of the policy, or reduction in
coverage, by certified mail, return receipt requested.
(b) WAIVER OF SUBROGATION endorsement which provides that the insurer
will waive its right of subrogation against the City, its Boards and Commissions, and their
officials, employees and agents with respect to any losses paid under the terms of the
workers' compensation and employer's liability insurance policy which arise from work
performed by the Named Insured for the City.

7-3.5 Self-insured programs, self-insured retentions, deductibles.

7-3.5.1 Approval. Any self-insurance program, self-insured retention, or deductible
must be approved separately in writing by the City's Risk Manager or designee and
shall protect the City, its Boards and Commissions, and their officials, employees, and
agents in the same manner and to the same extent as they would have been protected
had the policy or policies not contained such self-insurance, self-insured retention, or
deductible provisions.

7-3.5.2 Legal Defense. The Contractor is expressly obligated to provide for the legal
defense and investigation of any claim against the City as an additional insured and for
all costs and expense incidental to such defense or investigation.

7-3.5.3 Certification. The Contractor shall, upon request, complete the City's self-
insurance questionnaire and required certification by the Contractor's financial officer.

7-3.6 Subcontractors.
The Contractor shall require that all subcontractors meet the requirements of this
Section unless otherwise agreed in writing by the City's Risk Manager or designee.

7-5 PERMITS. Replace this section with the following:
The Contractor shall procure all necessary licenses and permits pay the fees and
costs associated with obtaining them and give all notices necessary and incidental to the
performance of the Work. Comply with PLACs. Maintain a copy of each PLAC at the job
site. Submit copies of Contractor-obtained after-award PLACs.
The Contractor shall not start any phase of the Work requiring a permit until that
permit has been obtained.

Add the following section:
Department of Public Works H-55 R-7259
City of Long Beach Division H – General Requirements

7-5.2 Caltrans Encroachment Permit.
A Caltrans Encroachment Permit is required for the work which is within State right-
of-way along State Route 22. The Contractor shall assist the City in obtaining and
complying with the permit.
The City has submitted the initial permit application, a copy of which is included
herein. The Contractor shall anticipate the possibility of required ramp closures and
implementation of traffic detour routes, as well as restricted work hours, scheduling and
access. If the Contractor wishes to submit different traffic control plans from those
submitted by the City, the Contractor shall have those plans prepared by a licensed Civil
Engineer at its cost.
The City will reimburse the Contractor for direct permit fees upon the Contractor’s
submittal of a receipt for those fees. Payment for all other costs for compliance with
encroachment permit requirements shall be included in the various items of Work, and no
additional payment will be made for those costs.

7-6 THE CONTRACTOR'S REPRESENTATIVE
Add the following:
Before starting work, assign a representative to:
1. Receive the Engineer's orders
2. Prosecute the Engineer's orders
3. Supervise the workers
4. Coordinate the subcontractors' work
5. Coordinate and manage project safety work
The representative must be present at the job site while work is in progress. Submit the
representative's name and telephone number so the representative can be easily
contacted to perform emergency work while work is not in progress.

7-8 WORK SITE MAINTENANCE.
Add the following:
7-8.1 General
Maintain and protect work until the Department has granted relief from maintenance or
accepted the Contract.
Do not remove any padlock used to secure a portion of the work until the Engineer is
present to replace it. Notify the Engineer at least 3 business days before removing the
lock.
Prevent construction equipment that exceeds the maximum weight limits in Veh Code Div
15 from operating on completed or existing treated base, pavement, or structures.
Comply with Caltrans 2024 Standard Specifications Section 13-4," Job Site
Management" of for spill prevention and control, material management, waste
management, nonstormwater management, and dewatering activities.
Comply with Caltrans 2024 Standard Specifications Section 10-5, “Dust Control”.
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Department of Public Works H-56 R-7259
City of Long Beach Division H – General Requirements

The Contractor shall include all cleanup costs in its Bid. The City will make no
additional payment for this work.

7-8.2 Air Pollution Control. Add the following:
Comply with air-pollution-control rules, regulations, ordinances, and statures that apply to
work performed under the Contract, including those provided in Govt Code § 11017 (Pub
Cont Code § 10231).

Do not dispose of material by burning.
7-8.3 Noise Control. Replace this subsection with the following:
Control and monitor noise resulting from work activities.
Do not exceed 86 dBA Lmax at 50 feet from the job site from 9:00 p.m. to 6:00 a.m.
Noise control is subject to the provisions of Long Beach Municipal Code section 8.80,
“Noise.”
7-8.4 Storage of Equipment and Materials. Add this subsection:
Comply with with Caltrans 2024 Standard Specifications Sections 13-4.03C Material
Management and 13-4.03E Nonstormwater Management.
7-8.6 Water Pollution Control.
Replace this subsection with the following:
Comply with Encroachment Permit Special Provisions "Stormwater Special Provisions
for Minimal or no Impact (SWSP)” included in Division F.
Explanation of BMPs described in the Encroachment Permit Special Provisions are
included in Division G of these Specifications. The Contractor shall have at least two
readily accessible copies of these descriptions at the Work site at all times
7-8.6.3 SWPPP. Add the following subsection:
A Storm Water Pollution Prevention Plan (SWPPP) is not required for projects where
land disturbance is less than one acre.

Add the following subsection:
7-8.8 Vermin Control.
At the time of acceptance, structures entirely constructed under the Contract shall
be free of rodents, insects, vermin and pests. The Contractor shall arrange and pay for
necessary extermination work as part of the Work within the Contract time. The
Contractor shall use the services of a licensed exterminator in accordance with the
requirements of the governing authorities. The Contractor shall be liable for injury to
persons or property and responsible for the elimination of offensive odors resulting from
extermination operations.
Payment for vermin control shall be considered as included in the prices for the various
items of Work, and the City will make no additional payment therefor.

https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Department of Public Works H-57 R-7259
City of Long Beach Division H – General Requirements

Add the following subsection:
7-8.9 Graffiti Removal.
Throughout all phases of construction, including suspension of Work, and until final
acceptance of the Work, the Contractor shall keep the Work site free from graffiti, at the
Contractor’s sole cost. If graffiti appears on the Work site, the Contractor shall cover,
repaint, or otherwise remove the graffiti within 24 hours of discovery. If the Contractor
fails to do so, the City may take steps to remove the graffiti and the City's cost in doing
so shall be deducted from the Contract Price.
Payment for graffiti removal shall be considered as included in the prices for the
various items of Work, and the City will make no additional payment therefor.

7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.
Replace with the following subsections:
7-9.1 Property And Facility Preservation
Preserve and protect:
1. Highway improvements and facilities
2. Adjacent property
3. Waterways
4. ESAs
5. Lands administered by other agencies
6. Railroads and railroad equipment
7. Nonhighway facilities, including utilities
8. Survey monuments
9. Department's instrumentation
10. Temporary work
11. Roadside vegetation not to be removed

Comply with Govt Code § 4216 et seq. Notify the Engineer at least 3 business days before
you contact the regional notification center. Failure to contact the notification center
prohibits excavation.
Immediately report damage to the Engineer.
If you cause damage, you are responsible.
The Department may make a temporary repair to restore service to a damaged facility.
Install suitable safeguards to preserve and protect facilities from damage.
Install temporary facilities, such as sheet piling, cribbing, bulkheads, shores, or other
supports, necessary to support existing facilities or to support material carrying the
facilities.
Department of Public Works H-58 R-7259
City of Long Beach Division H – General Requirements

7-9.2 Landscape
If you damage plants not to be removed:
1. Dispose of them unless the Engineer authorizes you to reduce them to chips and
spread the chips within the highway at locations designated by the Engineer
2. Replace them

Replace plants with plants of the same species. Replace trees with 24-inch-box trees.
Replace shrubs with no. 15-container shrubs.
Replace ground cover plants with plants from flats. Replace Carpobrotus ground cover
plants with plants from cuttings. Plant ground cover plants 1 foot on center.
If a plant establishment or permanent erosion control establishment period is specified,
replace plants before the start of the plant establishment or permanent erosion control
establishment period; otherwise, replace plants at least 30 days before Contract
acceptance.
Water each plant immediately after planting. Saturate the backfill soil around and below
the roots or the ball of earth around the roots of each plant. Water as necessary to
maintain plants in a healthy condition until Contract acceptance.
7-9.3 Irrigation Facilities
Keep existing irrigation facilities in place that are described to be removed, relocated, or
modified until the Engineer determines they are no longer needed.
Maintain the existing water supply. If the existing water supply is interrupted for more
than 3 consecutive days, provide an alternative water supply. Water the existing plants
in the area irrigated from that water supply, including those maintained by the
Department, as necessary to maintain healthy plant growth.
If you and the Department irrigate existing plants from the same water supply, furnish
enough water to the Department for watering plantings on and off the highway as
necessary to maintain a healthy condition through Contract acceptance.
If you damage irrigation facilities not to be removed:
1. Remove and dispose of them.
2. Repair and replace damaged facilities within 10 days.
3. Use similar commercial-quality components from the same manufacturer or
components that are compatible with the existing irrigation system if authorized.
4. After completing the repair or replacement of the facilities, perform an operational
test in the presence of the Engineer. If you repair or replace the remote control
valves, conduct the test with the irrigation controller in the automatic mode.

Notify the Engineer:
1. At least 4 business days before shutting off the water supply to any portion of the
existing irrigation system
Department of Public Works H-59 R-7259
City of Long Beach Division H – General Requirements

2. Immediately after restoring the water supply to any portion of the existing
irrigation system

7-10 SAFETY.
7-10.3 Haul Routes. Replace this with the following:
Haul routes shall be determined by the Contractor and approved by the Engineer.
7-10.4 Safety. Add the following:
At Contractor’s sole expense, the Contractor shall take such precautions as are
necessary to protect workers engaged in the performance of the Work and prevent
accidents or injury to workers and others. The Contractor shall comply with all safety
orders of the Division of Industrial Safety of the State of California as well as applicable
Federal regulations insofar as they pertain to the Contractor's operations. If any unusual
or hazardous condition exists by reason of the Work or if any unusual or hazardous
condition arises out of the performance of the Work, or if a condition involving a peculiar
risk of bodily harm to workers or others arises, then the Contractor shall take all
precautions necessary to protect workers and others.
7-10.6 Construction Area Information Sign and Community Outreach.
The Contractor shall furnish and install construction area information signs per the
Standard Plans. The type of work, estimated date of completion, and contact telephone
number shall be attached to each sign by aluminum overlay plates as shown on the
Standard Plans. The Contractor shall post the signs along each street under construction,
one at each end of construction and one at each side street entering each street under
construction. The Contractor shall also post the signs along streets where traffic controls
will impose traffic disruptions or delays or as shown on the Plans. The Contractor shall
post the signs whenever traffic controls will be in place for two weeks or longer.
When traffic controls have been removed, The Contractor shall deliver the signs
to a site specified by the Engineer.
The Contractor shall give one-week advance notice prior to the start of construction
to all residences and businesses facing or siding on the construction area. The notice
shall be in writing on the Contractor's letterhead and shall explain in concise terms the
extent and nature of the Work, the anticipated schedule, and office and emergency
telephone numbers where the Contractor's representative can be reached. The notice
must be reviewed and approved by the City representative before it’s released.
The Contractor shall be responsible for installing one project construction sign. The
graphic will be provided by the City which shows an image of the project and other detail
information. The project image sign size shall be 4 feet in height and 8 feet wide imaged
on white aluminum metal or similar, weather- and graffiti-resistant material. The sign shall
have graffiti resistant coating. The project sign shall be attached to posts where the
bottom of the sign is 7 feet from the ground. The Contractor is responsible to ensure the
project sign does not interfere with operations and must seek City approval for location.

Department of Public Works H-60 R-7259
City of Long Beach Division H – General Requirements

7-10.6.1 Temporary Security/Construction Fence. Add the following to this subsection:
The Contractor shall install temporary Project site security/construction fence(s)
indicated on Drawings or as required for safety and as specified herein. New or used
material may be furnished. Security of Project site and contents is a continuous obligation
of Contractor.
Unless otherwise indicated or specified, security fence shall be constructed of 6-
foot high chain link fencing with a 6-foot high windscreen that is stable through inclement
weather conditions. Space posts not to exceed 10 feet on centers. Posts shall be of
following nominal pipe dimensions: terminal, corner, and gatepost 2 ½-inch, line posts 2-
inch. Chain link fence shall be not less than #13 gauge, 2-inch mesh, and in one width.
Posts, fence, and accessories shall be galvanized and as follows:

a) Shall be set in the earth a depth of 24-inch with soil firmly compacted around post,
unless required otherwise in writing by Construction Manager.
b) Fence fabric shall be attached to posts with #14 gauge tie wire at 16 inches on
center. A #6 gauge steel tension wire with turnbuckles shall be installed at top and
bottom of barricade fencing. Wire tie fabric to tension wires at 18" centers.
c) Windscreen/Graphic Fence Wrap shall be attached to fence fabric and steel
tension wires at 18-inch centers with a minimum of #14 gauge tie wire. Windscreen
shall be maintained and all rips, tears, missing sections shall be corrected upon
notification by the Construction Manager. Refer to section 7-10.6.2 for the “Graphic
Fence Wrap” guidelines.
d) Chain link fencing shall be free from barbs, icicles or other projections resulting
from galvanizing process. Fence having such defects will be replaced even if it has
been installed.
e) Gates shall be fabricated of steel pipe with welded corners, and bracing as
required. Fence and fabric to be attached to frame at 12-inch centers. Provide all
gate hardware of a strength and quality to perform satisfactorily until barricade is
removed upon Substantial Completion of the Work. Each gate shall have a chain
and padlock. Provide two gate keys to the Owner’s Authorized Representative
(OAR). At Substantial Completion of the Work, remove barricade from Project site,
backfill and compact fence footing holes. Existing surface paving that is cut into or
removed shall be patched and sealed to match surrounding areas.
f) At Contractor’s expense and without limitation remove or relocate fencing, fabric
and barricades or other security and protection facilities as rapidly as required in
order to provide for progress of the Work.

7-10.6.2 Graphic Fence Wrap for Temporary Security/Construction Fence

a) Purpose, This guideline outlines requirements for temporary fencing on public
construction projects. To minimize the visual impacts of construction activity, the
standards contained herein are being implemented to ensure that fencing is
aesthetically pleasing and enhances the surrounding environment as well as
provide a level of consistency across the City.
b) Scope, This fencing guideline is applicable to this Project. Prior to the start of any
on-site/offsite construction, the Contractor shall submit a construction plan for
Department of Public Works H-61 R-7259
City of Long Beach Division H – General Requirements

pedestrian protection, construction area perimeter fencing with custom-printed
screen(s), street lane closures, construction staging, shoring excavations, and the
routing of construction vehicles (excavation hauling, concrete, and other deliveries,
etc.). General Contractor shall install FenceScreen.com Custom Printed Flex
Mesh screen(s), Series 411 – 100% blockage, or equivalent, fence screening
along the perimeter of the development site during construction of the on-site
improvements until final inspection by the City. The graphics shall depict positive
images of the City or other artistic concepts. Prior to submitting the graphic design
for printing, the Contractor shall consult with PW to review and approve.
The Contractor shall maintain a temporary chain link fence around the project site
and all construction related staging and other areas at all times throughout the
duration of the construction. The fence shall be a minimum of 6-feet high with a
new, high quality windscreen fabric covered with graphics to screen construction
activities from the public. Contractor to assume 50% of one side of the windscreen
will be printed with color graphics. Graphics to be supplied by the City but the layout
and panel graphic size is entirely the contractor responsibility for coordination of
layout. Gates for the temporary fencing shall be maintained closed and locked at
all times during non-working hours to prevent unauthorized access to the
construction area and to open excavations. The Contractor shall submit details of
the temporary fencing and fabric mesh (assume at least 100% blockage) for review
and approval, including footing or support details demonstrating that the fence has
adequate lateral support for all anticipated loads. At the conclusion of the
construction activities, the windscreen shall be delivered to the City or disposed of
at contractors cost.
c) Requirements:
• 50% of fenced area must contain City images. The remaining 50% must
be a new blue windscreen with no rips, tears, etc.
• Thumbnails of the city images will be given to the contractor. The
contractor is responsible for working with a vendor to layout the
graphics. The graphics must cover the fence from top to bottom. The
graphic images shall not be cut in half, but the graphic images should
be continuous to each panel of fence. The order and sequence of
relevant images will be reviewed by the City for application at this site.
• The total square footage of fenced area shall be calculated by
multiplying the height of the fence by the length of perimeter fencing.
d) Submittals: The following items shall be submitted to PW for review and
approval:
• Plan drawing highlighting the perimeter fencing to be installed.
• Color elevation depicting the images to be installed.
• Breakdown of the total image areas per the categories outlined above
within the “Requirements” section.
• No deviations will be allowed.

All submittal items shall be packaged together and submitted for approval
prior to fabrication and installations.
e) Maintenance and Replacement, All fencing and color graphic screening must
Department of Public Works H-62 R-7259
City of Long Beach Division H – General Requirements

be maintained in good condition. Damaged fencing must be replaced within 48
hours and faded or torn graphics must be replaced in one week at the
Contractor’s cost.

Payment for the construction area information signs and fencing shall be considered as
included in the bid and no additional payment will be made.

7-11 AERIALLY DEPOSITED LEAD

Add the following subsections:



Page 1 of 3

Replace Section 7-1.02K(6)(j)(iii) with:
7-1.02K(6)(j)(iii) public safety Material Containing Lead
Section 7-1.02K(6)(j)(iii) includes specifications for handling, removing, and disposing of
unregulated earth material containing lead. Management of this material exposes
workers to health hazards that must be addressed in your lead compliance plan. This
material contains average lead concentrations below 80 mg/kg total lead and below 5
mg/L soluble lead and is not regulated by DTSC as a hazardous substance or a
hazardous waste. This material does not require disposal at a permitted landfill or solid
waste disposal facility. The RWQCB has jurisdiction over reuse of this material at
locations outside the job site limits.
Manage regulated earth material containing lead under sections 14-11.09.
Unregulated earth material containing lead may be present on the job site at the
following locations:


Unregulated earth material containing lead has been detected within 600 feet of the job
site. East of the Los Cerritos Channel levels of lead found range from 4.32 to 236
mg/kg total lead as analyzed by EPA test method 6010 or EPA test method 7000 series
and based upon a 95 percent upper confidence limit. The excavation location is on
property owned City of Long Beach and is more than 50 feet away from the EB SR-22
edge of shoulder. Levels of lead at the excavation location are expected to be within the
threshold for unregulated earth material containing lead.

Handle the material under all applicable laws, rules, and regulations, including those of
the following agencies:
1. Cal/OSHA
Location Element of work
Sht U-1 Excavation Location
trenching for electrical conduit
installation

Department of Public Works H-63 R-7259
City of Long Beach Division H – General Requirements

2. CA RWQCB, Region 4 Los Angeles


If unregulated material is disposed of:
1. Submit at least 15 days before disposal, the form titled "Agreement between a
Contractor Working on State Facilities and a Real Property Owner for Disposing
Construction-related Material Suitable for Use on Residential Zoned Property" which
discloses the lead concentration of the material to the receiving property owner and
obtains authorization for disposal on the property. Give a copy of the signed form to
the property owner.
2. You are responsible for any additional sampling and analysis required by the
receiving property owner.

If you choose to dispose of unregulated material at a commercial landfill:
1. Transport it to a Class III or Class II landfill appropriately permitted to receive the
material
2. You are responsible for identifying the appropriately permitted landfill to receive the
material and for all associated trucking and disposal costs, including any additional
sampling and analysis required by the receiving landfill

7-13 LAWS TO BE OBSERVED.
Add the following subsections:
7-13.1 General
Comply with laws, regulations, orders, and decrees applicable to the project. Indemnify
and defend the State against any claim or liability arising from the violation of a law,
regulation, order, or decree by you or your employees. Immediately report to the Engineer
a discrepancy or inconsistency between the Contract and a law, regulation, order, or
decree.
If the Department incurs any fines or penalties because of your failure to comply with a
law, regulation, order, or decree, the Department deducts the amount of the fine or
penalty.
Immediately notify the Engineer if a regulatory agency requests access to the job site or
to records. Submit a list of documents provided to the agency and issued enforcement
actions.
7-13.2 US Fair Labor Standards Act
Comply with 29 USC § 201 et seq.
7-13.3 Emissions Reduction
Submit to the Department the following certification before performing the work:
I am aware of the emissions reduction regulations being mandated by the California Air
Resources Board. I will comply with such regulations before commencing the
Department of Public Works H-64 R-7259
City of Long Beach Division H – General Requirements

performance of the work and maintain compliance throughout the duration of this
Contract.

Contract signing constitutes submittal of this certification.
7-13.4 Nondiscrimination
Under 2 CA Code of Regs § 11105:
1. During the performance of this contract, the recipient, contractor, and its
subcontractors shall not deny the contract's benefits to any person on the basis of
race, religious creed, color, national origin, ancestry, physical disability, mental
disability, medical condition, genetic information, marital status, sex, gender, gender
identity, gender expression, age, sexual orientation, or military and veteran status, nor
shall they discriminate unlawfully against any employee or applicant for employment
because of race, religious creed, color, national origin, ancestry, physical disability,
mental disability, medical condition, genetic information, marital status, sex, gender,
gender identity, gender expression, age, sexual orientation, or military and veteran
status. Contractor shall insure that the evaluation and treatment of employees and
applicants for employment are free of such discrimination.
2. Contractor shall comply with the provisions of the Fair Employment and Housing Act
(Gov. Code, § 12900 et seq.), the regulations promulgated thereunder (Cal. Code
Regs., tit. 2, § 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division
3, Title 2 of the Government Code (Gov. Code, §§ 11135-11139.5), and the
regulations or standards adopted by the awarding state agency to implement such
article.
3. Contractor or recipient shall permit access by representatives of the Department of
Fair Employment and Housing and the awarding state agency upon reasonable notice at
any time during the normal business hours, but in no case less than 24 hours' notice, to
such of its books, records, accounts, and
all other sources of information and its facilities as said Department or Agency shall
require to ascertain compliance with this clause.
4. Recipient, contractor and its subcontractors shall give written notice of their obligations
under this clause to labor organizations with which they have a collective bargaining
or other agreement.
5. The contractor shall include the nondiscrimination and compliance provisions of this
clause in all subcontracts to perform work under the contract.

Under 2 CA Code of Regs § 11122:
STANDARD CALIFORNIA NONDISCRIMINATION CONSTRUCTION CONTRACT
SPECIFICATIONS (GOV. CODE SECTION 12990)
These specifications are applicable to all state contractors and subcontractors having a
construction contract or subcontract of $5,000 or more.
1. As used in the specifications:
a. "Act" means the Fair Employment and Housing Act.
b. "Administrator" means Administrator, Office of Compliance Programs,
California Department of Fair Employment and Housing, or any person to whom the
Department of Public Works H-65 R-7259
City of Long Beach Division H – General Requirements

Administrator delegates authority;
2. Whenever the contractor or any subcontractor subcontracts a portion of the work, it
shall include in each subcontract of $5,000 or more the nondiscrimination clause in
this contract directly or through incorporation by reference. Any subcontract for work
involving a construction trade shall also include the Standard California Construction
Contract Specifications, either directly or through incorporation by reference.
3. The contractor shall implement the specific nondiscrimination standards provided in
paragraphs 6(a) through (e) of these specifications.
4. Neither the provisions of any collective bargaining agreement, nor the failure by a
union with whom the contractor has a collective bargaining agreement, to refer
members of any group protected by the Act shall excuse the contractor's obligations
under these specifications, Government Code section 12990, or the regulations
promulgated pursuant thereto.5. In order for the nonworking training hours of
apprentices and trainees to be counted, such apprentices and trainees must be
employed by the contractor during the training period, and the contractor must have
made a commitment to employ the apprentices and trainees at the completion of their
training, subject to the availability of employment opportunities. Trainees must be
trained pursuant to training programs approved by the U.S. Department of Labor or
the California Department of Industrial Relations.
5. In order for the nonworking training hours of apprentices and trainees to be counted,
such apprentices and trainees must be employed by the contractor during the training
period, and the contractor must have made a commitment to employ the apprentices
and trainees at the completion of their training, subject to the availability of
employment opportunities. Trainees must be trained pursuant to training programs
approved by the U.S. Department of Labor or the California Department of Industrial
Relations.
6. The contractor shall take specific actions to implement its nondiscrimination program.
The evaluation of the contractor's compliance with these specifications shall be based
upon its effort to achieve maximum results from its actions. The contractor must be
able to demonstrate fully its efforts under steps a. through e. below:
a. Ensure and maintain a working environment free of harassment, intimidation,
and coercion at all sites, and at all facilities at which the contractor's employees
are assigned to work. The contractor shall specifically ensure that all foremen,
superintendents, and other on-site supervisory personnel are aware of and carry
out the contractor's obligations to maintain such a working environment.
b. Provide written notification within seven days to the director of the DFEH when
the referral process of the union or unions with which the contractor has a
collective bargaining agreement has impeded the contractor's efforts to meet its
obligations.
c. Disseminate the contractor's equal employment opportunity policy by providing
notice of the policy to unions and training, recruitment and outreach programs
and requesting their cooperation in assisting the contractor to meet its
obligations; and by posting the company policy on bulletin boards accessible to
all employees at each location where construction work is performed.
d. Ensure all personnel making management and employment decisions regarding
hiring, assignment, layoff, termination, conditions of work, training, rates of pay
Department of Public Works H-66 R-7259
City of Long Beach Division H – General Requirements

or other employment decisions, including all supervisory personnel,
superintendents, general foremen, on-site foremen, etc., are aware of the
contractor's equal employment opportunity policy and obligations, and discharge
their responsibilities accordingly.
e. Ensure that seniority practices, job classifications, work assignments, and other
personnel practices, do not have a discriminatory effect by continually monitoring
all personnel and employment related activities to ensure that the equal
employment opportunity policy and the contractor's obligations under these
specifications are being carried out.
7. Contractors are encouraged to participate in voluntary associations that assist in
fulfilling their equal employment opportunity obligations. The efforts of a contractor
association, joint contractor-union, contractor-community, or other similar group of
which the contractor is a member and participant, may be asserted as fulfilling any
one or more of its obligations under these specifications provided that the contractor
actively participates in the group, makes every effort to assure that the group has a
positive impact on equal employment opportunity in the industry, ensures that the
concrete benefits of the program are reflected in the contractor's workforce
participation, and can provide access to documentation that demonstrates the
effectiveness of actions taken on behalf of the contractor. The obligation to comply,
however, is the contractor's.
8. The contractor is required to provide equal employment opportunity for all
persons. Consequently, the contractor may be in violation of the Fair
Employment and Housing Act (Government Code section 12990 et seq.) if a
particular group is employed in a substantially disparate manner.
9. The contractor shall not use the nondiscrimination standards to discriminate
against any person because race, religious creed, color, national origin,
ancestry, physical disability, mental disability, medical condition, genetic
information, marital status, sex, gender, gender identity, gender expression,
age, sexual orientation, or military and veteran status.
10. The contractor shall not enter into any subcontract with any person or firm
decertified from state contracts pursuant to Government Code section
12990.
11. The contractor shall carry out such sanctions and penalties for violation of
these specifications and the nondiscrimination clause, including suspension,
termination and cancellation of existing subcontracts as may be imposed or
ordered pursuant to Government Code section 12990 and its implementing
regulations by the awarding agency. Any contractor who fails to carry out
such sanctions and penalties shall be in violation of these specifications and
Government Code section 12990.
12. The contractor shall designate a responsible official to monitor all
employment related activity to ensure that the company equal employment
opportunity policy is being carried out, to submit reports relating to the
provisions hereof as may be required by OCP and to keep records. Records
shall at least include for each employee the name, address, telephone
numbers, construction trade, union affiliation if any, employee identification
number when assigned, status, (e.g., mechanic, apprentice trainee, helper,
Department of Public Works H-67 R-7259
City of Long Beach Division H – General Requirements

or laborer), dates of changes in status, hours worked per week in the
indicated trade, rate of pay, and locations at which the work was performed.
Records shall be maintained in any easily understandable and retrievable
form; however, to the degree that existing records satisfy this requirement,
contractors shall not be required to maintain separate records.

7-13.5 Occupational Safety and Health Standards
7-13.5.1 General
Submit copies of your Injury and Illness Prevention Program, Code of Safe Practices, and
permits required by Cal/OSHA as informational submittals.
You must contact the local public health service department for information concerning
public health conditions within the area of the project.
You are the controlling employer and must ensure hazardous conditions are corrected
(Labor Code § 6400).
The Engineer may notify Cal/OSHA if you fail to establish or maintain a safe and healthful
workplace.
Submit copies of your Injury and Illness Prevention Program, Code of Safe Practices, and
permits required by Cal/OSHA as informational submittals. The program must address
the use of personal and company-issued electronic devices during work. Do not allow the
use of entertainment and personal communication devices in the work zone. Workers
may use a communication device for business purposes in the work area, at a location
where their safety and the safety of other workers and the traveling public is not
compromised.
The Department is not responsible for the health and safety of:
1. Contractor's personnel
2. Subcontractor's personnel
3. Supplier's personnel
4. Any other persons present at the job site at the request of you or your subcontractors.

7-13.5.2 Excavation Safety
Comply with Labor Code § 6705 while excavating. For an excavation 5 feet or more in
depth, submit shop drawings for a protective system.
The drawings must show the design and details for providing worker protection from
caving ground during excavation.
Shop drawings of protective systems for which the Construction Safety Orders require
design by a registered professional engineer must be sealed and signed by an engineer
who is registered as a civil engineer in the State.
Department of Public Works H-68 R-7259
City of Long Beach Division H – General Requirements

The submittal must allow review time and include the contents shown in the following
table except the review time is 65 days for an excavation on or affecting railroad property:
Drawing Review Time and Contents
Topic Plan not requiring a signature Plan requiring a signature
Review time 5 business days before excavating 20 days before excavating
Drawings Drawings
Calculations Calculations
Material information Material information
Contents Proprietary system information Proprietary system information
Soil classification
Soil properties
Soil design calculations
7-13.5.3 Lead Safety
7-13.5.3.1 Lead Compliance Plan
This subsection applies if a bid item for a lead compliance plan is shown on the Bid Item
List.
Regulations containing specific Cal/OSHA requirements when working with lead include
8 CA Code of Regs § 1532.1.
Submit a plan:
1. That documents your compliance program to prevent or minimize worker exposure to
lead
2. Including the items listed in 8 CA Code of Regs § 1532.1(e)(2)(B)
3. Sealed and signed by a CIH with knowledge of and experience complying with 8 CA
Code of Regs

Allow 7 days for review. Obtain authorization for the plan before starting any activity that
presents the potential for lead exposure.
Before starting any activity that presents the potential for lead exposure to employees who
have no prior training, including State employees, provide a safety training program to
these employees that complies with 8 CA Code of Regs § 1532.1 and your lead
compliance plan.
Submit copies of air monitoring or job site inspection reports made by or under the
direction of the CIH under 8 CA Code of Regs § 1532.1 within 10 days after the date of
monitoring or inspection.
Supply personal protective equipment, training, and washing facilities required by your
lead compliance plan for 5 State employees.
Department of Public Works H-69 R-7259
City of Long Beach Division H – General Requirements

7-13.6 Fire Protection
Submit the names and emergency telephone numbers of the nearest fire suppression
agencies before the start of job site activities as an informational submittal. Post the
names and phone numbers at a prominent place at the job site.

Submit a copy of your fire prevention plan required by Cal/OSHA as an informational
submittal before the start of job site activities.

Cooperate with fire prevention authorities in performance of the work.

Immediately report fires occurring within and near the project limits by dialing 911 and to
the nearest fire suppression agency by using the emergency phone numbers retained at
the job site.

Prevent project personnel from setting open fires that are not part of the work.

Prevent the escape of and extinguish fires caused directly or indirectly by job site
activities.
7-13.8 Vehicle Code
Under Veh Code § 591, the Department determines areas within the project limits are
open to public traffic. For those areas, comply with the requirements set forth in
Divisions 11, 12, 13, 14 and 15 of the Veh Code.
Veh Code § 591 does not relieve you or any other person from the duty of exercising due
care.

Add the following section:
7-15 TAXES.
Bidders shall make no mention in the Bid of sales tax, use tax, or any other tax, as
all amounts bid will be deemed to include all taxes.
The Contractor shall pay all sales, consumer, use, and other taxes required to be
paid in accordance with the laws and regulations of the place of the Work that are
applicable during the performance of the Work. The City is not exempt from sales tax.
The Contractor shall cooperate with the City to the full extent possible to maximize
the local allocation of California sales and use tax to the City. Such cooperation shall
include but not be limited to:
(a) Use Tax Direct Payment Permits. The Contractor shall apply for, obtain and
utilize, to the maximum extent reasonable, a California Use Tax Direct Payment Permit.
The application for such permit is available from (and a copy of each quarterly tax return
shall be sent to):

City Controller
City of Long Beach
411 W. Ocean Boulevard, 6th Floor
Department of Public Works H-70 R-7259
City of Long Beach Division H – General Requirements

Long Beach, CA 90802

(b) Purchases of $500,000 or More. The Contractor shall require vendors and
suppliers located outside California from whom the Contractor makes purchase of
$500,000 or more to allocate the use tax to the City.
Additional information regarding use tax and the Permit can be found in the State
of California Board of Equalization, Sales and Use Tax Regulations, Regulation 1699.6,
Use Tax Direct Payment Permits, or on the web site for the Board of Equalization at
http://www.boe.ca.gov/sutax/sutprograms.htm.

Add the following section:
7-16 INDEMNIFICATION.
7-16.1 General.
The Contractor shall indemnify, hold harmless, and protect City, its Boards,
Commissions, and their officials, employees and agents (“Indemnified Parties”) from and
against any and all demands, liability, loss, suit, claim, action, cause of action, damage,
cost, judgment, settlement, decree, arbitration award, stop notice, penalty, loss of
revenue, and expense (including, but not limited to, any fees of accountants, attorneys,
experts or other professionals, and costs of investigation, mediation, arbitration, litigation
and appeal), in law or in equity, of every kind and nature whatsoever, arising out of or in
connection with, resulting from or related to, or claimed to be arising from the Contract or
the Work performed by Contractor, or any of its officers, agents, employees,
subcontractors of any tier, material suppliers, or any person for whose acts any of them
may be liable, regardless of whether such claim, suit or demand is caused, or alleged to
be caused, in part, by an Indemnified Party including, but not limited to, liability arising
from:
a) Bodily or personal injury, emotional injury, sickness or disease, or death to
any persons;
b) Damage to property, including property under the care and custody of City;
c) Civil fines or penalties;
d) Any dangerous, hazardous, unsafe or defective condition of, in or on the
Work site, of any nature whatsoever, which may exist by reason of any act, omission,
neglect, or any use or occupation of the Work site by Contractor, its officers, agents,
employees or subcontractors;
e) Any operation conducted upon or any use or occupation of the Work site by
Contractor, its officers, agents, employees, or subcontractors under or pursuant to the
provisions of the Contract or otherwise;
f) Any act, omission or negligence of Contractor, its officers, agents,
employees, or subcontractors;
g) Infringement of any patent rights, licenses, copyrights or intellectual
property which may be brought against the Contractor or City arising out of Contractor’s
Work, for which the Contractor is responsible;
http://www.boe.ca.gov/sutax/sutprograms.htm
Department of Public Works H-71 R-7259
City of Long Beach Division H – General Requirements

h) Any and all claims against City seeking compensation for labor performed
or materials used or furnished to be used in the Work or alleged to have been furnished,
including all incidental or consequential damages resulting to City from such claims;
i) Failure to comply with any applicable law, statute, code, ordinance,
regulation, permit, or orders, including, without limitation, all applicable federal and state
labor standards, including the prevailing wage provisions of sections 1770 et seq. of the
California Labor Code;
j) Any misrepresentation, misstatement or omission with respect to any
statement made in or any document furnished by the Contractor in connection therewith;
k) Any breach of any duty, obligation, or requirement under the Contract
Documents.
All of the above are collectively hereafter referred to as “Claims” and individually
as a “Claim”.
7-16.2 Defense of Claims, Enforcement and Restrictions.
a) In addition to Contractor’s duty to indemnify, Contractor shall have a
separate and wholly independent duty to defend Indemnified Parties against all Claims.
If any Claim is alleged or brought against Indemnified Parties, Contractor shall defend
Indemnified Parties at Contractor’s expense by legal counsel approved by City and shall
continue this defense until the Claims are resolved, whether by settlement, judgment or
otherwise. No finding or judgment of negligence, fault, breach, or the like on the part of
Contractor shall be required for the duty to defend to arise. City shall notify Contractor of
any Claim, shall tender the defense of the Claim to Contractor, and shall assist Contractor,
as may be reasonably requested, in the defense.
b) Contractor’s obligations under this Section 7-16 shall apply regardless of
whether or not such Claim was caused in part or contributed to by any actual or alleged
negligent act or omissions of an Indemnified Party.
c) If a court of competent jurisdiction determines that a Claim was caused by
the active negligence, sole negligence or willful misconduct of Indemnified Parties,
Contractor’s costs of defense and indemnity shall be (1) reimbursed in full if the court
determines sole negligence by the Indemnified Parties, or (2) reduced by the percentage
of active negligence and/or willful misconduct attributed by the court to the Indemnified
Parties.
d) If this Contract includes work or services performed by a design
professional, such as an architect, landscape architect, professional engineer or
professional land surveyor, subject to California Civil Code Section 2782.8, Contractor
shall defend and indemnify Indemnified Parties against design-related Claims that arise
out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the
Contractor or a subcontractor.
e) Contractor agrees to obtain executed indemnity agreements with provisions
identical to those set forth in this section from each and every subcontractor in
performance of the Contract.
f) Failure of City to monitor compliance with these requirements imposes no
Department of Public Works H-72 R-7259
City of Long Beach Division H – General Requirements

additional obligations on City and will in no way act as a waiver of any rights hereunder.
In the event of any claim, suit or demand made against any Indemnified Parties, the City
may in its sole discretion reserve, retain, or apply any monies due to the Contractor under
the Contract for the purpose of resolving such claims; provided, however, that the City
may release such funds if the Contractor provides the City with reasonable assurance of
protection of the City’s interests. The City shall in its sole discretion determine whether
such assurances are reasonable. Contractor’s obligations under this Section 7-16 extend
to claims occurring after termination of the Contractor’s performance of the Contract or
final payment to the Contractor.
7-16.3 No Limitations.
Contractor’s obligations under this Section 7-16 are in addition to any other rights
or remedies which the Indemnified Parties may have under the law or under the Contract
Documents. Contractor’s indemnification and defense obligations set forth in this Section
7-16: (i) are separate and independent from the insurance provisions set forth above; and
(ii) do not limit, in any way, the applicability, scope, or obligations set forth in the insurance
provisions. In claims, suits, or demands against any Indemnified Party by an employee
of the Contractor, a subcontractor, anyone directly or indirectly, employed by them, or
anyone for whose acts they may be liable, the Contractor’s indemnification and defense
obligations shall not be limited by a limitation on amount or type of damages,
compensation, or benefits payable by or for the Contractor or a subcontractor under
workers’ compensation acts, disability benefit acts, or other employee benefit acts.

Add the following section:
7-17 PUBLIC CONVENIENCE.
Compliance with section 7-1.03 does not relieve you of your responsibility for public
safety.
Construction activities must not inconvenience the public or abutting property owners.
Schedule and conduct work to avoid unnecessary inconvenience to the public and
abutting property owners. Avoid undue delay in construction activities to reduce the
public's exposure to construction.
Where possible, route traffic on new or existing paved surfaces.
Install signs, lights, flares, temporary barrier system, barricades and other facilities to
direct traffic. Provide flaggers whenever necessary to direct the movement of the public
through or around the work. Flagging must comply with section Caltrans 2023 Standard
Specifications Section12-1. When not described and if ordered, providing flaggers is
change order work.
You are required to pay for the cost of replacing or repairing all facilities installed under
change order work for the convenience, direction, or warning of the public that are lost
while in your custody or are damaged by your operations to such an extent as to require
replacement or repair.

Department of Public Works H-73 R-7259
City of Long Beach Division H – General Requirements

Add the following section:
7-18 PUBLIC SAFETY
You are responsible to provide for public safety.
Do not construct a temporary facility that interferes with the safe passage of traffic. Control
dust resulting from the work, inside and outside the right-of-way.
Move workers, equipment, and materials without endangering traffic.
Whenever your activities create a condition hazardous to the public, furnish, erect and
maintain those fences, temporary barrier system, barricades, lights, signs, and other
devices and take any other necessary protective measures to prevent damage or injury
to the public.
Any fences, temporary railing, barricades, lights, signs, or other devices furnished,
erected and maintained by you are in addition to those for which payment is provided
elsewhere in the specifications.
Provide flaggers whenever necessary to ensure that the public is given safe guidance
through the work zone. Flagging must comply with Caltrans 2024 Standard
Specifications Section 12-1. Providing flaggers is included in the bid items of work
involved.
At locations where traffic is being routed through construction under one-way controls,
move your equipment in compliance with the one-way controls unless otherwise ordered.
Use of signs, lights, flags, or other protective devices must comply with the California
MUTCD and any directions of the Engineer. Signs, lights, flags or other protective devices
must not obscure the visibility of, nor conflict in intent, meaning, and function of either
existing signs, lights and traffic control devices, or any construction area signs.
Keep existing traffic signals and highway lighting in operation. Other forces within the
Department will perform routine maintenance of these facilities during the work.
Cover signs that direct traffic to a closed area. Except for work specified in Caltrans 2024
Standard Specifications Section 12, maintaining, and removing the covers on
construction area signs is included in the bid items of work involved.
Install temporary illumination such that the illumination and the illumination equipment do
not interfere with public safety. The installation of general roadway illumination does not
relieve you from furnishing and maintaining any protective devices.
Equipment must enter and leave the highway via existing ramps and crossovers and
must move in the direction of traffic. All movements of workers and construction
equipment on or across lanes open to traffic must be performed in a manner that do not
endanger the public. Your vehicles or other mobile equipment leaving an open traffic
lane to enter the construction area must slow down gradually in advance of the location
of the turnoff to give the traffic following an opportunity to slow down. When leaving a
work area and entering a roadway carrying traffic, your vehicles and equipment must
yield to traffic. Compensation for flaggers, used for all movement of workers and
Department of Public Works H-74 R-7259
City of Long Beach Division H – General Requirements

construction vehicles and equipment on or across lanes open to traffic, is included in the
bid items of work involved.
Immediately remove hauling spillage from a roadway lane or shoulder open to traffic.
When hauling on roadways, trim loads and remove material from shelf areas to minimize
spillage.
Notify the Engineer not less than 25 days and not more than 125 days before the
anticipated start of an activity that will change the vertical or horizontal clearance available
to traffic, including shoulders.
If vertical clearance is temporarily reduced to 15.5 feet or less, place low clearance
warning signs in compliance with the California MUTCD and any directions of the
Engineer. Signs must comply with the dimensions, color, and legend requirements of the
California MUTCD and Caltrans 2023 Standard Specifications Section 12-3.11 except
that the signs must have black letters and numbers on an orange retroreflective
background. W12-2P signs must be illuminated so that the signs are clearly visible.
Pave or provide full width continuous and cleared wood walks for pedestrian openings
through falsework. Protect pedestrians from falling objects and concrete-curing water.
Extend overhead protection for pedestrians at least 4 feet beyond the edge of the bridge
deck. Illuminate all pedestrian openings through falsework. Provide railings, barricades
and barriers between temporary pedestrian walkways and construction activities.
Temporary pedestrian facilities must comply with the California MUTCD, Part 6, Chapter
6D, "Pedestrian and Worker Safety", as well as the current California ADA codes
Do not store vehicles, material, or equipment in a way that:
1. Creates a hazard to the public
2. Obstructs traffic control devices

Do not install or place temporary facilities used to perform the work which interfere with
the free and safe passage of traffic.
Temporary facilities that could be a hazard to public safety if improperly designed must
comply with design requirements described in the Contract for those facilities or, if none
are described, with standard design criteria or codes appropriate for the facility involved.
Submit shop drawings and design calculations for the temporary facilities and show the
standard design criteria or codes used. Shop drawings and supplemental calculations
must be sealed and signed by an engineer who is registered as a civil engineer in the
State.
Contractor shall provide a temporary overhead covering system above the pedestrian
path to protect against falling objects. Protection system should account for a continuous
overhead protective surface supported by an appropriate framing system consisting of a
rigid covering layer capable of shielding pedestrians from falling objects, such as decking
or similar protective surfaces. In addition, contractor to provide supplemental netting or
screening along exposed edges or work zones to contain smaller debris.

Department of Public Works H-75 R-7259
City of Long Beach Division H – General Requirements

Where construction activities occur above active traffic lanes, the Contractor shall ensure
that no falling objects can reach traffic below.

Lane closures, freeway closures may be used to eliminate exposure to overhead hazards.
This is acceptable provided all overhead work with risk of falling objects is performed
while traffic is not present below. No work involving suspended loads or falling object risk
shall occur over open lanes without adequate protection
Where the Contractor proposes to perform work over active traffic lanes and cannot fully
rely on closures, the Contractor shall provide a designed containment/protection system
that prevents falling objects from reaching the roadway. The Contractor shall submit:
• Engineered shop drawings
• Structural design calculations
• Details demonstrating how the system protects traffic below
The protection system should account for a structural support system located beneath
the bridge or work area. This should also include a continuous protective surface or deck
capable of intercepting falling objects, including larger components associated with
installation activities. Protection system to include framing and protective elements
sufficient to protect motorists from both small debris and larger falling items associated
with the work. Contractor to coordinate protection approach with traffic control staging
and clearly identify in submittals when traffic closures will be used and protective systems
are required
If you appear to be neglectful or negligent in furnishing warning devices and taking
protective measures, the Engineer may direct your attention to the existence of a hazard.
You must furnish and install the necessary warning devices. If the Engineer points out the
inadequacy of warning devices and protective measures, that action on the part of the
Engineer does not relieve you from your responsibility for public safety or abrogate your
obligation to furnish and pay for these devices and measures.
Install temporary barrier system or other authorized protective systems under any of the
following conditions:
1. Excavations: Where the near edge of the excavation is within 15 feet from the edge
of an open traffic lane
2. Temporarily unprotected permanent obstacles: When the work includes the
installation of a fixed obstacle together with a protective system, such as a sign
structure together with protective railing, and you elect to install the obstacle before
installing the protective system; or you, for your convenience and as authorized,
remove a portion of an existing protective railing at an obstacle and do not replace
such railing completely the same day
3. Storage areas: When material or equipment is stored within 15 feet of the edge of an
open traffic lane and the storage is not otherwise prohibited by the Contract
4. Height differentials: When construction operations create a height differential greater
than 0.15 feet within 15 feet of the edge of traffic lane
Department of Public Works H-76 R-7259
City of Long Beach Division H – General Requirements


Installation of temporary barrier system is not required if an excavation within 15 feet from
the edge of an open traffic lane is protected by any of the following:
1. Steel plate or concrete covers of adequate thickness to prevent accidental entry by
traffic or the public
2. Side slope where the downhill slope is 4:1 (horizontal:vertical) or less unless a
naturally occurring condition
3. Barrier or railing

Offset the approach end of temporary barrier system a minimum of 15 feet from the edge
of an open traffic lane. Install the temporary barrier system on a skew toward the edge of
the traffic lane of not more than 1 foot transversely to 10 feet longitudinally with respect
to the edge of the traffic lane. If the 15-foot minimum offset cannot be achieved, the
temporary barrier system must be installed on the 10 to 1 skew to obtain the maximum
available offset between the approach end of the railing and the edge of the traffic lane,
and an array of temporary crash cushion modules must be installed at the approach end
of the temporary barrier system.
Secure temporary barrier system in place before starting work for which the temporary
barrier system is required.
If a traffic lane is closed with channelizers for excavation work, move the devices to the
adjacent edge of the traveled way when not excavating. Space the devices as specified
for the closure.
Do not move or temporarily suspend anything over a traffic lane open to the public unless
the public is protected.
The City has prepared a bike detour plan exhibit as a guide for Contractor reference. See
Division F for Temporary Traffic Control Bikeway Route 10 Detour Plan.
Contractor shall prepare a full traffic control plan for pedestrian/bike route closure
including timelines for implementation during the project and for removal and restoration
upon completion of the project. Traffic control plan shall be submitted to the Engineer for
approval prior to start of any project work.

Add the following section:
7-19 RESPONSIBILITY TO OTHER ENTITIES
You are responsible for any liability imposed by law and for injuries to or death of any
person, including workers and the public, or damage to property. Indemnify and save
harmless any county, city or district and its officers and employees connected with the
work, within the limits of which county, city, or district the work is being performed, all in
the same manner and to the same extent specified for the protection of the State.

Department of Public Works H-77 R-7259
City of Long Beach Division H – General Requirements

Add the following section:
7-20 OTHER
You are responsible to the fullest extent allowed by law, to defend and indemnify the State
for any and all injury, illness, disease, or death arising out of or caused by an organism,
including but not limited to animals, microscopic bacteria, fungi, plants and the like, to
which persons, including but not limited to the public, any employees or agents of yours,
the State, or any other contractors that are exposed in connection with the work on the
project.

Add the following section:
7-21 UNSHELTERED INDIVIDUALS ENCAMPMENTS
Notify the Engineer at least 10 days prior to needing access to areas in the right of way
with encampments that affect performance of the work. The Department will remove
encampments including encampment debris.

SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

No Facilities For City Personnel Are Required For This Work.

SECTION 9 – MEASUREMENT AND PAYMENT

9-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK.
9-2.1 Methods of Measurement. Add the following:
The Department determines bid item quantities under US customary units.

9-3 PAYMENT.
9-3.1 General. Add the following:
The quantities stated herein are only estimates. The Contractor shall furnish
whatever quantities are actually needed to complete the Work, whether the quantities are
more or less than the estimates, at the unit prices bid. There is no guarantee that the
total amount bid will be reached, and it may be exceeded.
The City will make payment in the due course of its payments.

All subsequent sections’ costs and costs not specifically listed in itemized bid will be
considered incidental and part of all other work listed here within. Said cost will be at
the sole cost of the contractor and at no additional cost to the City.

9-3.1.1 Payment Scope Add the following:
The Department pays you for furnishing the resources and activities required to complete
the work. The Department's payment is full compensation for furnishing the resources
and activities, including:
Department of Public Works H-78 R-7259
City of Long Beach Division H – General Requirements

1. Risk, loss, damage repair, or cost of whatever character arising from or relating to
the work and performance of the work
2. PLACs and taxes
3. Any royalties and costs arising from patents, trademarks, and copyrights involved in
the work

The Department does not pay for your loss, damage, repair, or extra costs of whatever
character arising from or relating to the work that is a direct or indirect result of your choice
of construction methods, materials, equipment, or labor, unless specifically mandated by
the Contract.
Payment is:

1. Full compensation for all work involved in each bid item shown on the Bid Item List
by the unit of measure shown for that bid item
2. For the price bid for each bid item shown on the Bid Item List or as changed by
change order with a specified price adjustment

Full compensation for work specified in Caltrans Standard Specifications divisions I, II,
and XI is included in the payment for the bid items involved unless:
1. Bid item for the work is shown on the Bid Item List
2. Work is specified as change order work

Work paid for under one bid item is not paid for under any other bid item.
Payment for a bid item includes payment for work in sections referenced by the section
set forth by that bid item.
If an alternative is described in the Contract, the Department pays based on the bid items
for the details and specifications not described as an alternative unless the bid item is
described as an alternative, in which case, the Department pays based on the details and
specifications for that alternative.
Unless an object or activity is specified to be less than the total, the quantity or amount is
all of the object or activity.
All items in a list apply unless the items are specified as choices.

Bid Items and Caltrans 2024 Standard Specifications Applicable Sections
Item code Item description Applicable
section
510501A MINOR CONCRETE (NONSHRINK GROUT) 51
600002A GRAFFITI REMOVAL 60
770300A LIGHTING SYSTEM (CITY) 77
770200A MODIFYING ELECTRICAL SYSTEMS (CITY) 77
780401A COMMUNITY IDENTIFICATION (PANELS) 78
780402A COMMUNITY IDENTIFICATION (LETTERS) 78
780436A PREPARE AND PAINT CONCRETE BRIDGE PIER 78
Department of Public Works H-79 R-7259
City of Long Beach Division H – General Requirements

9-3.2 Partial and Final Payment. Replace the third paragraph with the following:
From each progress payment, 5 percent will be deducted and retained by the City.
The City will withhold up to 5 percent of the total Contract amount until acceptance of the
Work.

Add the following:

The City reserves the right to delay partial and final payments until the Contractor
submits documentation required in these Specifications, including Labor Compliance
documentation (see Subsection 7-2.2) and construction schedule updates (see Section
6-1).
9-3.4 Mobilization. Replace the entire subsection with the following:
Mobilization shall consist of preparatory work and operations for the street
improvement, including, but not limited to, those necessary for the movement of
personnel, equipment, materials, and incidentals to the project site necessary for work
on the project, coordination with utility companies, and for all other work and operations
which must be performed or costs incurred including bonds, riders, insurance and
financing prior to beginning work on the various contract items, and for obtaining all
business licenses and permits as required for entire project, from all related agencies
including, but not limited to, Caltrans, utility companies, and the City. Mobilization shall
also include the time, materials, and labor to move the necessary construction
equipment to and from the job site, supervisory time on the job by the Contractor's
personnel to keep the construction site in a safe condition, installing construction water
supply per agency requirements, posting all OSHA and labor compliance notices and
posters at the job site and all other related work as required at all times and for all non-
working days during construction period. The Contractor is responsible for securing an
adequate storage site for equipment and materials.

Demobilization, including removal of all contractor equipment, field offices, laboratories,
restoration of the area used for the Contractor’s yard and access, removal of temporary
roads, striping, markings, and signage and submittal of record drawings shall be
included in this item.

Add the following:

9-3.4.1 Payment
Payment for Mobilization (Not to Exceed 5% of Total Bid Price) shall include all
related administration for the entire contract period and will be made based on a split
such that 75 percent of the lump sum price bid is considered mobilization and 25
percent is considered demobilization. The lump sum price bid for Mobilization shall not
exceed five(5) percent of the total bid price. Exceedance of the five-percent limitation
may render the bid non-responsive. When Contract Items are altered as provided in the
General Provisions, no additional mobilization or demobilization costs will be allowed.
7-2.2 Prevailing Wages.
7-18 Public Safety

📄 R-7259-Palo-Verde-Ave-Overcrossing-Bridge-Sign-Pre-Bid-Presentation-1.pdf (Parsed Contract Document)

PowerPoint Presentation
PRE-BID MEETING
October 20, 2026
R-7259 – Palo Verde Ave Overcrossing Bridge Sign
(East Signature Gateway Long Beach Signage)
22
AGENDA
• Introductions
• Location & Existing Conditions
• Project Overview & Scope of Work
• Bid Requirements
• Project Requirements
• Labor Compliance
• Project Labor Agreement (PLA)
• Bid Schedule
• Pre-Bid Sign-In
**Please remember to use the mute button whether joining via a computer or phone to avoid disruption
during the meeting.
33
INTRODUCTIONS
• City of Long Beach – Public Works
• Kimvy Nguyen, Project Manager
E-mail: Kimvy.Nguyen@psomas.com
• City of Long Beach – Labor Compliance
• James Vazquez
Email: James.Vazquez@longbeach.gov
• City of Long Beach - Project Labor Agreement/Economic Development
• Nicholle Moore
E-mail: Nicholle.Moore@longbeach.gov
mailto:kimvy.Nguyen@psomas.com
44
Project Location – Bikeway Route 10
North Studebaker/E 7th St– Long Beach – Channel View Park
Location of Construction
55
Project Overview
• Establishes a highly visible gateway into Long
Beach by clearly identifying the City boundary,
creating a stronger first impression for visitors,
while reinforcing City identity and branding.
• Developed in accordance with the Citywide
Wayfinding and Signage Program, which
established design guidelines for gateway and
wayfinding signage through an extensive
community outreach process.
• While the bike path is under City jurisdiction, the
bridge and the freeway/right-of-way it spans fall
under Caltrans jurisdiction. This requires
coordination with Caltrans for installation,
permitting, and long-term maintenance.
• Approved through the Caltrans Community
Identification Program as a designated gateway
location, allowing the City to incorporate
community identification signage at this
prominent entrance into Long Beach.
66
Bikeway Route 10 Palo Verde Ave Pedestrian Bridge
Existing Conditions
77
Scope of Work & Schedule
DESCRIPTION OF WORK:
Fabrication and installation of a gateway
sign signifying the entrance to the City of
Long Beach. The sign will be mounted on
the Bikeway Route 10 Bridge over 7th
Street near Channel View Park. Scope will
include LED lighting to illuminate the
façade of the Long Beach letters.
APPROXIMATE CONSTRUCTION
SCHEDULE:
Start Date: May 2027
End Date: August 2027
ENGINEERING ESTIMATE:
$1,600,000
88
Temporary Traffic Control Bikeway Route 10- Detour Plan
DIVISION F
• Contractor shall prepare a signed and stamped Traffic Control Plan for pedestrian/bicycle
route closures, including implementation and restoration.
• Contractor shall obtain a City Public Works Right-of-Way Permit in accordance with
Municipal Code Chapter 14.14.
• Summer 2027 Construction Window: To minimize impacts to nearby educational and
bicycle facilities, bridge/ROW restrictions and pedestrian detours are limited to Summer
2027, with field construction starting by May 2027 and Final Completion by August 2027.
See Division H, Section 6-7.4.
99
Important Items to Note
• Limited NTP will be issued authorizing the Contractor to proceed with
preparation and submittal of signage shop drawings. For additional details see
Division H, section 6-1.2
• Contractor to prepare and submit one sign letter with 1:1 scale made with final
production materials with exact color, texture, finish and structural makeup as
shown on the drawings. See Division H, section 2-5.3B
• Caltrans Encroachment Permit (Division F) Pending Caltrans Issuance
• General Provisions are provided in Division F
1010
Bid Requirements – Contract Documents
• Required License
A License
• Submission of Bids/Location/Day/Time
Electronic Submittal through City of Long Beach - Long Beach Buys ONLY
Note: Give yourself enough time for bid submittal as the system will close at
10 a.m. November 10, 2026
• Bid Security
10% (see Division A, Bid Security, Page A-2)
• Self-Performance – 20% - Division H
• Contractor Minimum Qualifications – Division C
• Contractor to review all issued addenda and provide signature acknowledgement
as required
1111
Labor Compliance
Prevailing Wage:
• This project is subject to State of California Prevailing Wage regulations (Labor Code §
1720). Please refer to Prevailing Wage Language - Bidding Document
• There is a small business goal of 10%. Please be sure to review the City’s LBSBE program,
the goal must be a combination of SBE/VSBE and LBSBE firms. If you do not meet the goal,
you must submit a completed Good Faith Efforts form (LBSBE Attachment C). See Division
C of specifications for all LBSBE forms.
• Division D: Post Bid Documents - Contract Document contains all Prevailing Detail-
• Combined SBE/VSBE/LSBE goal of 10% has been assigned to the project.
• Division E: LSBE Program bidder instructions & attachments
Other Requirements:
• Contractor & all subs must be registered with DIR
• Apprenticeship requirements (DAS 140 and 142)
• Certified payrolls must be uploaded weekly in LCPtracker
• Assigned Labor Compliance Consultant will monitor the contract and request ancillary
payroll documents on a monthly basis via “Discrepancy Notice”
• Labor Compliance withholds will be held on progress payments when contractors are
noncompliant with requested payroll documents.
1212
PLA – Project Labor Agreement
• Union VS Non-Union Contractors
• Letter of Assent
• Local Hire Goal – 40%
• Transitional/Veteran Worker Hire Goal – 10%
• Apprentices
• Jobs Coordinator
• Pre-Con/Pre-Job Conference
1313
Bid Schedule
• Bid Advertisement Date: September 30, 2026
• Mandatory Pre-Bid Conference: October 20, 2026 at 9:00 A.M.
• Mandatory Job Site walk through: October 20, 2026 at 11:30 A.M.
• Request for Information (RFI) due (14 calendar days prior to Bid Opening): October 27, 2026
• Bid Due Date & Bid Opening electronically through LB Buys: November 10, 2026 by 10:00 A.M.
• Council Award (Approximate): May 2027
1414
Pre-Bid Meeting Sign-in Requirement
IMPORTANT: The contractor attending today’s pre-bid meeting is responsible for registering that
they attended by sending an e-mail to Kimvy Nguyen, Project Manager at
Kimvy.Nguyen@psomas.com by October 21st, 2026 before 12:00pm (Pacific Time).
Include in the e-mail:
• Contractor (Company), Address, City, State, Zip Code and Phone Number
• Company Representative who attended the Teams pre-bid meeting
• Indicate whether Prime or Subcontractor
Failure to send the pre-bid sign-in e-mail will result in your bid being rejected as the pre-bid
conference is mandatory. See Notice Inviting Bids – Division A.
For any questions or request for information (RFI), please send to Kimvy.Nguyen@psomas.com
Note: The City will not respond to a RFI or questions after the deadline period.
mailto:Kimvy.Nguyen@psomas.com
mailto:Kimvy.Nguyen@psomas.com
15
Q&A
HOVAd
ONO]
JO ALID
Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15

📄 R-7259-Palo-Verde-Bridge-Signage-On-Site-Meeting-Sign-In-Sheet-1020.26 1.pdf (Parsed Contract Document)

R-7259 Palo Verde Overcrossing Bridge Sign Pre-Bid Site Walk October 20, 2026 at 11:30 AM
Company Name/Address Company Representative Email Address Phone Number Prime/Sub
Compass Contracting & Consulting
1127 E. Ash Ave.,
Fullerton, CA 92831 Kijoo Sung kijoo@compasscandc.com 714-904-2200 Prime
J&E Construction
8802 Applewood St, Chino CA 91708 Elsa Cornejo Elsa@jeconstructioninc.com 909-784-8151 Prime
Absolute Sign
10655 Humbolt Street, Los Alamitos, CA 90720 Carol Martinez tish@absolutesign.com 562-317-3071 SUB
Moffat & Nichol Nick Velazquez (Design) nvelazquez@moffattnichol.com 562-317-3071 -
Moffat & Nichol Jason Fix (Design) jfix@moffattnichol.com 562-317-3071 -
City of Long Beach
Kimvy Nguyen
Psomas - Consultant Project Manager kimvy.nguyen@psomas.com 714-481-7939 -
City of Long Beach
DJ Kelly
Psomas - Consultant Project Manager david.kelly@psomas.com 571-722-2277 -
City of Long Beach
Natalie Gonzalez
City of Long Beach - Analyst Natalie.Gonzalez@longbeach.gov 562-570-5753 -
mailto:kijoo@compasscandc.com
mailto:Elsa@jeconstructioninc.com
mailto:tish@absolutesign.com
mailto:nvelazquez@moffattnichol.com
mailto:jfix@moffattnichol.com
mailto:kimvy.nguyen@psomas.com
mailto:david.kelly@psomas.com
mailto:Natalie.Gonzalez@longbeach.gov

📄 R-7259-Palo-Verde-Overcrossing-Bridge-Sign-Pre-Bid-PLA-Presentation.pdf (Parsed Contract Document)

PowerPoint Presentation
October 2026
Project Labor
Agreement
Pre-Bid Meeting
22
PROJECT LABOR AGREEMENT
REQUIREMENTS) Requirements
Union vs Non-Union Contractors: Both Union and Non-Union Contractors are eligible to bid and win the award
of Public Works Contracts that are subject to the PLA. Non-Union Contractor Core workforce may still be used
on a 1:1 ratio per craft.
Letter of Assent: By accepting the award of a construction contract for the project as a contractor or
subcontractor, the contractor/employer agrees to sign the Letter of Assent and be bound by each and every
provision of the PLA.
Union Trust Fund Subscription Agreements: Shall be signed by non-union contractors with the appropriate
union trust fund(s) to cooperate for this project without becoming signatory to the union.
PLA Pre-Con/Pre-Job Conference: A PLA Administrator will be assigned to the project after award which will
review the PLA in detail to assist with compliance. Each prime contractor will conduct a pre-job conference
with the unions prior to commencing work.
Certified Payroll Reports: All contractors will use LCPTracker to submit certified payroll reports and other
Labor Compliance and PLA documentation. Proper prevailing wage payments and documentation are required
for invoice payment.
33
PROJECT LABOR AGREEMENT
REQUIREMENTS)CONTINUEDequirements
Fringe Benefit Contributions to be made on behalf of craft workers to union
trust fund(s).
Craft Worker Hiring Procedure requires non-union contractors to follow an
alternating referral procedure between core employees and union referrals:
44
PLA WORKER UTILIZATION GOALS
• 40% of all hours of Project Work shall be performed by Local Residents within zip codes
specified within Attachment B.
• 10% of total hours worked shall be performed by Transitional Workers and/or veterans and
requires completion of a form to determine qualification for each worker.
• Apprentices – There is a 30% Apprentice goal for each craft/workforce
• Contractors must document all good faith efforts made to locate and hire Local Residents
including copies of facsimile transmittals to the Jobs Coordinator.
• Jobs Coordinator – Required for all PLA projects. The Jobs Coordinator will work closely with
staff, the trades and contractors to meet all hiring goals.
• Outreach to Helmets to Hardhats and partnerships with local pre-apprenticeship programs
and union apprenticeship programs.
Nicholle Moore – Project Labor Agreement Administrator
562-570-7158
Nicholle.Moore@longbeach.gov
Thank You!
Sokko Kong – Project Labor Agreement Coordinator
562-570-3728
Sokko.Kong@longbeach.gov
mailto:Nicholle.moore@longbeach.gov
mailto:Sokko.moore@longbeach.gov
Slide 1
Slide 2
Slide 3
Slide 4
Slide 5

📄 R7259-Palo-Verde-Ave-Bridge-Addendum-1.pdf (Parsed Contract Document)

R-7259
Addendum 1





October 9, 2026



ADDENDUM NO. 1

PLANS AND SPECIFICATIONS NO. R-7259
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT
IN THE CITY OF LONG BEACH, CALIFORNIA


NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS

Please note the following changes, clarifications and additions:

1. DRAWINGS

AT-1 – Added note: “Graffiti removal locations, quantities, and dimensions shown are
provided for reference and may vary based on actual field conditions. Contractor shall
field verify the extent of graffiti removal required prior to performing work.

2. SPECIFICATIONS

Division A Notice Inviting Bids

PREBID QUESTIONS AND RFIs: All questions, including requests for interpretation or
correction, or comments regarding the Contract Documents, must be submitted no later
than October 27, 2026 at 5:00 p.m. Questions received after the pre-Bid question
deadline will not be accepted.

















Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383


R-7259
Addendum 1
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383





CONTACT: Before the Bid opening, prospective Bidders shall direct any communications
regarding this Work to:

City of Long Beach, Department of Public Works
Project Management Bureau
5th Floor, City Hall
411 W. Ocean Boulevard
Long Beach, CA 90802
Attention: Kimvy Nguyen / Natalie Gonzalez
E-mail: Kimvy.Nguyen@psomas.com /Natalie.Gonzalez@longbeach.gov



Communications may be written or oral, but the City is not bound by any oral interpretation of
the Contract Documents made by any City employee, nor does the City guarantee the accurate
transcription of oral questions.




PREPARED BY: Kimvy Nguyen



ACKNOWLEDGED BY:
Company Name




Print Name Title


Signature Date
mailto:Kimvy.Nguyen@psomas.com
x
x
x
x
x
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
L
A
S
T

R
E
V
I
S
I
O
N
S
T
A
T
E

O
F

C
A
L
I
F
O
R
N
I
A


-


D
E
P
A
R
T
M
E
N
T

O
F

T
R
A
N
S
P
O
R
T
A
T
I
O
N
No.
Exp.
CIVIL
R
E
G
I
S
T
E
R
E
D
P
ROFESSIONA
L
E
N
G
I
N
E
E
R
S
T
A
TE
OF CALIF
ORN
IA
REGISTERED CIVIL ENGINEER
T
I
M
E

P
L
O
T
T
E
D

=
>
D
A
T
E

P
L
O
T
T
E
D

=
>
3
:
3
7
:
1
3

P
M
7
/
2
8
/
2
0
2
6
C
H
E
C
K
E
D

B
Y
D
E
S
I
G
N
E
D

B
Y
C
A
L
C
U
L
A
T
E
D
-
R
E
V
I
S
E
D

B
Y
D
A
T
E

R
E
V
I
S
E
D
PLANS APPROVAL DATE
DATE
C
O
N
S
U
L
T
A
N
T

F
U
N
C
T
I
O
N
A
L

S
U
P
E
R
V
I
S
O
R
R
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
THE STATE OF CALIFORNIA OR ITS OFFICERS
R
0
0
-
0
0
-
0
0
USERNAME => jawoniyi
DGN FILE => 109300-33A_pg001-clean-East.dgn
RELATIVE BORDER SCALE
IS IN INCHES
0 1 2 3
UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010
1.08/1.08LA7
LONG BEACH, CA 90802
411 WEST OCEAN BOULEVARD
CITY OF LONG BEACH
LONG BEACH, CA 90808
4225 E CONANT STREET
MOFFATT & NICHOL
6322 41
B-4849
1 ISSUE FOR BID-- -- -- 07-20-26 B-4849
1 ISSUE FOR BID-- -- -- 07-20-26
EB Rte 22
ES
LINE
"A"
R/W ES
P5
P2
BAY 11
BRIDGE No. 53-2713
PALO VERDE Ave POC
BAY 1 BAY 15
P5
P2
WB Rte 22
LINE
"B"
ES ES
See NOTE 8 See NOTE 8
N
.

V
E
L
A
Z
Q
U
E
Z
02-26-26
G
.

M
E
D
I
N
A
C69996
09-30-26
GEORGIA A. MEDINA
N
I
C
O
L
A
S

V
E
L
A
Z
Q
U
E
Z
,

P
.
E
.
NOTES:
ARCHITECTURAL TREATMENT
SCALE: AS SHOWN
THIS PLAN TO BE USED FOR ARCHITECTURAL TREATMENT INFORMATION ONLY AT-1
* COLOR MANUFACTURED BY MATTHEWS PAINT, SEE NOTE 3
P2
P5
PANTONE MATCH
JET STREAM
MP07490
PMS 2935C
PMS 2707C
PAINT COLOR
*
LEGEND
#
BLUE FLAG
MP01992
(FT)
HEIGHT WIDTH
(FT) (SF)
AREA
1
2
3
4
5
6
7
8
9
TOTAL
10.0
4.0
4.0
1.0
2.0
3.0
4.0
1.5
11.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
8.0
1.5
15.0
6.0
6.0
1.5
3.0
4.5
6.0
12.0
16.5
70.5
(THIS SHEET ONLY)
(EAST FACE)
GRAFFITI REMOVAL AND PIER PAINTING
(EAST FACE)
#
SCALE: 1" = 6'
ELEVATION
8. PAINT ALL SIDES OF EXISTING PIER WITH TWO COLOR GRADIENT AS SHOWN AND SPECIFIED.
PAINT "PALO VERDE Ave POC BRIDGE No. 53-2713"7.
6. APPLY ANTI-GRAFFITI CLEAR COAT OVER ALL PAINTED SURFACES.
5. TWO COLOR GRADIENT WITH GRADUAL TRANSITION FROM P2 TO P5 AS SHOWN IN REFEREE SAMPLE.
4. CLEAN ALL Exist STRUCTURAL STEEL SURFACES VISIBLE.
3. SUBMIT REPLACEMENT COLORS TO CITY FOR APPROVAL IF OTHER PAINT MANUFACTURER USED.
2. SUBMIT SAMPLES OF COLORS AND MATERIALS TO CITY FOR APPROVAL BEFORE ORDERING MATERIALS.
1. VERIFY ALL CONTROLLING FIELD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL.
PREPARE AND PAINT CONCRETE BRIDGE PIER
GRAFFITI REMOVAL
PIER 9
PIER 8
1
2
3
4 5
6
7
8
9
kimvy.nguyen
Text Box
Graffiti removal locations, quantities, and dimensions shown are provided for reference and may vary based on actual field conditions. Contractor shall field verify the extent of graffiti removal required prior to performing work.
kimvy.nguyen
Text Box
A
kimvy.nguyen
Cloud


Department of Public Works A-1 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DIVISION A
NOTICE INVITING BIDS
FOR
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT

RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the work, until
10:00 am on November 10, 2026 for Palo Verde Avenue Pedestrian Bridge Sign Project
via the City’s online portal https://longbeachbuys.buyspeed.com/ keyword Project R-
7259.

MANDATORY PRE-BID CONFERENCE AND JOB-SITE WALK-THROUGH: The City
will conduct a mandatory pre-bid conference to review bidding processes, Project Labor
Agreement (PLA), at 9:00am on October 20, 2026. Prospective Bidders must attend this
meeting.

The pre-bid conference will be conducted via Microsoft Teams. Prospective Bidders must
attend this meeting. The meeting can be accessed online via the following link or by
phone:

Palo Verde Avenue Pedestrian Overcrossing Bridge R-7259 Pre Bid Virtual Teams
Meeting

Meeting ID: 244 616 748 949 827
Passcode: Dc2gm3DF


Dial in by phone
+1 951-344-4988, 984456970# United States, Riverside
Phone conference ID: 984 456 970#

PREBID QUESTIONS AND RFIs: All questions, including requests for interpretation or
correction, or comments regarding the Contract Documents, must be submitted no later
than October 27, 2026 at 5:00 p.m. Questions received after the pre-Bid question
deadline will not be accepted.

The job-site walk-through will be conducted on site on Tuesday October 20, 2026 at
11:30 a.m. We will be meeting at cul-de-sac at E 5th St near Channel View Park. Job-site
walk-through is mandatory. Prospective Bidders must also attend this meeting.

DESCRIPTION OF WORK: The work to be done consists of fabrication and installation
of a gateway sign signifying the entrance to the City via 7th Street. The sign will be
mounted on the Long Beach Bridge over 7th Street near Channel View Park, and will
include LED lighting to illuminate the façade of the Long Beach letters. Bids are required
for the entire Work.

LONG BEACH SMALL BUSINESS ENTERPRISE (LBSBE) PROGRAM: Bidders are
advised that this project is subject to the City’s Small Business (SBE), Very Small
https://longbeachbuys.buyspeed.com/
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
tel:+19513444988,,984456970


Department of Public Works A-2 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
Business, (VSBE), and Local Small Business (LSBE) Enterprise Program (“LBSBE
Program”) established by City Ordinance no. ORD 11-0010. A 10% combined
SBE/VSBE/LSBE goal has been assigned to this project. See Division C and E of the
Specifications.

PROJECT LABOR AGREEMENT (PLA): This work is covered by a Citywide Project
Labor Agreement (PLA) entered into by the City of Long Beach with the Los
Angeles/Orange Counties Building and Construction Trades Council and the signatory
Craft Unions. The PLA establishes the labor relations Policies and Procedures for the
City, the Contractor and subcontractors awarded contracts for the work and for the craft
persons employed by the Contractor or subcontractor while engaged in the work. See
Division E of the Specifications for the applicable PLA.


CONTRACTOR'S LICENSE: The Contractor shall possess a valid California Class A
Contractor license at the time of bid. The City may deem any Bidder who fails to possess
the required license to be non-responsive at the time of bid opening.

MINIMUM QUALIFICATIONS: Please note that for this work, minimum qualifications
Apply. Information concerning these requirements can be found in Division C of the
specifications. Bidders are required to complete the Bidders Qualifications Form and
submit as part of the Bid Package.

PLANS AND SPECIFICATIONS: Plans and specifications are posted on the City’s
website at the URL http://www.longbeach.gov/finance/business-info/purchasing-division/
on the “Bids/RFPs” tab and available for free download, however, you must be registered
(registration is free and may be accomplished at the same URL) and logged in to view or
download the documents.

BID SECURITY: Bidders must scan and upload with their bid documents, a certified
check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the
United States of America, or a satisfactory bond in an amount not less than 10 percent of
the bid. The original of the above instrument shall be submitted to the City Clerk in a
sealed envelope and must be received and time/date stamped by the City Clerk’s
Office no later than the time and date stated for receipt of bids. The outside of the
envelope shall clearly state “Bid Security for Specification R-7259 PALO VERDE
AVENUE PEDESTRIAN BRIDGE SIGN PROJECT. DO NOT OPEN WITH REGULAR
MAIL.” The City Clerk’s Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach,
CA 90802. The bid security may be submitted through certified mail or in-person. Bidders
may proceed directly to Window 12 without pulling a service ticket.

The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will
execute, and deliver to the City, no later than 15 calendar days after the date shown on
the “Notice of Award,” the following items:

1. The Contract for doing the work, and
http://www.longbeach.gov/finance/business-info/purchasing-division/


Department of Public Works A-3 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
2. A corporate surety bond in favor of the City of Long Beach in an amount not less
than 100 percent of the Contract price for the faithful performance of the Contract,
and
3. A corporate surety bond in an amount not less than 100 percent of the Contract
price for the payment of all labor and material claims, and
4. Evidence of required insurance coverage as written in Division H of the Bid
Specifications.

Failure to submit the items noted above when specified may result in the City, in its sole
discretion, declaring the bid security forfeited and depositing the same into the City
Treasury.

The City will retain the bid security accompanying all bids until it awards the Contract.
The City will retain the bid security submitted with the bid of the Bidder to whom an award
of Contract is made, and the bid security of the next higher bid, until the Contract between
the Bidder to whom award of the Contract is made and the City has been executed.

RETENTION: In the event the contract to be awarded hereunder, including Bid
Specifications and other documents incorporated therein by reference, provides for the
withholding of monies by the City to ensure performance of such contract, the Contractor
may: a) deposit with the City as a substitute for said monies, securities listed in Section
16430 of the California Government Code or bank or savings and loan certificates of
deposit, or both, equivalent to the amount withheld; or, b) request payment of retentions
earned directly to the escrow agent at the expense of the Contractor, provided Contractor
requests, in writing, to make such substitution within five (5) days of the date of the Notice
of Award of the Contract and bears all expenses in connection therewith. Either option
shall be in accordance with Public Contract Code Section 22300.

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor
Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the
State of California, the Director of Public Works of the City by and on behalf of the City
Council has obtained from the Director of the Department of Industrial Relations of the
State of California the general prevailing rate of per diem wages, and the general
prevailing rate of holiday and overtime work in the locality in which the public work is to
be performed for each craft, classification or type of workers needed to perform the work.
Copies of the prevailing rate of per diem wages are on file in the office of the City
Engineer, 5th Floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802.
The Contractor to whom the Contract is awarded, and its subcontractors, shall pay to all
workers in the performance of the work not less than the prevailing rate of wages needed
to execute the contract. Copies of schedules of prevailing wage rates may be obtained
on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr.
This project will be subject to the 2026-1 prevailing wage rate, as determined by the
Director of the Department of Industrial Relations for the State of California. Bidders are
directed to Section 7-2, “Labor,” of the Standard Specifications, and to Division H,
Subsection 7-2.2, “Prevailing Wages,” for requirements concerning payment of prevailing
wages, payroll records, and hours of labor.

http://www.dir.ca.gov/dlsr


Department of Public Works A-4 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is
subject to the following: No contractor or subcontractor may be listed on a bid proposal
for a public works project (submitted on or after March 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section
1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on
a public works project (awarded on or after April 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5. This project
is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Contractors are further cautioned that certified payrolls shall be submitted
electronically directly to the Department of Industrial Relations.

CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the
provisions of Labor Code Section 1776, Contractor shall keep and shall cause each
subcontractor performing any portion of the work under this Contract to keep an accurate
payroll record, showing the name, address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per diem
wages paid to each journeyman, apprentice, worker, or other employee employed by
Contractor or subcontractor in connection with the work. Such payroll records for
Contractor and all subcontractors shall be certified and shall be available for inspection
at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or
City’s authorized Labor Compliance representative in the manner provided herein for
notices shall entitle City to withhold the penalty prescribed by law from progress payments
due to Contractor.

Each contractor and every subcontractor and supplier shall be required to submit certified
payrolls and labor compliance documentation electronically at the discretion of and the
manner specified by the City of Long Beach. Electronic submittal will be a web-based
system, accessed on the World Wide Web by a web browser. Each contractor and
subcontractor will be given a Log On identification and password to access the City of
Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other
requirements or obligations established and imposed by any department of the City with
regard to submission and retention of certified payroll records for Contractor and
subcontractors.

APPRENTICESHIP EMPLOYMENT (CONTRACTS OVER $30,000 ONLY): The
Contractor shall comply with Section 1777.5 of the Labor Code concerning the
employment of apprentices by the Contractor or any subcontractor under the Contractor
and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall
so comply. Contractors employing apprentices or trainees under approved programs shall
maintain written evidence of the registration of apprenticeship programs and certification
of trainee programs, the registration of the apprentices and trainees, and the ratios and
wage rates prescribed in the applicable programs.



Department of Public Works A-5 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
PENALTIES: Contractor and subcontractors are subject to penalties, including, but not
limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with
Labor Code § 1720 et seq. The Awarded Contractor expressly agrees to comply with the
penalty provisions of California Labor Code section 1776.



(SEAL) /s/ MONIQUE DE LA GARZA
CITY CLERK, CITY OF LONG BEACH, CALIFORNIA

_____________ /s/ THOMAS B. MODICA
DATE CITY MANAGER


End of Division A – Notice Inviting Bids

📄 R7259-Palo-Verde-Ave-Bridge-Addendum-3.pdf (Parsed Contract Document)

R-7259
Addendum 3





November 5, 2026



ADDENDUM NO. 3

PLANS AND SPECIFICATIONS NO. R-7259
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT
IN THE CITY OF LONG BEACH, CALIFORNIA


NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS

Please note the following changes, clarifications and additions:

The bid deadline is extended to November 16, 2026, at 10:00 AM, to provide bidders
additional time to obtain subcontractor and trade pricing and prepare complete and
competitive bids.



1. SPECIFICATIONS

DIVISION A NOTICE INVITING BIDS
RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the work, until
10:00 am on November 16, 2026 for Palo Verde Avenue Pedestrian Bridge Sign Project via
the City’s online portal https://longbeachbuys.buyspeed.com/ keyword Project R-7259.

DIVISION C BID FORM
In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be
opened on November 16, 2026 at 10:00 am., we offer to furnish all necessary labor, tools,
materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting Bids,
in full compliance with Plans & Specifications No. R-7259 at the prices listed below.

DIVISION I TECHNICAL REQUIREMENTS

Add to section 78-4.03C(3):
Paint the surfaces such that they gradually transition between the two paint colors specified and closely
resemble the two-color gradient of the referee sample.

Replace items 2 and 3 in the list in the 1st paragraph of section 78-4.06B with:

2. Be compatible with painted concrete surfaces
3. Have a clear satin finish when dry

Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
https://longbeachbuys.buyspeed.com/


R-7259
Addendum 3
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
78-6.01D(2) Mock-ups
Mock-up must be:
1. Full size representing one panel selected by the Engineer.
2. Available for viewing by the Engineer for a period of 5 days at the fabrication site. prior to delivery to project
site.
3. Furnished to the project site and installed at an authorized location on the bridge.
4. Furnished and installed using the personnel, materials, equipment, and methods to be used in the work.
5. Authorized before starting fabrication of final panels.

Notify the Engineer 10 days prior to the start of the viewing period at the fabrication site.
The Engineer may request that additional mock-ups be constructed until the desired results are attained.
The Engineer uses the authorized mock-up to determine the acceptability of the work.
The authorized mock-up may be incorporated into the final work.
78-6.03 CONSTRUCTION
Perform aluminum welding by the inert-gas-shielded arc welding process. Finish exposed aluminum welds to a
neat surface.

Before painting, remove burrs and sharp edges, and chamfer all corners.
Blast clean surfaces to be painted under SSPC-SP 10.

Carefully handle the materials such that no parts are bent, broken, abraded, or otherwise damaged. Do not use
manufacturing, handling, or installation methods that damage or distort the members or damage the painted
surfaces.

Attaching panels by welding to bridge members is not permitted.

Panels must present a uniform appearance in their final position, conforming closely to the horizontal and
vertical lines shown or ordered.

Apply anti-graffiti coating to the panels under section 78-4.06. Anti-graffiti coating for panels must be compatible
with painted surfaces, and have a satin finish when dry.
78-7.01D(2) Mock-ups
Mock-up must be:

1. Full size representing the letters "G" and "B".
2. Include internal lighting components.
3. Available for viewing by the Engineer for a period of 5 days at the fabrication site. prior to delivery to project
site.
4. Furnished to the project site and installed at an authorized location on the bridge.
5. Furnished and installed using the personnel, materials, equipment, and methods to be used in the work.
6. Authorized before starting fabrication of final letters.


Notify the Engineer 10 days prior to the start of the viewing period at the fabrication site.

The Engineer may request that additional mock-ups be constructed until the desired results are attained.

Mock-up letters must be temporarily powered for viewing both at the fabrication site and at the project site.

The Engineer uses the authorized mock-up to determine the acceptability of the work.

The authorized mock-ups may be incorporated into the final work.




R-7259
Addendum 3
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383


2. CLARIFICATION TO BID RFI QUESTION:

QUESTION: Is a specific LED module required for the internally illuminated letters?
Attachment 11 names a Lumenfacade fixture, while the plans state the RGB modules are "to
be determined by fabricator." Ref Attachment 11; plan sheet AT-10.
RESPONSE: For internally illuminated signs, the maximum allowed lighting power shall not
exceed the product of the illuminated sign area and 12 watts per square foot.
Light emitting diodes (LEDs) with a power supply having an efficiency of 80 percent or
greater; or single voltage external power supplies that are designed to convert 120-volt AC
input into lower voltage DC or AC output, and have a nameplate output power less than or
equal to 250 watts, shall comply with the applicable requirements of the appliance efficiency
regulations (Title 20).

































R-7259
Addendum 3
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
CONTACT: Before the Bid opening, prospective Bidders shall direct any communications
regarding this Work to:

City of Long Beach, Department of Public Works
Project Management Bureau
5th Floor, City Hall
411 W. Ocean Boulevard
Long Beach, CA 90802
Attention: Kimvy Nguyen / Natalie Gonzalez
E-mail: Kimvy.Nguyen@psomas.com /Natalie.Gonzalez@longbeach.gov




Communications may be written or oral, but the City is not bound by any oral interpretation of
the Contract Documents made by any City employee, nor does the City guarantee the accurate
transcription of oral questions.




PREPARED BY: Kimvy Nguyen



ACKNOWLEDGED BY:
Company Name




Print Name Title


Signature Date
mailto:Kimvy.Nguyen@psomas.com


Department of Public Works A-1 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DIVISION A
NOTICE INVITING BIDS
FOR
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT

RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the work, until
10:00 am on November 16, 2026 for Palo Verde Avenue Pedestrian Bridge Sign Project
via the City’s online portal https://longbeachbuys.buyspeed.com/ keyword Project R-
7259.

MANDATORY PRE-BID CONFERENCE AND JOB-SITE WALK-THROUGH: The City
will conduct a mandatory pre-bid conference to review bidding processes, Project Labor
Agreement (PLA), at 9:00am on October 20, 2026. Prospective Bidders must attend this
meeting.

The pre-bid conference will be conducted via Microsoft Teams. Prospective Bidders must
attend this meeting. The meeting can be accessed online via the following link or by
phone:

Palo Verde Avenue Pedestrian Overcrossing Bridge R-7259 Pre Bid Virtual Teams
Meeting

Meeting ID: 244 616 748 949 827
Passcode: Dc2gm3DF


Dial in by phone
+1 951-344-4988, 984456970# United States, Riverside
Phone conference ID: 984 456 970#

PREBID QUESTIONS AND RFIs: All questions, including requests for interpretation or
correction, or comments regarding the Contract Documents, must be submitted no later
than October 27, 2026 at 5:00 p.m. Questions received after the pre-Bid question
deadline will not be accepted.

The job-site walk-through will be conducted on site on Tuesday October 20, 2026 at
11:30 a.m. We will be meeting at cul-de-sac at E 5th St near Channel View Park. Job-site
walk-through is mandatory. Prospective Bidders must also attend this meeting.

DESCRIPTION OF WORK: The work to be done consists of fabrication and installation
of a gateway sign signifying the entrance to the City via 7th Street. The sign will be
mounted on the Long Beach Bridge over 7th Street near Channel View Park, and will
include LED lighting to illuminate the façade of the Long Beach letters. Bids are required
for the entire Work.

LONG BEACH SMALL BUSINESS ENTERPRISE (LBSBE) PROGRAM: Bidders are
advised that this project is subject to the City’s Small Business (SBE), Very Small
https://longbeachbuys.buyspeed.com/
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
https://teams.microsoft.com/meet/244616748949827?p=slZ4awMBuEgPhbixXH
tel:+19513444988,,984456970


Department of Public Works A-2 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
Business, (VSBE), and Local Small Business (LSBE) Enterprise Program (“LBSBE
Program”) established by City Ordinance no. ORD 11-0010. A 10% combined
SBE/VSBE/LSBE goal has been assigned to this project. See Division C and E of the
Specifications.

PROJECT LABOR AGREEMENT (PLA): This work is covered by a Citywide Project
Labor Agreement (PLA) entered into by the City of Long Beach with the Los
Angeles/Orange Counties Building and Construction Trades Council and the signatory
Craft Unions. The PLA establishes the labor relations Policies and Procedures for the
City, the Contractor and subcontractors awarded contracts for the work and for the craft
persons employed by the Contractor or subcontractor while engaged in the work. See
Division E of the Specifications for the applicable PLA.


CONTRACTOR'S LICENSE: The Contractor shall possess a valid California Class A
Contractor license at the time of bid. The City may deem any Bidder who fails to possess
the required license to be non-responsive at the time of bid opening.

MINIMUM QUALIFICATIONS: Please note that for this work, minimum qualifications
Apply. Information concerning these requirements can be found in Division C of the
specifications. Bidders are required to complete the Bidders Qualifications Form and
submit as part of the Bid Package.

PLANS AND SPECIFICATIONS: Plans and specifications are posted on the City’s
website at the URL http://www.longbeach.gov/finance/business-info/purchasing-division/
on the “Bids/RFPs” tab and available for free download, however, you must be registered
(registration is free and may be accomplished at the same URL) and logged in to view or
download the documents.

BID SECURITY: Bidders must scan and upload with their bid documents, a certified
check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the
United States of America, or a satisfactory bond in an amount not less than 10 percent of
the bid. The original of the above instrument shall be submitted to the City Clerk in a
sealed envelope and must be received and time/date stamped by the City Clerk’s
Office no later than the time and date stated for receipt of bids. The outside of the
envelope shall clearly state “Bid Security for Specification R-7259 PALO VERDE
AVENUE PEDESTRIAN BRIDGE SIGN PROJECT. DO NOT OPEN WITH REGULAR
MAIL.” The City Clerk’s Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach,
CA 90802. The bid security may be submitted through certified mail or in-person. Bidders
may proceed directly to Window 12 without pulling a service ticket.

The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will
execute, and deliver to the City, no later than 15 calendar days after the date shown on
the “Notice of Award,” the following items:

1. The Contract for doing the work, and
http://www.longbeach.gov/finance/business-info/purchasing-division/


Department of Public Works A-3 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
2. A corporate surety bond in favor of the City of Long Beach in an amount not less
than 100 percent of the Contract price for the faithful performance of the Contract,
and
3. A corporate surety bond in an amount not less than 100 percent of the Contract
price for the payment of all labor and material claims, and
4. Evidence of required insurance coverage as written in Division H of the Bid
Specifications.

Failure to submit the items noted above when specified may result in the City, in its sole
discretion, declaring the bid security forfeited and depositing the same into the City
Treasury.

The City will retain the bid security accompanying all bids until it awards the Contract.
The City will retain the bid security submitted with the bid of the Bidder to whom an award
of Contract is made, and the bid security of the next higher bid, until the Contract between
the Bidder to whom award of the Contract is made and the City has been executed.

RETENTION: In the event the contract to be awarded hereunder, including Bid
Specifications and other documents incorporated therein by reference, provides for the
withholding of monies by the City to ensure performance of such contract, the Contractor
may: a) deposit with the City as a substitute for said monies, securities listed in Section
16430 of the California Government Code or bank or savings and loan certificates of
deposit, or both, equivalent to the amount withheld; or, b) request payment of retentions
earned directly to the escrow agent at the expense of the Contractor, provided Contractor
requests, in writing, to make such substitution within five (5) days of the date of the Notice
of Award of the Contract and bears all expenses in connection therewith. Either option
shall be in accordance with Public Contract Code Section 22300.

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor
Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the
State of California, the Director of Public Works of the City by and on behalf of the City
Council has obtained from the Director of the Department of Industrial Relations of the
State of California the general prevailing rate of per diem wages, and the general
prevailing rate of holiday and overtime work in the locality in which the public work is to
be performed for each craft, classification or type of workers needed to perform the work.
Copies of the prevailing rate of per diem wages are on file in the office of the City
Engineer, 5th Floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802.
The Contractor to whom the Contract is awarded, and its subcontractors, shall pay to all
workers in the performance of the work not less than the prevailing rate of wages needed
to execute the contract. Copies of schedules of prevailing wage rates may be obtained
on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr.
This project will be subject to the 2026-2 prevailing wage rate, as determined by the
Director of the Department of Industrial Relations for the State of California. Bidders are
directed to Section 7-2, “Labor,” of the Standard Specifications, and to Division H,
Subsection 7-2.2, “Prevailing Wages,” for requirements concerning payment of prevailing
wages, payroll records, and hours of labor.

http://www.dir.ca.gov/dlsr


Department of Public Works A-4 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is
subject to the following: No contractor or subcontractor may be listed on a bid proposal
for a public works project (submitted on or after March 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited
exceptions from this requirement for bid purposes only under Labor Code section
1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on
a public works project (awarded on or after April 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5. This project
is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Contractors are further cautioned that certified payrolls shall be submitted
electronically directly to the Department of Industrial Relations.

CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the
provisions of Labor Code Section 1776, Contractor shall keep and shall cause each
subcontractor performing any portion of the work under this Contract to keep an accurate
payroll record, showing the name, address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per diem
wages paid to each journeyman, apprentice, worker, or other employee employed by
Contractor or subcontractor in connection with the work. Such payroll records for
Contractor and all subcontractors shall be certified and shall be available for inspection
at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or
City’s authorized Labor Compliance representative in the manner provided herein for
notices shall entitle City to withhold the penalty prescribed by law from progress payments
due to Contractor.

Each contractor and every subcontractor and supplier shall be required to submit certified
payrolls and labor compliance documentation electronically at the discretion of and the
manner specified by the City of Long Beach. Electronic submittal will be a web-based
system, accessed on the World Wide Web by a web browser. Each contractor and
subcontractor will be given a Log On identification and password to access the City of
Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other
requirements or obligations established and imposed by any department of the City with
regard to submission and retention of certified payroll records for Contractor and
subcontractors.

APPRENTICESHIP EMPLOYMENT (CONTRACTS OVER $30,000 ONLY): The
Contractor shall comply with Section 1777.5 of the Labor Code concerning the
employment of apprentices by the Contractor or any subcontractor under the Contractor
and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall
so comply. Contractors employing apprentices or trainees under approved programs shall
maintain written evidence of the registration of apprenticeship programs and certification
of trainee programs, the registration of the apprentices and trainees, and the ratios and
wage rates prescribed in the applicable programs.



Department of Public Works A-5 Specification R-7259 Addendum 1
City of Long Beach Division A – Notice Inviting Bids
PENALTIES: Contractor and subcontractors are subject to penalties, including, but not
limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with
Labor Code § 1720 et seq. The Awarded Contractor expressly agrees to comply with the
penalty provisions of California Labor Code section 1776.



(SEAL) /s/ MONIQUE DE LA GARZA
CITY CLERK, CITY OF LONG BEACH, CALIFORNIA

_____________ /s/ THOMAS B. MODICA
DATE CITY MANAGER


End of Division A – Notice Inviting Bids
Department of Public Works C-1 R-7259
City of Long Beach Division C – Bid Documents
BIDDER'S NAME: ______________________

BID TO THE CITY OF LONG BEACH
PALO VERDE PEDESTRIAN OVERCROSSING SIGN PROJECT

In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to
be opened on November 16, 2026 at 10:00 am., we offer to furnish all necessary labor, tools,
materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting
Bids, in full compliance with Plans & Specifications No. R-7259 at the prices listed below.

We certify that we have examined the site and that the Bid is complete. By signing the Bid, we
certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

The base bid total shall be used for determining the lowest bidder.

BASE BID –
ITEM
NO.
CALTRANS
ITEM CODE

ITEM DESCRIPTION ESTIMATED
QUANTITY
UNIT
UNIT
PRICE
(IN
FIGURES)
ITEM TOTAL
(IN
FIGURES)
1. 070030 LEAD COMPLIANCE PLAN 1 LS
2. 120090
CONSTRUCTION AREA
SIGNS
1 LS
3. 120100
TRAFFIC CONTROL
SYSTEM
1 LS
4. 120101
TRAFFIC CONTROL
SUPERVISOR
54 DAY
5. 120110 FLASHING ARROW SIGN 4 EA
6. 120116 TYPE II BARRICADE 30 EA
7. 120182 PORTABLE DELINEATOR 263 EA
8. 128651
PORTABLE CHANGEABLE
MESSAGE SIGN (EA)
8 EA
9. 130100 JOB SITE MANAGEMENT 1 LS
10. 141110
WORK AREA MONITORING
(BRIDGE)
1 LS
11. 510501A
MINOR CONCRETE
(NONSHRINK GROUT)
55 CF
12. 550102
STRUCTURAL STEEL
(BRIDGE)
5,300 LB

13. 600002A GRAFFITI REMOVAL 111
SQF
T

14. 750501
MISCELLANEOUS METAL
(BRIDGE)
207 LB

15. 770300A LIGHTING SYSTEM (CITY) 1 LS
Department of Public Works C-2 R-7259
City of Long Beach Division C – Bid Documents
ITEM
NO.
CALTRANS
ITEM CODE

ITEM DESCRIPTION ESTIMATED
QUANTITY
UNIT
UNIT
PRICE
(IN
FIGURES)
ITEM TOTAL
(IN
FIGURES)
16. 770200A
MODIFYING ELECTRICAL
SYSTEM (CITY)
1 LS

17. 780401A
COMMUNITY
IDENTIFICATION (PANELS)
1 LS

18. 780402A
COMMUNITY
IDENTIFICATION
(LETTERS)
1 LS

19. 780436A
PREPARE AND PAINT
CONCRETE BRIDGE PIER
2 EA

20. 780460 ANTI-GRAFFITI COATING 1,200
SQF
T

21. 999990 MOBILIZATION 5% MAX 1 LS

BASE BID TOTAL _______________________________________________



We understand that these quantities are estimates only and are given solely for the
purpose of facilitating the comparison of Bids, and that the Contractor’s compensation will
be computed on the basis of the actual quantities in the completed Work.

DO NOT SUBMIT THIS FORM AS YOUR BID. BIDS ARE TO BE SUBMITTED
ELECTRONICALLY AS DESCRIBED IN DIVISION B.



(Continued on Next Page)

Department of Public Works C-3 R-7259
City of Long Beach Division C – Bid Documents

BIDDER INFORMATION / SIGNATURE



Signature** Legal Name of Company


Print Name / Title


Names of Other General Partners

___________________________________
State of Incorporation Names of Other Partners


___________________________________
State Where Registered as LLC City of Long Beach Business License
Number


Business Address (Actual Address -Not A City of Long Beach Business License
Post Office Box) Expiration Date


Telephone Number / Fax Number Address on City Business License

___________________________________
Email Address of Individual to Contact

___________________________________ ________________________________
Contractor’s License Number DIR Registration Number
bi
**
________ If Bidder is an individual, set forth his/her signature.
________ If Bidder is a joint venture, set forth the name of the joint venture with the
signature of an authorized representative of each venture.
________ If Bidder is a general partnership, set forth the signature of the general partner.
________ If Bidder is a limited partnership, provide names of other partners.
________ If Bidder is a limited liability company, set forth legal name of company with
signature of a member or manager authorized to bind the company
________ If the Bidder is a corporation, set forth the legal name of the corporation with
the signature of an officer of the corporation.


(Continued on Next Page)

Department of Public Works C-4 R-7259
City of Long Beach Division C – Bid Documents
The following information will be used for statistical analysis only.

Is the Bidder a Disadvantaged Business (DBE)?___ If yes, certification No. _________
Is the Bidder a Minority-Owned Business? ______ Which racial minority? ___________
Is the Bidder a Women-Owned Business? _______
Is the Bidder a certified Small Business?_____ If yes, certification No._________

Where did your company first hear about this City of Long Beach Public Works project?




















DIVISION I
TECHNICAL REQUIREMENTS






Department of Public Works I-1 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
STANDARD SPECIFICATIONS
(PART 2)

The following provisions are modifications of the California Department of
Transportation (Caltrans) 2025 Standard Specifications. The use of Caltrans Standards
is required for work within State right of way to ensure compliance with Caltrans
requirements.
Copies of Caltrans 2025 Standard Plans and Specifications are available at
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications




Notes:
1. For Bid Item List See Bid Form in Contract Documents Division C.
2. The term "Department" is the City where referencing contract administration activities
including approvals, acceptance, payment, and submittals. For all other instances,
Department is Department of Transportation as defined in St & Hwy Code § 20 and
authorized in St & Hwy Code § 90; its authorized representatives.




Department of Public Works I-2 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY
IN LOS ANGELES COUNTY
IN LONG BEACH
AT PALO VERDE AVENUE PEDESTRIAN OVERCROSSING
In District 07 On Route 22


Under
Standard Specifications dated 2025
Standard Plans dated 2025
Identified by
City of Long Beach Community ID Gateway Signature Sign
07-LA-22
PM 1.08 / PM 1.08




Department of Public Works I-3 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
City of Long Beach Community ID
Palo Verde Ave POC Gateway Sign
The special provisions contained herein have been prepared by or under
the direction of the following Registered Persons.
GENERAL AND INCIDENTAL CONSTRUCTION


3/10/2026
REGISTERED CIVIL ENGINEER DATE
TEMPORARY TRAFFIC CONTROL
3/10/2026

REGISTERED CIVIL ENGINEER DATE
STRUCTURES
3/10/2026

REGISTERED CIVIL ENGINEER DATE
ELECTRICAL
3/10/2026

REGISTERED ELECTRICAL ENGINEER DATE
09-30-26
C69996
Georgia Medina
06-30-27
C90068
Nicolas Velazquez
06-30-26
C60242
Omar A. Jaradat
3/31/28
6
E19908
KAMRAN K. KERMANI



Department of Public Works I-4 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
DIVISION I
TECHNICAL REQUIREMENTS


STANDARD PLANS LIST .............................................................................................................................5
CANCELED STANDARD PLANS LIST .........................................................................................................6
BID ITEM LIST ...............................................................................................................................................6
ORGANIZATION ...........................................................................................................................................7
DIVISION I GENERAL PROVISIONS ..........................................................................................................7
1 General ......................................................................................................................................................7
2 Bidding .......................................................................................................................................................7
5 Control of Work ..........................................................................................................................................8
7 Legal Relations And Responsibility To The Public ....................................................................................9
DIVISION II GENERAL CONSTRUCTION ............................................................................................... 10
12 Temporary Traffic Control ..................................................................................................................... 10
14 Environmental Stewardship .................................................................................................................. 26
DIVISION III EARTHWORK AND LANDSCAPE ....................................................................................... 29
19 Earthwork .............................................................................................................................................. 29
20 Landscape ............................................................................................................................................ 29
DIVISION VI STRUCTURES ..................................................................................................................... 29
55 Steel Structures .................................................................................................................................... 29
60 Existing Structures ................................................................................................................................ 30
DIVISION VIII MISCELLANEOUS CONSTRUCTION............................................................................... 31
75 Miscellaneous Metal ............................................................................................................................. 31
77 Local Infrastructure ............................................................................................................................... 32
78 Incidental Construction ......................................................................................................................... 37
DIVISION XI MATERIALS ......................................................................................................................... 41
91 Paint ...................................................................................................................................................... 41








CITY OF LONG BEACH COMMUNITY ID: PALO VERDE AVE POC GATEWAY SIGN


Department of Public Works I-5 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

0BSTANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. When
applicable, revised standard plans (RSPs) listed below are included in the project
plans.
ABBREVIATIONS, LINES, SYMBOLS, AND LEGEND
2BA3A 3BAbbreviations (Sheet 1 of 3)
4BA3B 5BAbbreviations (Sheet 2 of 3)
6BA3C 7BAbbreviations (Sheet 3 of 3)
8BA10A 9BLegend - Lines and Symbols (Sheet 1 of 5)
10BA10B 11BLegend - Lines and Symbols (Sheet 2 of 5)
12BA10C 13BLegend - Lines and Symbols (Sheet 3 of 5)
14BA10D 15BLegend - Lines and Symbols (Sheet 4 of 5)
16BA10E 17BLegend - Lines and Symbols (Sheet 5 of 5)
TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN
616BT1A 617BTemporary Crash Cushion - Sand Filled (Unidirectional)
618BT1A1 619BTemporary Crash Cushion - Sand Filled (Unidirectional)
620BT1B 621BTemporary Crash Cushion - Sand Filled (Bidirectional)
622BT2 623BTemporary Crash Cushion - Sand Filled (Shoulder Installations)
624BT3A 625BTemporary Railing (Type K)
626BT3B 627BTemporary Railing (Type K)
628BT3C 629BTemporary Barrier System (Cross Bolt)
630BT3D 631BTemporary Barrier System (Cross Bolt)
632BT3E 633BTemporary Barrier System (Cross Bolt)
634BT3F 635BTemporary Barrier System (Cal F-23)
636BT3F2 637BTemporary Barrier System (Cal F-23)
638BT3G 639BTemporary Barrier System (Staking or Anchoring)
640BT3G2 641BTemporary Barrier System (Staking or Anchoring)
TEMPORARY TRAFFIC CONTROL SYSTEMS
650BT9 651BTraffic Control System Tables for Lane and Ramp Closures
652BT10 653BTraffic Control System for Lane Closure on Freeways and Expressways
656BT11 657BTraffic Control System for Lane Closure on Multilane Conventional Highways
658BT11A 659BTraffic Control System for Changeable Lane Closure on Multilane Conventional
Highways and Expressways
668BT14 669BTraffic Control System for Ramp Closure
678BT19 679BTraffic Control System - Construction Work Zone Speed Limit Reduction on
Conventional Highways
ROADSIDE SIGNS
924BRS1 925BRoadside Signs - Typical Installation Details No. 1
926BRS2 927BRoadside Signs - Wood Post - Typical Installation Details No. 2
930BRS4 931BRoadside Signs - Typical Installation Details No. 4
ELECTRICAL SYSTEMS - LEGEND AND ABBREVIATIONS
1058BES-1A 1059BElectrical Systems (Legend)
1060BES-1B 1061BElectrical Systems (Legend)
1062BES-1C 1063BElectrical Systems (Legend)
ELECTRICAL SYSTEMS - PULL BOX
1162BES-8A 1163BElectrical Systems (Non-Traffic Pull Box)



Department of Public Works I-6 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

1BCANCELED STANDARD PLANS LIST
The standard plan sheets listed below are canceled and not applicable to this contract.
Plan No.
Date
Canceled
Plan No.
Date
Canceled
Plan No.
Date
Canceled
No Canceled Standard Plans



BID ITEM LIST

See Bid Form in Division C of Contract Documents





Department of Public Works I-7 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard
Specifications. A main-section heading is a heading shown in the table of contents of the Standard
Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the
Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the
Standard Specifications for any other reference to a paragraph of the Standard Specifications.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION I GENERAL PROVISIONS
1 GENERAL
The Caltrans Standard Special Provision (SSP) below is incorporated in the Contract Section noted.
Caltrans SSP Description Contract Section
1-1.01 Bid Items and Applicable Sections Division H, Section 1-1


Add to section 1-1.01:


Bid Items and Applicable Sections
Item
code
Item description Applicable
section
510501A MINOR CONCRETE (NONSHRINK GROUT) 51
600002A GRAFFITI REMOVAL 60
770300A LIGHTING SYSTEM (CITY) 77
770200A MODIFYING ELECTRICAL SYSTEMS (CITY) 77
780401A COMMUNITY IDENTIFICATION (PANELS) 78
780402A COMMUNITY IDENTIFICATION (LETTERS) 78
780436A PREPARE AND PAINT CONCRETE BRIDGE PIER 78


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

2 BIDDING
The Caltrans Standard Special Provision (SSP) below is incorporated in the Contract Section noted.
Caltrans SSP Description Contract Section
2-1.06B Supplemental Project Information Division F


Add between the 1st and 2nd paragraphs of section 2-1.06B:
The City makes the following supplemental project information available:




Department of Public Works I-8 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Supplemental Project Information
Means Description
Included in the Information Handout 1. Right of Way Maps
2a. 1981 As-built Drawings (7th St Pedestrian Bridge)
2b. 1995 As-built Drawings (Earthquake Retrofit)
3. Signature Gateway East Concept
4a. Lighting Fixture Specification Sheet
4b. Lighting Fixture Wiring Specification Sheet
5a. Pharos DMX Controller Specification Sheet
5b. Pharos DMX Controller O&M
6. Cradlepoint IBR900 Series Router Specification Sheet
7. Matthews Primer Product Information
8. Matthews Paint Product Information
9. Matthews Clear Product Information
10. Caltrans Encroachment Permit Issued to City
11. Caltrans Encroachment Permit Special Provisions
Available for inspection at:
411 W. Ocean Blvd.
Long Beach, CA 90802
Telephone no.: (562)570-5000
Referee Paint Samples

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

5 CONTROL OF WORK
The Caltrans Standard Special Provision (SSP) below is incorporated in the Contract Section noted.
Caltrans SSP Description Contract Section
5-1.326C(2) Nonhighway Facility Protection Division H, Section 1-1


Replace section 5-1.36C(2) with:
5-1.36C(2) Nonhighway Facility Protection
The utilities shown in the following table may interfere with the work and must be exposed or protected in
place. Make arrangements with the utility owner (1) to conduct or witness all exposures or (2) to request
temporary deactivation of the utility.
Utilities to Be Exposed and/or Protected in Place During Construction
Utility Location
30" Water Line, Long Beach Water District Between Pier # 10 and Pier #11
1" Lighting Conduit, City Light and Power Channel View Park Along Sidewalk

Utility location activities must be concurrent with construction activities. Contractor is responsible to
identify and locate any existing utilities that may be in conflict prior to construction and if conflicts exist
coordinate with the utility owner to mitigate conflicts.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^




Department of Public Works I-9 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
The Caltrans Standard Special Provisions (SSPs) below are incorporated in the Contract Section noted.

Caltrans SSP Description Contract Section
7-1.02K(6)(e) Scaffolding Division H, Section 1-1
7-1.02K(6)(j)(iii) Unregulated Earth Material Containing Lead Division H, Section 1-1


Replace section 7-1.02K(6)(e) with:
7-1.02K(6)(e) Scaffolding
7-1.02K(6)(e)(i) General
Section 7-1.02K(6)(e) applies to scaffolding constructed:
1. Over traffic
2. On or suspended from a bridge
3. Within a distance equal to the scaffolding height plus 6 feet from the edge of a traveled way open to
traffic

Section 7-1.02K(6)(e) does not apply to scaffolding at sound walls, retaining walls, and buildings.
Submit 6 copies of scaffolding shop drawings and 1 copy of scaffolding calculations.
The shop drawings and calculations must be sealed and signed by:
1. Engineer who is registered as a civil engineer
2. Independent checker who is:
2.1. Registered as a civil engineer in the State
2.2. Not employed by the same entity that prepared the drawings or calculations

The shop drawings must include:
1. Descriptions, calculations, and values for loads anticipated during scaffolding erection, use, and
removal.
2. Methods and equipment for erecting, moving, and removing scaffolding.
3. Design details, including bolt layouts, welding details, and connections to existing structures.
4. Stress sheets showing summary of computed stresses in the scaffolding and in the connections
between the scaffolding and existing structures. The computed stresses must include the effects of
erection, movement, and removal of the scaffolding.
5. If manufactured scaffolding is used, include the manufacturer's:
5.1. Name, address, and telephone number
5.2. Written design load capacities for the scaffolding

Welding must comply with AWS D1.1 for steel and AWS D1.2 for aluminum.


Replace Section 7-1.02K(6)(j)(iii) with:
7-1.02K(6)(j)(iii) Unregulated Earth Material Containing Lead
Section 7-1.02K(6)(j)(iii) includes specifications for handling, removing, and disposing of unregulated
earth material containing lead. Management of this material exposes workers to health hazards that must
be addressed in your lead compliance plan. This material contains average lead concentrations below 80
mg/kg total lead and below 5 mg/L soluble lead and is not regulated by DTSC as a hazardous substance
or a hazardous waste. This material does not require disposal at a permitted landfill or solid waste
disposal facility. The RWQCB has jurisdiction over reuse of this material at locations outside the job site



Department of Public Works I-10 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
limits.
Manage regulated earth material containing lead under sections 14-11.09.
Unregulated earth material containing lead may be present on the job site at the following locations:
Location Element of work
Sheet U-1 Excavation Location trenching for electrical conduit installation

Unregulated earth material containing lead has been detectedwithin 600 feet of the job site. East of the
Los Cerritos Channel levels of lead found range from 4.32 to 236 mg/kg total lead as analyzed by EPA
test method 6010 or EPA test method 7000 series and based upon a 95 percent upper confidence limit.
The excavation location is on property owned City of Long Beach and is more than 50 feet away from the
EB SR-22 edge of shoulder. Levels of lead at the excavation location are expected to be within the
threshold for unregulated earth material containing lead.
Handle the material under all applicable laws, rules, and regulations, including those of the following
agencies:
1. Cal/OSHA
2. CA RWQCB, Region 4 Los Angeles


If unregulated material is disposed of:
1. Submit at least 15 days before disposal, the form titled "Agreement between a Contractor Working on
State Facilities and a Real Property Owner for Disposing Construction-related Material Suitable for
Use on Residential Zoned Property" which discloses the lead concentration of the material to the
receiving property owner and obtains authorization for disposal on the property. Give a copy of the
signed form to the property owner.
2. You are responsible for any additional sampling and analysis required by the receiving property
owner.

If you choose to dispose of unregulated material at a commercial landfill:
1. Transport it to a Class III or Class II landfill appropriately permitted to receive the material
2. You are responsible for identifying the appropriately permitted landfill to receive the material and for
all associated trucking and disposal costs, including any additional sampling and analysis required by
the receiving landfill


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION II GENERAL CONSTRUCTION
12 TEMPORARY TRAFFIC CONTROL


Add to the beginning of section 12-3.32C:
Place PCMSs at the locations shown and in advance of the 1st warning sign for each:
1. Stationary lane closure.

When WB Route 22 is reduced to a single lane:




Department of Public Works I-11 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Place PCMS on NB Route 405 on the right shoulder, 0.75 mile south of Seal Beach off-ramp with
the message: "1 LANE / ONLY ON / WB 22 - EXPECT / DELAYS".

Place a 2nd PCMS on SB Route 605 on the right shoulder south of Willow St on-ramp with the
message: "1 LANE / ONLY ON / WB 22 - EXPECT / DELAYS".

Place a 3rd PCMS on SB Route 405 on the right shoulder south of Los Coyotes Diagonal UC with
the message: "1 LANE / ONLY ON / WB 22 - EXPECT / DELAYS".


When EB Route 22 is reduced to a single lane:

Place 2 PCMS on EB 7th St on the striped median island at 850 feet west of Ximeno Ave and 500
feet west of Santiago Ave with the message: "SINGLE / LANE / ONLY - AT / STUD- / BAKER -
EXPECT / DELAYS".

Place a 3rd PCMS on SB Route 1 (PCH) on the striped median island at 500 feet north of
Santiago Ave with the message: "SINGLE / LANE / ONLY - ON / EB 7TH / STREET - EXPECT /
DELAYS".

Place a 4th PCMS on SB Bellflower Blvd on the striped median island at 450 feet north of E State
University Dr with the message: "SINGLE / LANE / ONLY - ON / EB 7TH / STREET - EXPECT /
DELAYS".

Place a 5th PCMS on NB Route 1 (PCH) on the striped median island at 1,000 feet south of
Channel Dr with the message: "SINGLE / LANE / ONLY - ON / EB 7TH / STREET - EXPECT /
DELAYS".

2. WB Route 22 On-ramp from Studebaker. Detour traffic and place PCMS as shown on Motorist
Information Sheet MI-1.

3. EB Route 22 full closure.
Detour traffic and place PCMS as shown on Motorist Information Sheet MI-2.


Add between the 9th and 10th paragraphs of section 12-3.32C:
Start displaying the message on the sign 5 minutes before closing the lane or shoulder or when directed
by the Engineer.


Add to section 12-4.02A(2):
special days: Martin Luther King Jr Day and Columbus Day


Add between the 1st and 2nd paragraphs of section 12-4.02A(3)(c):
Submit a contingency plan for each of the following activities:
1. Activity requiring a full roadway closure


Add to the end of the 1st paragraph of section 12-4.02C(1):
except for work shown on the stage construction and traffic handling plans




Department of Public Works I-12 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

Add between the 3rd and 4th paragraphs of section 12-4.02C(1):
Except as otherwise shown on chart no. J1, you may close a ramp if the adjacent lane is allowed to be
closed as shown on chart no. K1 and K2. If a ramp is closed and a ramp lane requirement chart is not
included, detour traffic to the next available ramp downstream of the closed ramp in the direction of travel.


Add to the end of section 12-4.02C(1):
Keep the full width of the ramp traveled way open for use by traffic on designated holidays and special
day.
For each 10-minute interval or fraction thereof past the time specified to open the closure, the amount for
liquidated damages per interval shown in the table below is deducted. Liquidated damages are limited to
5 percent of the total bid per occurrence. Liquidated damages are not assessed if the Engineer orders the
closure to remain in place beyond the scheduled pickup time.
Type of facility Route Direction or segment Period
Liquidated
damages/interval
Mainline 22 WESTBOUND
1st half hour
2nd half hour
2nd hour and beyond
$1,000/10 minutes
$1,000/10 minutes
$1,000/10 minutes
Mainline 22 EASTBOUND
1st half hour
2nd half hour
2nd hour and beyond
$1,000/10 minutes
$1,000/10 minutes
$1,000/10 minutes


Add to the end of section 12-4.02C(3)(a):
If work vehicles or equipment is parked on the shoulder within 6 feet of a traffic lane of a freeway or
expressway, close the shoulder area as shown.
Personal vehicles of your employees must not be parked within the highway.


Replace section 12-4.02C(3)(b) with:
12-4.02C(3)(b) Complete Freeway or Expressway Closure Requirements
You may close Route EB Route 22 between Pepper Tree Lane and Studebaker Rd On-Ramp as shown
on chart no L1.
A complete freeway or expressway closure is allowed for the following activities:
1. Cleaning of existing structure over EB Route 22
2. Spot blast cleaning locations over EB Route 22
3. Erection of Community ID Panels over EB Route 22
4. Installation of Panel Lighting over EB Route 22



Replace section 12-4.02C(3)(d) with:
12-4.02C(3)(d) City Street Closure Requirements
Place 1 PCMS at least before the date of the first planned lane closure in the maintenance vehicle pullout
area on EB Route 22 (7th Street) east of Silvera Ave and a 2nd PCMS in the right shoulder of WB Route
22 just east of San Gabriel River Bridge. PCMS must remain until completion of work at each location of
construction.



Department of Public Works I-13 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Display the following message:
"ROAD / WORK – MM-DD / TO / MM-DD – EXPECT / DELAYS"
Note:
"/" separates each line of text on the PCMS display.
"–" denotes where the PCMS display flashes the next line of text.


Replace section 12-4.02C(3)(e) with:
12-4.02C(3)(e) Closure Restrictions for Special Events and Venues
Do not work from 1800 on Halloween to 0600 the following day.
No work or highway closures are allowed along the Games Route Network from June 1, 2028 to
September 1, 2028. Plan all work shown on the stage construction and traffic handling plans to comply
with this requirement. The Games Route Network is shown in the following table:
Olympic and Paralympic Games Route Network
Affected routes Route limits
2 Route 101 to Route 134
10 Route 405 to Route 110
10 Route 101 to Fairplex Dr
47 Route 110 to Harbor Blvd
57 Routes 10/57/71 interchange to Via Verde
91 Vermont Ave to Orange County Line
101 Route 10 to Alvarado St
101 Route 134 to Hayvenhurst Ave
105 Route 405 to Route 110
110 Route 47 to Stadium Way
134 Route 101 to Route 210
164 Route 60 to Route 10
210 Mountain St to Baldwin Ave
405 Orange County Line to Victory Blvd

No work or highway closures within the traveled way are allowed along non-Games Route Network routes
from July 11, 2028 to July 31, 2028 and from August 14, 2028 to August 28, 2028. Plan all work shown
on the stage construction and traffic handling plans to comply with this requirement. Work outside of the
traveled way may be allowed if authorized by the Engineer.
From 3 hours before to 2 hours after special events or events at the venues shown in the table titled
"Special Events and Venues," do not perform work that encroaches onto the conventional highway
traveled way.

At the LA28 venues shown in the table titled "Special Events and Venues," do not perform work from
June 1, 2028 to September 1, 2028 that encroaches onto the conventional highway traveled way.

The special events and venues that could impact closures are shown in the following table:
Special Events and Venues



Department of Public Works I-14 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Special event or venue
Affected
routes
Route limits
Academy Awards ceremony 101
Route 110 to Routes 101/134/170
interchange
Antelope Valley Fair 14 Avenue S to Avenue D
Auto Club/California Speedway
EB 10 Route 605 to San Bernardino County line
NB 57
Orange County line to Routes 10/57/71
interchange
EB 60 Route 605 to San Bernardino County line
210 Route 605 to San Bernardino County Line
California State University, Long
Beach, graduation ceremonies
22 Routes 22/405/605 interchange to Route 1
California State University, Los
Angeles, graduation ceremonies
10 Route 5 to Rosemead Blvd
710 Route 60 to Valley Blvd
California State University, Pomona,
graduation ceremonies
10 Route 605 to San Bernardino County line
57 Route 60 to Route 210
Cinco De Mayo at Whittier Narrows
Recreation Area
60 Paramount Blvd to Route 605
Cinco De Mayo parades or festivals in
downtown Los Angeles
5
Routes 5/10/60/101 interchange to
Broadway
NB 101
Routes 5/10/60/101 interchange to Route
110
SB 101 Vermont Ave to Broadway
110 Route 10 to Route 101
Crypto.com Arena/Los Angeles
Convention Center
10
Routes 5/10/60/101 interchange to
Crenshaw Blvd
110 Route 105 to Route 101
Crypto.com Arena/Los Angeles
Convention Center/Peacock
Theater/LA28
10
Routes 5/10/60/101 interchange to
Crenshaw Blvd
110 Route 105 to Route 5
Dignity Health Sports Park 91 Route 110 to Central Ave
Dignity Health Sports Park/LA28
91 Route 110 to Route 710
110 Route 1 to Route 105
405 Route 710 to Route 105
710 Route 1 to Route 105
Dodger Stadium
2 Glendale Blvd to Route 5
5 Route 10 to Route 134
101
Routes 5/10/60/101 interchange to Vermont
Ave
110 Route 10 to Route 5
Dodger Stadium/LA28
2 Glendale Blvd to Route 5
5 Route 10 to Route 134
101
Routes 5/10/60/101 interchange to Vermont
Ave
110 Route 10 to Route 5
Grand Park & LA City Hall/LA28
5
Routes 5/10/60/101 interchange to
Broadway
NB 101
Routes 5/10/60/101 interchange to Route
110
SB 101 Vermont Ave to Broadway



Department of Public Works I-15 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Special event or venue
Affected
routes
Route limits
110 Route 10 to Route 101
Fairplex/LA28
10 Route 605 to San Bernardino County line
57 Route 60 to Route 210
71 Route 60 to Routes 10/57/71 interchange
210 Grand Ave to San Bernardino County line
Frank G. Bonelli Park/LA28
10 Azusa Ave to Central Ave
57 Route 60 to Route 210
71 Route 60 to Routes 10/57/71 interchange
Griffith Park Light Show
5 Route 2 to Route 134
134 Forest Lawn Dr to San Fernando Rd
Hollywood Bowl 101 Vermont Ave to Route 170
Hollywood Christmas Parade 101 Route 10 to Route 170
Kaleidoscope Festival 22 Routes 22/405/605 interchange to Route 1
LA Clays Shooting Sports
Park/Whittier Narrows Recreation
Area/LA28
60 Paramount Blvd to Route 605
164 Route 60 to Route 10
Long Beach Grand Prix
47 Route 110 to Route 710
405 Route 605 to Route 110
710 Route 47 to Route 91
Long Beach Arena/Long Beach
Convention Center/Long Beach
Waterfront/Belmont Shore/Alamitos
Beach/Marine Stadium/Port of Los
Angeles/LA28
1 Orange County Line to Route 110
47 Route 110 to Route 710
110 Route 47 to Route 91
405 Route 605 to Route 110
710 Route 47 to Route 91
Los Angeles Coliseum/BMO Stadium
10
Crenshaw Blvd to Routes 5/10/60/101
interchange
110 Route 105 to Route 101
Los Angeles Coliseum/BMO
Stadium/University of Southern
California/LA28
10
Crenshaw Blvd to Routes 5/10/60/101
interchange
110 Route 105 to Route 5
Los Angeles County Fair
10 Route 605 to San Bernardino County line
57 Route 60 to Route 210
71
Mission Blvd to Routes 57/60/71
interchange
210 Grand Ave to San Bernardino County line
Los Angeles Marathon
5 Route 10 to Route 134
NB 101 Route 10 to Highland Ave
SB 101
Routes 101/134/170 interchange to Route
10
NB 110 Route 10 to Route 5
NB 405 Route 90 to Santa Monica Blvd
SB 405 Sunset Blvd to Santa Monica Blvd



Department of Public Works I-16 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Special event or venue
Affected
routes
Route limits
Los Angeles Music Center
101 Route 10 to Glendale Blvd
110 Route 10 to Route 5
Mexican independence celebration at
Whittier Narrows Recreation Area
60 Paramount Blvd to Route 605
Olvera Street festivals 101 Route 10 to Vermont Ave
Rose Bowl Stadium events
2 Colorado Blvd to Route 210
110 Route 101 to Glenarm St
134 Route 5 to Route 210
210 Route 2 to Route 605
710 Del Mar Blvd to Route 210
Rose Bowl Stadium/LA28
2 Colorado Blvd to Route 210
110 Route 101 to Glenarm St
134 Route 5 to Route 210
210 Route 2 to Route 605
710 Del Mar Blvd to Route 210
Rose Parade float viewing
EB 210 Route 134 to Rosemead Blvd
WB 210 Route 605 to Allen Ave
Santa Anita Race Track
EB 210 Lake Ave to Huntington Dr
WB 210 Route 605 to Baldwin Ave
Santa Anita Park/LA28
EB 210 Lake Ave to Huntington Dr
WB 210 Route 605 to Baldwin Ave
Sepulveda Basin Recreation
Area/LA28
101 Route 27 to Route 134
405 Route 10 to Route 118
SoFi Stadium/Kia Forum/Intuit Dome
105 Route 1 to Route 110
110 Route 105 to Slauson Ave
405 El Segundo Blvd to Route 90
SoFi Stadium/Kia Forum/Intuit
Dome/LA28
105 Route 1 to Route 110
110 Route 91 to Route 10
405 Route 110 to Route 10
South Gate Holiday Christmas Parade 710 Imperial Hwy to Route 5
Point Mugu Air Show
1 Las Posas Rd to Rose Ave
101 Route 23 to Route 126
Universal Studios/International
Broadcast Center (IBC)/LA28
101 Route 2 to Route 405
134 Routes 101/134/170 interchange to Route 5
170
Routes 101/134/170 interchange to Victory
Blvd
University of California, Los
Angeles/Riviera Country Club/Venice
Beach/LA28
1 Route 90 to Route 27
10 Route 1 to Venice Blvd
90 Route 1 to Route 405
405 Route 90 to Route 101
Ventura County Fair
33 Ventura Ave to Route 101
101 Route 1 to Route 33
Ventura Strawberry Festival
1 Las Posas Rd to Rose Ave
101 Route 23 to Route 126





Department of Public Works I-17 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Replace section 12-4.02C(3)(f) with:
12-4.02C(3)(f) Closure Restrictions for Designated Holidays and Special Days
Closure restrictions for designated holidays and special days are shown in the following table:
Lane Closure Restrictions for Designated Holidays and Special Days
Thu Fri Sat Sun Mon Tues Wed Thu Fri Sat Sun Mon

x
H
xx

xx

xx


x

xx
H
xx

xx


x

xx

xx
H
xx


x
SD
xx


x

xx

xx

xx
H
xx


x
H
xx


x
H
xx

xx

xx

xx


x

xx

xx

xx

xx

xx
TH
xx

xx

xx

xx


Legend:
Refer to chart nos. K1 & K2.
x The full width of the traveled way must be open for use by traffic by 0600.
xx The full width of the traveled way must be open for use by traffic.
H Designated holiday
TH Thanksgiving Day
SD Special day





Department of Public Works I-18 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Replace section 12-4.02C(3)(j) with:
12-4.02C(3)(j) Complete Ramp Closure Hour Chart
Comply with the requirements for the complete ramp closure shown in the following chart:
Chart No. J1
Complete Ramp Closure Hours
County: LA Route/Direction: 22/WB

Closure limits: On-ramp from Studebaker Rd
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Mon–Thu C C C C C C S S S C C C C C C C C S S S S C C C C C
Fri C C C C C C S S S C C C C C C C C S S S S C C C C C
Sat C C C C C C C C C C C C C C C C C C C C C C C C
Sun C C C C C C C C C C C C C C C C C C C C C C C C
Legend:
C Ramp may be closed completely.

S Shoulder closure is allowed (right/left).

REMARKS:
The full width of the traveled way must be open for use by traffic when construction activities are not
actively in progress.


Replace section 12-4.02C(3)(k) with:
12-4.02C(3)(k) Conventional Highway Lane Requirement Charts
Comply with the requirements for the conventional highway lane closures shown in the following charts:
Chart No. K1
Conventional Highway Lane Requirements
County: LA Route/Direction: 22/EB
Closure limits: At Los Cerritos Channel
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Mon–
Thu
1 1 1 1 1 1 N N N 1 1 1 1 1 1 1 1 N N N N 1 1 1 1 1
Fri 1 1 1 1 1 1 N N N 1 1 1 1 1 1 1 1 N N N N N 1 1 1 1
Sat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S S S S S S 1
Sun 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S S S S S 1 1
Legend:
1 Provide at least 1 through traffic lane open in the direction of travel.

S Shoulder closure is allowed. (right/left)

N No work is allowed.

REMARKS: The number of through traffic lanes in each direction of travel is 2.



Department of Public Works I-19 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026




Chart No. K2
Conventional Highway Lane Requirements and Hours of Work
County: LA Route/Direction: 22/WB
Closure limits: At Los Cerritos Channel
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Mon–
Thu
1 1 1 1 1 1 N N N 1 1 1 1 1 1 1 1 N N N N 2 2 2 1 1
Fri 1 1 1 1 1 1 N N N 1 1 1 1 1 1 1 1 N N N N 2 2 2 2 1
Sat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S S S S S S 1
Sun 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S S S S S 1 1
Legend:
1 Provide at least 1 through traffic lane open in the direction of travel.

2 Provide at least 2 adjacent through traffic lanes open in the direction of travel.

S Shoulder closure is allowed. (right/left)

N No work is allowed.

REMARKS: The number of through traffic lanes in each direction of travel is 3.




Department of Public Works I-20 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Replace section 12-4.02C(3)(l) with:
12-4.02C(3)(l) Complete Conventional Highway Closure Hour Chart
Comply with the requirements for the complete closure on a conventional highway shown in the following
chart:
Chart No. L1
Complete Conventional Highway Closure Hours
County: LA Route/Direction: 22/EB
Closure limits: Pepper Tree Lane to Studebaker Rd On-Ramp
Hour 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Mon–
Thu
C C C C C C C C C
Fri C C C C C C C C
Sat C C C C C C C C
Sun C C C C C C C C C C
Legend:
C Conventional highway may be closed completely.

No complete conventional highway closure is allowed.

REMARKS:


Replace item 2 in the list in the 2nd paragraph of section 12-4.02C(4) with:
2. Installation, maintenance, or removal of Category 1 and Category 2 traffic control devices and when
using impact attenuator vehicles



DTM(07)**
Work utilizing man-lift or similar equipment to access bridge

Replace 3rd paragraph of section 12-4.02C(4) with:
For time periods at the beginning or end of work when the lane requirement charts do not allow the
closure of the adjacent traffic lane, the following construction activities are allowed without a buffer lane:
1. Parking, positioning, loading, unloading vehicles, or storing equipment or materials necessary for the
work being performed.
2. Placing, removing or maintaining paving marking or pavement markers.
3. Operations not performed by workers on foot such as planing, sweeping, applying a tack coat, or
operating a crane.
4. Operations where workers on foot are protected, at each work location, within the same closure by an
impact attenuator vehicle in the lane adjacent to live traffic.


For multilane freeway or expressway lane closures, do not place the 2L tangent section shown along lane
lines between the lane closure tapers.




Department of Public Works I-21 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
If traffic control is performed for a stationary closure where median shoulders are less than 8 feet, the
closure must comply with the plan sheet titled "Traffic Control System for Median Shoulders Less Than 8
Feet" or "Traffic Control System for High Occupancy Vehicle Lanes with Median Shoulders Less Than 8
Feet."
Before using a shoulder as a traffic lane for the duration of a work shift closure, sweep and clear the
shoulder of debris before traffic use.


Replace the paragraphs of section 12-4.02C(8)(b) with:
If a ramp closure is allowed, post a special advance notice publicity sign, SP-1, at an authorized location
at least 7 days before the ramp closure.
If an off-ramp is allowed to be closed, install an SP-5 sign for the exit ramp closure. Place the sign on the
right shoulder of the freeway upstream of the preceding off-ramp.


Replace section 12-4.02C(12) with:
12-4.02C(12) Construction Work Zone Speed Limit Reduction
12-4.02C(12)(a) General
Section 12-4.02C(12) includes specifications for providing, installing, maintaining, and removing traffic
control devices for reducing the speed limit for the construction work zones.
Speed limit reduction is limited to 10 mph from the posted speed limit in construction work zones unless a
greater speed limit reduction is specified. Construction work zone speed limit reduction is required when
construction activities are active in a closure as a temporary condition.
Temporary construction work zone speed limit reduction is required for lane closures when construction
activities require workers to be present within the lane closures. Construction work zone speed limit
reduction is not required for short duration closures of 1 hour or less or when the length of lane closure is
1/2 mile or less.
12-4.02C(12)(b) Materials
For temporary construction work zone speed limit reduction, signs must comply with the requirements for
portable signs in section 12-3.11.
The PCMS must comply with section 12-3.32.
Radar feedback sign LED displays must have LED:
1. Character of at least 18 inches in height for freeways and expressways
2. Character of at least 14 inches in height for conventional highways
3. Character's width-to-height ratio from 0.7 to 1.0
4. Character's stroke width-to-height ratio of 0.2

Portable radar speed feedback sign must comply with section 12-3.37.
Portable radar speed feedback sign trailers must have a minimum of 9 cones placed on a taper in
advance of the device and along the edge of shoulder or edge of the traveled way at 25-foot intervals to a
point not less than 25 feet past the device.
Temporary radar speed feedback sign system must comply with the specifications for:
1. Temporary electrical system in section 87-20
2. Radar speed feedback sign system in section 87-14 except the LED character display must remain
blank when no vehicles are detected or when the detected vehicle speed is 10 miles or less than the
pre-set speed



Department of Public Works I-22 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

12-4.02C(12)(c) Construction
Advise motorists of construction work zone speed limit reductions starting 14 days in advance of
implementing the speed limit reduction using a PCMS displaying the alternating messages Reduced
Speed and Starting XX/XX/XX (Date).
When construction work zone speed limit reduction is in effect, the PCMS message must be XX ZONE
AHEAD and WILL BE ENFORCED. Mount a 48-by-48-inch W3-5 XX "SPEED LIMIT" ahead symbol sign
on the PCMS trailer.
Cover all existing speed limit signs while the construction work zone speed limit reduction is in effect.
Remove covers when construction work zone speed limit reduction is no longer in effect.
For temporary construction work zone speed limit reduction for lane closures, install portable radar speed
feedback system as shown. In addition to the portable radar speed feedback system shown, place a
portable radar speed feedback system 400 feet upstream of active work areas. The portable radar speed
feedback system must include a R2-1 sign with G20-5aP "WORK ZONE" plaque.
For on-ramps within the limits of a construction work zone speed limit reduction, place R2-1 signs with
G20-5aP "WORK ZONE" plaque within 500 feet of entrance ramps. You may use the strap and saddle
method for mounting these sign panels on the entrance ramp lighting standard at the merge point.
For expressways, place a R2-1 sign with G20-5aP "WORK ZONE" plaque approximately 500 feet
downstream from intersections within the limits of a construction work zone speed limit reduction.
For conventional highways, place a R2-1 sign with G20-5aP "WORK ZONE" plaque approximately 500
feet downstream from major intersections within the limits of a construction work zone speed limit
reduction.
Within the limits of a construction work zone speed limit reduction, place intermediate R2-1 signs with
G20-5aP "WORK ZONE" plaque at intervals not exceeding three miles.
You may use variable speed limit signs where R2-1 signs are described.
For chip seal projects, place construction work zone speed limit reduction signs and devices as shown
except place additional intermediate signs, W8-7 "LOOSE GRAVEL" sign, and a W13-1 (35) plaque every
2000 feet.
12-4.02C(12)(d) Payment
For construction work zone speed limit reduction only during lane closures, signs are included in the bid
item for traffic control system, PCMS is paid for as traffic control system, and portable radar speed
feedback sign is paid for as portable radar speed feedback sign systems. Covering and uncovering
existing speed limit signs for each lane closure are included in the price paid for traffic control system.


Replace section 12-4.02C(13) with:
12-4.02C(13) Traffic Control Supervisors
12-4.02C(13)(a) General
12-4.02C(13)(a)(i) Summary
Section 12-4.02C(13) includes specifications for training, certification, and responsibilities for traffic
control supervisors.
The traffic control supervisor:
1. Must be knowledgeable about:
1.1. Section 7-1.03 “Public Convenience"
1.2. Section 7-1.04 “Public Safety”



Department of Public Works I-23 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
1.3. Section 12 “Temporary Traffic Control”
1.4. Traffic control system Standard Plans
1.5. Traffic handling plans and detour plans
2. Must coordinate the implementation and operation of temporary traffic control, including those of
subcontractors, suppliers and any adjacent construction or maintenance operations

The traffic control supervisor must:
1. Be exclusively dedicated to the responsibilities and duties required for traffic control
2. Be on site when active coordination of temporary traffic control, including those of subcontractors,
suppliers, and any adjacent construction or maintenance operations is required
3. Be available after work hours, on site within 2 hours of being contacted
4. Perform weekly reviews of the project when no active coordination of temporary traffic control is
required.

12-4.02C(13)(a)(ii) Definitions
Not Used
12-4.02C(13)(a)(iii) Submittals
12-4.02C(13)(a)(iii)(A) General
Every Monday by noon, submit traffic control weekly report for the previous week as an informational
submittal.
12-4.02C(13)(a)(iii)(B) Quality Assurance Submittals
Submit as informational submittals:
1. Traffic control supervisor certification, traffic control technician and flagger certification, and each
alternate traffic control supervisor. The certification must include:
1.1. Name of the individual receiving certification.
1.2. Name of entity providing certification.
1.3. Date of certification.
1.4. Certification expiration date.
2. Contact information for each traffic control supervisor and each alternate traffic control supervisor.
The submittal must include the name, phone number and email address.
3. Traffic control weekly reports. The traffic control weekly report must include:
3.1. Date.
3.2. Name of traffic control supervisor.
3.3. Location of traffic control. Provide description, County, Route, Postmile or Station and
Direction.
3.4. Reference to traffic control standard plan or project plan sheet.
3.5. Documentation of:
3.5.1. Verification that closure is in compliance with the Contract requirements.
3.5.2. Modifications to the traffic control including, a description of the change, the reason for
the change, time when the change is implemented.
3.5.3. Traffic control system monitoring, including time of inspection and observations.
3.5.4. Incidents that occur while the traffic control system is in place.
3.5.5. Weekly reviews including any deficiencies found and when corrections were
implemented.
3.6. Record of workdays used by the traffic control supervisor to coordinate traffic control systems
and traffic handling plans before construction, monitor active work zone traffic activities and
operations, perform weekly nighttime inspections, and perform weekly reviews when there are
no active traffic activities. Include:
3.6.1. Date.
3.6.2. Start and end time.
3.6.3. Location of traffic control.
3.6.4. Description of work performed.



Department of Public Works I-24 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

12-4.02C(13)(a)(iv) Quality Assurance
12-4.02C(13)(a)(iv)(A) General
The traffic control supervisor must coordinate with the Engineer the implementation of traffic control
systems and traffic handling plans before construction and before major changes in traffic control.
12-4.02C(13)(a)(iv)(B) Training and Certifications
A traffic control supervisor must be certified as a flagger, traffic control technician and as a traffic control
supervisor. Department authorized training providers list is available at:
https://dot.ca.gov/programs/construction/safety-traffic/safety-training-courses

12-4.02C(13)(a)(iv)(C) Quality Control
The traffic control supervisor must:
1. Ensure safe, convenient, and effective passage of motorists, bicyclists, pedestrians, workers, and first
responders, through or around the construction work zone.
2. Inspect the condition of traffic control devices on a regular basis for compliance with the quality
requirements in the American Traffic Safety Services Association Publication Quality Guidelines for
Temporary Traffic Control Devices and Features.
3. Ensure the labor, equipment, and materials are available to immediately correct deficiencies in the
traffic control system.
4. Ensure that employees have flagger certificate and traffic control technician certification when
performing those activities.
5. Ensure the status of closures is reported using the LCS Mobile web page.
6. Verify that all closures comply with the Contract requirements and that traffic control devices,
including PCMS, arrow boards and radar speed feedback signs, are functioning after traffic control
installation.
7. Review and verify that temporary traffic control daily report form is completed for every closure.
8. Review project temporary traffic control weekly to ensure that all traffic control devices and pavement
delineation are effective and comply with the construction area sign plans, traffic handling plans, and
detour plans. At least weekly, perform a nighttime review of the temporary traffic control devices and
temporary pavement delineation to ensure compliance.

12-4.02C(13)(b) Materials
Not Used
12-4.02C(13)(c) Construction
The traffic control supervisor is responsible and has full authority to act on behalf of the Contractor for
administering temporary traffic control.
Notify the Engineer before an alternate traffic control supervisor assumes the duties of the assigned traffic
control supervisor.
Traffic control supervisor must have:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access

The traffic control supervisor must monitor work zone traffic activities and operations, including detours, to
ensure the traffic control is functioning properly.
Monitor work zone traffic control, if an imminent danger is identified, take immediate corrective action and
notify the Engineer. Notify the Engineer of modifications needed to the traffic control system plans if the
traffic control is not functioning as required due to changes in traffic site conditions. Do not implement



Department of Public Works I-25 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
any changes to the traffic control system plans or traffic handling plans until the proposed revisions are
authorized.
12-4.02C(13)(d) Payment
The traffic control supervisor is paid for each workday:
1. Coordinating the implementation of traffic control systems and traffic handling plans before
construction
2. Monitoring active work zone traffic activities and operations during construction
3. Performing weekly nighttime inspections
4. Conducting weekly reviews when there are no active work zone traffic activities and operations

Workdays are days the traffic control supervisor is at the job site performing traffic control supervisor's
duties based on the traffic control weekly reports, with each workday counting as 1 measurement unit.


Replace section 12-4.03C(1) with:
12-4.03C(1) General
At each location where falsework is constructed over a street or route provide openings through the
bridge falsework. The Engineer determines the exact location of the openings. The type, minimum width,
height, and number of openings at each location, and the location and maximum spacing of the falsework
lighting if required for each opening, must comply with the requirements shown in the following table:
Palo Verde Ave POC Bridge No.53-2713

Route 22, Westbound
Number Width
(feet)
Height
(feet)
Vehicle openingsb 1 52 15
Pedestrian openings 1 4 7

Route 22, Eastbound
Number Width
(feet)
Height
(feet)
Vehicle openingsb 1 40 15
NOTE:
R = Right side of traffic
L = Left side of traffic
C = Centered overhead
aSpacing is the maximum distance from center to center between fixtures.
bWidth of vehicular openings is the clear width between temporary barrier system or other protective
work.
2. Use only for special roadways (e.g., fire utility access, quasi-public roads) with
very light traffic. Falsework lighting is required, and no temporary barrier system is
provided in falsework openings. Add the location and spacing of falsework
pavement lighting from the table below.


Add between the 1st and 2nd paragraphs of section 12-4.04C:
A pedestrian facility closure on the same side of the highway is limited to no more than 1 block. When
working on one side of the highway, the pedestrian facility on opposite side of the highway within the
same block must be open.
Schedule operations such that all pedestrian facility closures do not exceed 1 work shift. At the end of
each work shift, you must provide the walkway surface complying with the requirements of a temporary



Department of Public Works I-26 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
pedestrian access route specified in section 12-4.04. For all activities requiring construction of a
pedestrian facility, you must complete the work within 10 working days.


Add to the end of section 12-4.05C:
You may occupy one 5-foot width of the bridge pedestrian path adjacentto the curb during cleaning and
painting activities. Occupy only 1 side of the bridge at a time.


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

14 ENVIRONMENTAL STEWARDSHIP
Replace section 14-11.09 with:
14-11.09 MINIMAL DISTURBANCE OF REGULATED MATERIAL CONTAINING AERIALLY
DEPOSITED LEAD
14-11.09A General
Section 14-11.09 includes specifications for handling and managing regulated material containing ADL
when there is a minimal disturbance. Regulated material containing ADL has average ADL concentrations
over 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead tested using the California Waste
Extraction Test or equal to or greater than 5 mg/L soluble lead tested using the toxicity characteristic
leaching procedure.
Compliance with 22 CA Code of Regs is not required where there is minimal disturbance of regulated
material containing ADL.
Management of regulated material containing ADL exposes workers to health hazards that must be
addressed in your lead compliance plan under section 7-1.02K(6)(j)(ii).
Handle regulated material containing ADL under the rules and regulations of the following agencies:
1. Cal/OSHA
2. RWQCB, Region 4 — Los Angeles
3. South Coast Air Quality Management District

Regulated material containing ADL is typically found within the top 2 feet of material in ADL-impacted
areas of the job site.Minimal disturbance of regulated material containing ADL occurs where the following
work activities are conducted:
1. temporary construction signs
14-11.09B Material Management
Handling of regulated material containing ADL must result in no visible dust migration. Use dust control
measures. A means of controlling dust must be available at all times.
Separate material from vegetation. The resulting soil must remain on the job site.
Surplus material from the areas with regulated material containing ADL must remain in the area of
disturbance. Do not dispose of surplus material outside the highway.


Add to the 1st paragraph in section 14-11.13A:
The existing paint system and patina on bridge no. 53-2713 will be disturbed as part of the work activities.
The paint system and/or patina may contain heavy metals such as lead, zinc, or chromium.



Department of Public Works I-27 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Replace section 14-11.13B(3) with:
14-11.13B(3) Air Monitoring Reports
Air monitoring reports, including test results for samples taken after corrective action, must be prepared
by the CIH and submitted:
1. Orally within 48 hours after sampling
2. As an informational submittal within business 5 days after sampling

Air monitoring reports must include:
1. Date and location of sample collection, sample number, Contract number, bridge number, name of
the structure, and District-County-Route-Post Mile
2. Name and address of the certified laboratory that performed the analyses
3. Chain of custody documentation
4. List of emission control measures in place when air samples were taken
5. Air sample results compared to the appropriate permissible exposure limit (PEL)
6. Corrective action recommended by the CIH to ensure exposure to airborne metals outside
containment systems and work areas is within specified limits
7. Signature of the CIH who reviewed the data and made recommendations


Replace section 14-11.13B(4) with:
14-11.13B(4) Soil Sampling Results for Debris Containment Verification
Submit test results of soil analyses verifying debris containment, including results for soil samples taken
after corrective action:
1. Orally within 48 hours after sampling
2. Within 5 days after sampling

Soil sampling results must include:
1. Date and location of sample collection, sample number, Contract number, bridge number, name of
the structure, and District-County-Route-Post Mile
2. Concentrations of heavy metals expressed in mg/kg and mg/L
3. Name and address of the certified laboratory that performed the analyses
4. Chain-of-custody documentation


Replace section 14-11.13D with:
14-11.13D Work Area Monitoring
14-11.13D(1) General
Monitor the ambient air and soil in and around the work area to verify the effectiveness of the containment
system. Work area monitoring includes:
1. Collecting, analyzing, and reporting air and soil test results
2. Recommending corrective action whenever specified air or soil concentrations are exceeded

Collect air and soil samples at locations designated by the Engineer.
14-11.13D(2) Air Monitoring
Air monitoring must be performed under the direction of a CIH.
Collect and analyze air samples to detect lead under the NIOSH Method 7082 using a detection limit of at
least 0.05 µg/m3. Collect and analyze air samples to detect other metals under NIOSH Method 7300
using a detection limit of at least 1 percent of the appropriate PEL specified by Cal/OSHA. You may use
alternative methods of sampling and analysis with equivalent detection limits.



Department of Public Works I-28 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Concentrations of airborne metals outside containment systems and work areas must not exceed any of
the following:
1. Average of 1.5 µg/m3 of air per day and 0.15 µg/m3 per day on a rolling 90-day basis. Calculate the
average daily concentrations based on accumulated monitoring data and projections based on
monitoring trends for the next 90 days or to the end of the work subject to the lead compliance plan if
less than the specified averaging period.
2. 10 percent of the action level specified for lead by 8 CA Code of Regs §1532.1.
3. 10 percent of the appropriate PELs specified for other metals by Cal/OSHA.

Collect air samples daily during work activities that disturb the existing paint system. Air samples must be
analyzed within 48 hours by a facility accredited by the Environmental Lead Laboratory Accreditation
Program of the American Industrial Hygiene Association. If concentrations of airborne metals exceed
allowable levels, modify the containment system or work activities to prevent further release of metals. If
the CIH recommends corrective action, collect and analyze additional samples after implementing the
corrective action unless ordered otherwise.
14-11.13D(3) Soil Sampling for Debris Containment
Collect 4 soil samples before starting work and collect 4 soil samples within 36 hours after cleaning
existing steel. A soil sample consists of 5 plugs, each 3/4 inch in diameter and 1/2 inch deep, taken at
each corner and center of a 1 sq yd area. Analyze soil samples for:
1. Total lead, zinc, and chromium by US EPA Method 6010B or US EPA Method 7000 series
2. Soluble lead, zinc, and chromium by California Waste Extraction Test (CA WET)

The laboratory that analyzes the samples must be certified by the SWRCB's ELAP for all analyses to be
performed.
Concentrations of heavy metals in the work area's soil must not increase when the existing paint system
is disturbed. If soil sampling shows an increase in the concentrations of heavy metals after completing the
work:
1. Clean the affected area
2. Resample until soil sampling and testing shows concentrations of heavy metals less than or equal to
the concentrations collected before the start of work


Add to the end of the 1st paragraph of section 14-11.13F:
This waste characterization testing must include:
1. Total lead, zinc, and chromium by US EPA Method 6010B
2. Soluble lead, zinc, and chromium by California Waste Extraction Test (CA WET)
3. Soluble lead, zinc, and chromium by Toxicity Characteristic Leaching Procedure (TCLP)


Add to the beginning of section 14-11.13G(2):
After the Engineer accepts the waste characterization test results, dispose of the debris:
1. Within 30 days after accumulating 220 lb of debris
2. At a DTSC-permitted Class I facility located in California

Make all arrangements with the operator of the disposal facility.
If less than 220 lb of hazardous waste is generated in total, dispose of it within 30 days after the start of
the accumulation of the debris.




Department of Public Works I-29 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION III EARTHWORK AND LANDSCAPE
19 EARTHWORK

Add to the end of section 19-3.02E:
Slurry cement backfill may contain returned plastic concrete.
Slurry cement backfill containing returned plastic concrete must comply with the specifications for
concrete containing returned plastic concrete.


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

20 LANDSCAPE

Add between the 7th and 8th paragraphs of section 20-2.01C(2):
Apply 1 application of a preemergent pesticide to trenched areas in existing ground cover areas and to
trenched areas adjacent to fences, curbs, dikes, and shoulders. The Engineer determines when the
preemergent pesticide must be applied.


Replace item 2.1 in the list in the 9th paragraph of section 20-2.01C(2) with:
2.1. Do not remove a width of more than 12 inches. Keep removed turf cool and moist.


Replace item 2.2 in the list in the 9th paragraph of section 20-2.01C(2) with:
2.2. Replace with the removed turf under section 20-3.02C(3)(e).


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION VI STRUCTURES
55 STEEL STRUCTURES
Add to section 55-1.01A:
Structural steel consists of:
1. Pier cap brackets and seat extenders
2. High strength rods, nuts, and washers

Add to section 55-1.01D(1):
High strength rods must conform to the requirements of ASTM Designations: A722 for uncoated,
including all supplementary requirements. Nuts for high strength rods must be from the same
manufacturer and be capable of developing the full capacity of the rod.




Department of Public Works I-30 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Add to section 55-1.02E(6):
55-1.02E(6)(d) Thread Locking Compound for High Strength Rods
Provide an approved thread locking system for high strength rods, consisting of a cleaner, primer and
anaerobic thread-locking adhesive. Thread locking system used must be on the Authorized Material List.
Lubricants and foreign materials must be removed from the threaded areas of the rod and nut using an
approved cleaner and small wire brush. Apply primer to the threaded areas of both parts. Apply anaerobic
adhesive to fill the threads on the rod in the area of the final position of the nut.
Install the nut. If shown, install the nut to the torque shown on the plans.
Apply an additional fillet of anaerobic adhesive completely around the exposed junctions of the nut and
exposed threads.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

60 EXISTING STRUCTURES

60-6 GRAFFITI REMOVAL
60-6.01 GENERAL
60-6.01A Summary
Section 60-6 includes specifications for the graffiti removal through cleaning and treatment procedures on
weathering steel surfaces where shown.
60-6.01B Definitions
patina: Protective corrosion-resistant layer that forms over time on weathering steel through an oxidation
process.
weathering steel: Weather resistant high-strength low-alloy steel that develops a protective layer of
patina over time.
60-6.01C Submittals
Submit a work plan on the methods, procedures, and materials used for graffiti removal. Include the
containment system, and procedures to protect adjacent surfaces from staining during the work.
Submit a certificate of compliance and SDS for cleaning materials.
60-6.01D Quality Assurance
60-6.01D(1) General
Not Used
60-6.01D(2) Demonstration Panel
Prepare demonstration panel on existing weathering steel surface prior to starting graffiti removal work.
Demonstration panel must be:
1. At an authorized location on the bridge representing the variety of the graffiti removal work to be
performed.
2. Prepared using the personnel, materials, equipment, and methods to be used in the work.

The Engineer may request that additional demonstration panels until the desired results are attained.
Obtain authorization of the demonstration panels before starting graffiti removal work.



Department of Public Works I-31 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
The Engineer uses the authorized demonstration panels to determine the acceptability of the graffiti
removal work.
If authorized, demonstration panels, or portions thereof, may be incorporated into the graffiti removal
work.
60-6.02 MATERIALS
Do not use acids for cleaning.
Use dry-ice pellets as the abrasive media for blast cleaning weathering steel. Abrasive media comprised
of metal particles is not allowed.
60-6.03 CONSTRUCTION
60-6.03A General
Protect adjacent surfaces from staining during the cleaning and treating processes.
60-6.03B Containment System
Construct containment system. The containment system must contain all water, resulting debris, and
visible dust produced during graffiti removal.
Properly maintain the containment system while work is in progress and do not change the containment
system unless authorized.
The containment system must provide a vertical clearance of 6.67 feet and a horizontal clearance of 4
feet for the passage of pedestrian traffic. The containment system must provide a vertical clearance of 15
feet to vehicle traffic on Route 22.
60-6.03C Cleaning and Treating
Remove graffiti on weathering steel using one of the following cleaning methods:
1. SSPC-SP 1: Solvent Cleaning
2. SSPC-SP 2: Hand Tool Cleaning
3. SSPC-SP 3: Power Tool Cleaning
4. SSPC-SP 7: Brush-Off Blast Cleaning

Removal methods must avoid excessive removal of the oxide layer that forms on weathering steel.
Feather out graffiti removal areas into surrounding surfaces and avoid streaking of the patina.
Treat the cleaned surfaces to a series of wetting and drying cycles. Periodically wet the surfaces to help
initiate the patina formation and to aid in achieving a more uniform finish. Provide between 5 and 10
wet/dry cycles until the desired results are achieved.
60-6.04 PAYMENT
Not Used

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION VIII MISCELLANEOUS CONSTRUCTION
75 MISCELLANEOUS METAL

Add to the list in the 2nd paragraph of section 75-3.01A:
6. Vertical Support Brackets, drilling holes in existing steel, and HS steel fastener assemblies
7. Horizontal Support Bracket, drilling holes in existing steel, and HS steel fastener assemblies



Department of Public Works I-32 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026



Add to section 75-3.01C(1):
Submit shop drawings and calculations for the Horizontal Support Brackets. The shop drawings and
calculations must be sealed and signed by an engineer who is registered as a civil engineer in the State.
Design support brackets to resist all vertical and horizontal loads. Comply with the current AASHTO
LRFD Structural Supports for Highway Signs, Luminaires, and Traffic Signals.
The shop drawings and calculations must include:
1. Complete details for the construction of the work, including methods of attachment, construction
methods, sequence of shop and field assembly, installation procedures, and methods for adjustment
to line and grade.
2. Welding sequences and procedures
3. Material specifications and grades
4. Material preparation and painting procedures
5. Design calculations that include stresses and deflections in all load carrying components.

Allow 30 days for the Department's review.


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

77 LOCAL INFRASTRUCTURE

Replace section 77-1 with:
77-1 GENERAL
77-1.01 GENERAL
77-1.01A Summary
Section 77-1 includes general specifications for constructing local infrastructure.
The work includes:
1. Modifying the City’s existing electrical system
2. Installing Lighting System for Community Identification (Letters)
3. Installing Lighting System for Community Identification (Panels)

77-1.01B Definitions
Not Used
77-1.01C Submittals
Comply with section 86-1.01C(1) General.
Comply with section 87-1.01C Submittals.
77-1.01D Quality Assurance
Comply with section 86-1.01D(1).

77-1.01D(1) General
Not Used



Department of Public Works I-33 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
77-1.01D(2) Preconstruction Meeting
Schedule a meeting with the Engineer and the City of Long Beach Inspection at (562) 570-5160, 5
business days before work begins.
77-1.01D(3) Warranty
LED luminaires must be warrantied against functional failure and physical or mechanical deterioration for
30 days from the date of purchase. The warranty must cover all expenses for parts, labor, and shipping.
Provide replacement units within 5 business days of failure notification. The warrantee period must start
on the project acceptance date.
77-1.02 MATERIALS
77-1.02A General
Electrical material and equipment must comply with section 86.
Materials must comply with:
1. FCC rules
2. ITE standards
3. NEC
4. California Electrical Code
5. Title 24, Part 3, CCR
77-1.02D Conduit
See the project plans for conduit requirements.

77-1.02F Pull Boxes
A lighting pull box must have the cover marking CITY LIGHTING.
See the project plans for pull box requirements.

77-1.03 CONSTRUCTION
77-1.03A General
Install electrical material and equipment under section 87.

77-1.03B Conductors and Wiring
Identify cables in controller cabinets with ½-by-2 inch plastic tag, stamped with the cable run identification
characters in 1/4-inch letters, and secured to the cable with 2 nylon tie-wraps.
Label all conductors inside pull boxes.
Use the no. 8 AWG bare copper wire as the ground reference for testing when existing conduit is non-
metallic.
77-1.03D Conduit
Verify horizontal and vertical alignments of existing utilities before installation of conduit. Install conduit of
the same size and material throughout the run.
Install a separate no. 8 AWG ground wire and a pull tape in conduits at the time of installation. Splice
ground wires together and connect them to the grounding electrode in service equipment enclosure.
Backfill trench with:
1. A minimum of 3 inches of sand bedding before installing the conduit
2. 18 inches of slurry concrete over the conduit



Department of Public Works I-34 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
3. 6 inches of native material over the slurry cement

Use slurry concrete under section 19-3.02E except, the size of the aggregate must be 3/8 inch or smaller.
Place warning tape in the trench 6 inches below finished grade.
Grade the trench surface to match the existing grade.
77-1.03D City of Long Beach Electrical System
Obtain an underground service alert inquiry ID number by calling (800) 422-4133. Allow 2 business days
after the ID number is obtained to notify utility owners before excavation or drilling work is started. The ID
numbers will not be given more than 10 days before starting excavation work.
Notify the Engineer first and subsequently the Public Works Department of the City of Long 5 business
days before starting construction in areas where excavation operations are to be performed.
77-1.04 PAYMENT
Not Used


77-2 MODIFYING EXISTING ELECTRICAL SYSTEM (CITY)
77-2.01 GENERAL
Section 77-2 includes specifications for modifying existing electrical systems (city) for the City of Long
Beach.
Modifying existing electrical system (city) includes:
1. Conduit
2. Conductors and cables
3. Pull boxes
4. Circuit breakers

The components of modifying existing electrical system (city) are shown on the project plans.
77-2.02 MATERIALS
77-2.02A General
Refer to Supplemental Project Information for manufacturer specifications.77-2.02B Circuit
breakers
See the project plans for circuit breaker requirements.
77-2.03 CONSTRUCTION
77-2.03A General
Refer to Supplemental Project Information for manufacturer installation requirements.
77-1.03B Installation of Pull Boxes
8See the project plans for installation of pull box requirements.
77-2.04 PAYMENT
Not Used





Department of Public Works I-35 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
77-3 LIGHTING SYSTEMS (CITY)
77-3.01 GENERAL
77-3.01A Summary
Section 77-3 includes specifications for constructing lighting systems (city).
Lighting system includes:
1. Junction boxes
2. Conduit
3. Conductors and cables
4. LED for letters
5. Wall mounted luminaires
6. Panel Board
7. Pharos DMX Controller
8. Fuse splice connectors
9. Surface Mounted Enclosure
10. Cradlepoint IBR900 Router

77-3.01B Definitions
Not Used
77-3.01C Submittals
77-3.01C(1) General
The components of each lighting system below are shown on the project plans.
• Internal Illumination for Community Identification (Letters)
• Wall mounted lighting for Community Identification (Panels)

77-3.01C(2) Wall Mounted Luminaires
Submit for a luminaire:

1. Maximum power in watts
2. Maximum designed junction temperature
3. L70 in hours when extrapolated for the average nighttime operating temperature
4. Life expectancy based on the junction temperature
5. Manufacturer's data sheet for the power supply, including the rated life

77-3.01D Quality Assurance
Lighting systems must exceed Title 24 efficiency requirements by 10 percent.

77-3.02 MATERIALS
77-3.02A General
Not used

77-3.02B Junction boxes
Junction boxes shall be weatherproof, corrosion resistant, and rated at least NEMA 4X. Boxes shall be
galvanized or stainless steel, equipped with gaskets and watertight fittings. The exterior color shall closely
match the wall or surface on which the box is mounted. Junction box dimensions shall be determined in
accordance with NEC 314.28 and based on the required space for conductor bending radius, splices, and
conduit entries after all internal components and terminations have been specified.



Department of Public Works I-36 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
77-3.02C LED for Letters
See the project plans for LED letter requirements.
77-3.02D Wall Mounted Luminaires
Wall mounted luminaires must:
1. Be Insight Lighting Medley Exterior Route (MER) color-changing LED linear luminaires.
2. Have a length of 48 inches.
3. Be lighting fixture catalog number is MER-LO-40K-U-1010-EAB-3-48-NO-TB-R-CW-JC-3.
4. Be weatherproof and corrosion resistant.

77-3.02E Panel Board
Provide a tamper-proof, NEMA 4X rated, 240V, 1-phase panelboard with a minimum 60A main, minimum
12 spaces, and a minimum 10 kAIC short-circuit rating. Panelboard shall include a main overcurrent
protective device, branch circuit breakers, copper bus, grounding bar, and all required accessories for a
complete installation. Enclosure shall be outdoor-rated, corrosion-resistant, and constructed to prevent
unauthorized access. Provide equipment fully assembled, factory-tested, and compliant with applicable
industry standards.
77-3.02F Pharos DMX Controller
See the project plans and manufacturer specifications for requirements.
77-3.02G Surface Mount Enclosure
Enclosures shall be weatherproof, corrosion resistant, and rated at least NEMA 4X. shall be galvanized or
stainless steel, equipped with gaskets and watertight fittings. The exterior color shall closely match the
wall or surface on which the enclosure is mounted. Enclosure dimensions shall be determined in
accordance with NEC 314.28 and based on the required space for internal equipment, conductor bending
radius, and conduit entries after all internal components have been specified.
See the project plans and manufacturer specifications for requirements.
Each enclosure shall include a hasp with a 7/16-inch diameter hole suitable for padlocking.

77-3.02G Cradlepoint Router
Provide a Cradlepoint IBR900 Series ruggedized cellular router or approved equal. The unit shall support
LTE connectivity, dual SIMs, Wi-Fi access, and Ethernet ports for local network communication. Install the
router in a NEMA 4X enclosure with proper power, grounding, and antenna connections. Configure for
remote access through NetCloud Manager. See the project plans and manufacturer specifications for all
installation and performance requirements.
77-3.03 CONSTRUCTION
77-3.03A General
Not Used

77-3.03D Wall Mounted Luminaires
Install two wall mounted luminaires below each panel per manufacturer's instructions and as shown.
Label the month and year of the installation inside the luminaire housing's door.
Perform the conductor and operational tests for the system.
For a wall-mounted luminaire, provide 4 external mounting taps on an existing structure.
Place the wall-mounted luminaires in operation as soon as practicable after the falsework has been
removed from the structure.



Department of Public Works I-37 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
If the Engineer orders wall-mounted luminaires to be activated before permanent power service is
available, installing and removing the temporary power service is change order work.
77-3.04 PAYMENT
Not Used


^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

78 INCIDENTAL CONSTRUCTION

Replace 78-4.03A(4) with:
78-4.03A(4) Quality Assurance
78-4.03A(4)(a) Demonstration Panel
Use bridge pier 9 as the demonstration panel for Prepare and Paint Concrete Bridge Pier

The demonstration panel must be:
1. Painted using the same personnel, materials, equipment, and methods to be used in the work
2. The entirety of pier 9 must be painted to the limits shown.

If ordered, prepare and paint additional demonstration panels on pier 9 until a satisfactory color gradient
is attained.

The Engineer uses the authorized demonstration panel to determine the acceptability of the painted
surface.
The demonstration panel must closely resemble the referee sample described in section 78-4.03B.


Replace the 2nd paragraph of section 78-4.03B with:
The paint must consist of the two colors. Both colors must be from the same manufacturer. The first color
must match Matthews Paint color Blue Flag (MP01992). The second color must match Matthews Paint
color Jet Stream (MP07490)
Comply with Section 91-5.
The painted concrete must match the color of the referee sample located at:
City of Long Beach
411 W. Ocean Blvd
Long Beach, CA 90802


Replace section 78-4.03C(1) with:
78-4.03C(1) General
Paint bridge identification under section 51-1.03E(1).


Add to section 78-4.03C(3):
Paint the surfaces such that they gradually transition between the two paint colors specified and closely
resemble the two-color gradient of the referee sample.



Department of Public Works I-38 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Replace items 2 and 3 in the list in the 1st paragraph of section 78-4.06B with:

2. Be compatible with painted concrete surfaces
3. Have a clear satin finish when dry




Replace section 78-6 with:
78-6 COMMUNITY IDENTIFICATION (PANELS)
78-6.01 GENERAL
78-6.01A Summary
Section 78-6 includes specifications for furnishing and installing the Community Identification (Panels) as
shown, and as described in the Information Handout in the document titled Signature Gateway East
Concept. Panels consist of perforated aluminum and attachments to bridge members.
78-6.01B Definitions
Not used
78-6.01C Submittals
Submit a certificate of compliance for aluminum and all other components used in the panels.
Submit shop drawings and calculations for the panels. The shop drawings and calculations must be
sealed and signed by an engineer who is registered as a civil engineer in the State.
The shop drawings and calculations must include:
1. Panel layout
2. Panel dimensions
3. Complete details for the construction of the work, including methods of attachment, construction
methods, sequence of shop and field assembly, installation procedures, and methods for adjustment
to line and grade.
4. Welding sequences and procedures
5. Material specifications and grades
6. Material preparation and painting procedures
7. Design calculations that include stresses and deflections in all load carrying components of the
panels.

Allow 30 days for the Department's review.
78-6.01D Quality Assurance
78-6.01D(1) General
Welding must comply with AWS D1.2 for aluminum.
78-6.01D(2) Mock-ups
Mock-up must be:
1. Full size representing one panel selected by the Engineer.
2. Available for viewing by the Engineer for a period of 5 days at the fabrication site. prior to delivery to
project site.
3. Furnished to the project site and installed at an authorized location on the bridge.
4. Furnished and installed using the personnel, materials, equipment, and methods to be used in the
work.
5. Authorized before starting fabrication of final panels.



Department of Public Works I-39 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026

Notify the Engineer 10 days prior to the start of the viewing period at the fabrication site.
The Engineer may request that additional mock-ups be constructed until the desired results are attained.
The Engineer uses the authorized mock-up to determine the acceptability of the work.
The authorized mock-up may be incorporated into the final work.
78-6.02 MATERIALS
78-6.02A General
Panels and attachments must be fabricated from commercial quality aluminum.
Coatings must be provided from the same manufacturer, and comply with Section 91. Finish coats must
have a satin finish and match the colors described in the Information Handout.
78-6.02B Design Criteria
Design panels to resist all vertical and horizontal loads. Comply with the current AASHTO LRFD
Structural Supports for Highway Signs, Luminaires, and Traffic Signals.
78-6.03 CONSTRUCTION
Perform aluminum welding by the inert-gas-shielded arc welding process. Finish exposed aluminum
welds to a neat surface.
Before painting, remove burrs and sharp edges, and chamfer all corners.
Blast clean surfaces to be painted under SSPC-SP 10.
Carefully handle the materials such that no parts are bent, broken, abraded, or otherwise damaged. Do
not use manufacturing, handling, or installation methods that damage or distort the members or damage
the painted surfaces.
Attaching panels by welding to bridge members is not permitted.
Panels must present a uniform appearance in their final position, conforming closely to the horizontal and
vertical lines shown or ordered.
Apply anti-graffiti coating to the panels under section 78-4.06. Anti-graffiti coating for panels must be
compatible with painted surfaces, and have a satin finish when dry.


78-6.04 PAYMENT
Not Used


Replace section 78-7 with:
78-7 COMMUNITY IDENTIFICATION (LETTERS)
78-7.01 GENERAL
78-7.01A Summary
Section 78-7 includes specifications for furnishing and installing the Community Identification (Letters) as
shown, and as described in the Information Handout in the document titled Signature Gateway East
Concept. Letters are comprised of aluminum letter boxes, attachments to bridge members, internal
polycarbonate panels, exterior acrylic faces, and wire raceways.



Department of Public Works I-40 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
78-7.01B Definitions
Not used
78-7.01C Submittals
Submit a certificate of compliance for aluminum, polycarbonate sheets, acrylic sheets, sealants, and all
other components used in the letters.
Submit shop drawings and calculations for the letters. The shop drawings and calculations must be
sealed and signed by an engineer who is registered as a civil engineer in the State.
The shop drawings and calculations must include:
1. Letter layout
2. Letter dimensions
3. Complete details for the construction of the work, including methods of attachment, construction
methods, sequence of shop and field assembly, installation procedures, and methods for adjustment
to line and grade.
4. Welding sequences and procedures
5. Material specifications and grades
6. Material preparation and painting procedures
7. Methods for accessing internal letter components for service
8. Design calculations that include stresses and deflections in all load carrying components of the
letters.

Allow 30 days for the Department's review.
78-7.01D Quality Assurance
78-7.01D(1) General
Welding must comply with AWS D1.2 for aluminum.
78-7.01D(2) Mock-ups
Mock-up must be:
1. Full size representing the letters "G" and "B".
2. Include internal lighting components.
3. Available for viewing by the Engineer for a period of 5 days at the fabrication site. prior to delivery to
project site.
4. Furnished to the project site and installed at an authorized location on the bridge.
5. Furnished and installed using the personnel, materials, equipment, and methods to be used in the
work.
6. Authorized before starting fabrication of final letters.

Notify the Engineer 10 days prior to the start of the viewing period at the fabrication site.
The Engineer may request that additional mock-ups be constructed until the desired results are attained.
Mock-up letters must be temporarily powered for viewing both at the fabrication site and at the project
site.
The Engineer uses the authorized mock-up to determine the acceptability of the work.
The authorized mock-ups may be incorporated into the final work.
78-7.02 MATERIALS
78-7.02A General
Channel letter frames, back panels, wire raceways, and attachments must be fabricated from commercial
quality aluminum.



Department of Public Works I-41 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
Internal clear lenses must be fabricated from commercial quality polycarbonate sheets with low hazing
and UV resistant characteristics.
Letter faces must be fabricated from commercial quality acrylic sheets with low hazing, UV resistant, and
abrasion resistant surface coating.
Sealants must be clear and of commercial quality, compatible with the materials sealed, and suitable for
outdoor exposure.
Coatings must be provided from the same manufacturer, and comply with Section 91. Finish coats must
have a satin finish and match the colors described in the Information Handout.
78-7.02B Design Criteria
Design letters to resist all vertical and horizontal loads. Comply with the current AASHTO LRFD Structural
Supports for Highway Signs, Luminaires, and Traffic Signals.
78-7.03 CONSTRUCTION
Perform aluminum welding by the inert-gas-shielded arc welding process. Finish exposed aluminum
welds to a neat surface.
Before painting, remove burrs and sharp edges, and chamfer all corners.
Blast clean surfaces to be painted under SSPC-SP 10.
Carefully handle the materials such that no parts are bent, broken, abraded, or otherwise damaged. Do
not use manufacturing, handling, or installation methods that damage or distort the members or damage
the painted surfaces or letter faces.
Attaching letters by welding to bridge members is not permitted.
Letters must present a uniform appearance in their final position, conforming closely to the horizontal and
vertical lines shown or ordered.
78-7.04 PAYMENT
Not Used

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION XI MATERIALS
91 PAINT


Replace section 91-5 with:
91-5 PAINT FOR COMMUNITY IDENTIFICTION ELEMENTS
91-4.01 GENERAL
Section 91-5 includes specifications for furnishing paint for Community Identification elements including
bridge piers and perforated aluminum panels.
91-5.02 MATERIALS
91-5.02A General
All paint and clear coat to have a satin finish.



Department of Public Works I-42 R-7259
City of Long Beach Division I – Technical Requirement
IFB – 07/20/2026
91-5.02B Primer
Primer must consist of Matthews epoxy primer and associated product listed below.
Product No. Product Name
274530SP 2.1 VOC White Epoxy Primer
274529SP 2.1 VOC Epoxy Hardener

91-5.02C Paint
Paint must consist of Matthews acrylic polyurethane paint and associated products listed below.
Product No. Product Name
MAP-LVS Acrylic Polyurethane Ultra Low VOC Paint
MAP-LVX270 Low VOC Hardener
MAP-LVRS02 Spray Reducer with Pot-life Extender

91-5.02D Clear Coat
The clear coat must consist of Matthews products listed below.
Product No. Product Name
MAP-LVC228 Ultra Low VOC Clear
MAP-LVX270 Low VOC Hardener
MAP-LVRS02 Spray Reducer with Pot-life Extender

Obtain Matthews products from a Matthews Paint Distributer:
MATTHEWS PAINT
760 PITTSBURGH DR
DELAWARE OH 43015
(800) 323-6593
https://www.ppg.com/en-US/refinish/products/matthews-paint

91-5.03 CONSTRUCTION
Prepare and apply primer, paint and clear coat per manufacturer guidance provided in the Information
Handout.
91-5.04 PAYMENT
Not Used

📄 R7259-Palo-Verde-Ave-Bridge-Bid-RFIs-Responses.pdf (Parsed Contract Document)

R-7259
Responses to Bid RFIs





November 4, 2026



CONTRACTOR REQUESTS FOR INFORMATION & CITY OF LONG BEACH RESPONSES

PLANS AND SPECIFICATIONS NO. R-7259
PALO VERDE AVENUE PEDESTRIAN BRIDGE SIGN PROJECT
IN THE CITY OF LONG BEACH, CALIFORNIA


NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS:

Please note the following Requests for Information submitted and City responses.

1). Will Bid Items 17 and 18 (Community Identification Panels and Letters) be designated as
"Specialty Items" under H 2-3.2, so they can be subcontracted without counting against the
prime's 20% self-performance requirement? Ref Div H 2-3.2, Self Performance.
RESPONSE: No. Bid Items 17 and 18 are not designated as Specialty Items under Section H
2-3.2. The Contractor shall comply with the self-performance and subcontracting
requirements specified in the Contract Documents.

2). Do Buy America requirements apply to the structural steel and sign materials? Ref Div D
contains both contract templates; Div H 7-2.2 references Tidelands funding.
RESPONSE: No, these requirements do not apply.

3). Please confirm the City's expectations if the schedule slips into 2028, given the LA28
restrictions on traveled-way work in July and August 2028. Ref Div I 12-4.02C(3)(e).
RESPONSE: The project is expected to be completed by the end of 2027 in accordance with
the construction window specified in the Contract Documents. Therefore, the LA28
restrictions announced for 2028 are not expected to apply. The Contractor shall plan and
sequence the Work accordingly.

4). Full-size mock-ups are required for letters "G" and "B" (with working lighting) and one
panel, viewed for 5 days at the fabrication site and then installed on the bridge. Will the City
and Caltrans inspect at an out-of-area fabrication facility (San Diego), and who covers
inspector travel? Ref Div I 78-6.01D(2) and 78-7.01D(2).
RESPONSE: The Engineer/inspectors will perform the required mock-up review at the
fabrication site, provided the site is within the general vicinity of Long Beach. For fabrication
facilities located outside the general vicinity of Long Beach, the Contractor shall coordinate
with the City at least 10 days in advance to establish an acceptable location and method for
the required mock-up review. The mock-ups are not required to be subsequently installed on
the bridge.



Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383


R-7259
Responses to Bid RFIs
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
5). The plans show both Gotham Medium and Gotham Bold. Which weight applies to "LONG"
and which to "BEACH"? What is the required letter return depth (concept detail suggests 6"
and 10")? Ref Plan sheet AT-10 (Community ID Letters Details); Selbert Perkins concept.
RESPONSE:
Gotham Medium: "LONG"
Gotham Bold: "BEACH"
See sheet AT-10. Letter depth 10" per section detail on AT-10.


6). Is a specific LED module required for the internally illuminated letters? Attachment 11
names a Lumenfacade fixture, while the plans state the RGB modules are "to be determined
by fabricator." Ref Attachment 11; plan sheet AT-10.
RESPONSE: RGB LED Module for letter illumination to be determined by fabricator,
submitted for City, designer approval.


7). What product is specified for Anti-Graffiti Coating (Item 20)? Is it applied to the aluminum
panels and letters in addition to the piers? Ref Bid Item 20; plan sheet AT-1, note 6. No spec
section found. Ref Bid Item 20; plan sheet AT-1, note 6. No spec section found.
RESPONSE: Bid item 780460 Anti Graffiti Coating is covered solely in Section 78 of the
Standard Specifications. Applied to all painted surfaces as noted - piers and panels.


8). When will the Caltrans encroachment permit and its special provisions (F10 and F11) be
issued? Will the bid date be extended if they are issued late? Ref Div F; Div H 7-5.2.
RESPONSE: The Caltrans encroachment permit is anticipated to be issued well in advance
of construction contract execution and construction mobilization, currently targeted for
summer 2027. Following anticipated City Council action in early 2027, a limited Notice to
Proceed is anticipated for signage submittals and procurement. Bidders shall prepare their
bids based on the Contract Documents and addenda issued during the bidding period. An
extension of the bid date due to the timing of the encroachment permit is not anticipated at
this time.


9). Due to material restraints, the perforated panels should be made in two- sections to avoid
having 8' plus plate special ordered. Is this acceptable?
RESPONSE: This would be acceptable, subject to the seam meeting applicable structural
requirements and being either concealed or visually minimal. The proposed panel seam and
connection detail shall be included in the panel submittal for review and acceptance.












R-7259
Responses to Bid RFIs
Department of Public Works
411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383

CONTACT: Before the Bid opening, prospective Bidders shall direct any communications
regarding this Work to:

City of Long Beach, Department of Public Works
Project Management Bureau
5th Floor, City Hall
411 W. Ocean Boulevard
Long Beach, CA 90802
Attention: Kimvy Nguyen / Natalie Gonzalez
E-mail: Kimvy.Nguyen@psomas.com /Natalie.Gonzalez@longbeach.gov



Communications may be written or oral, but the City is not bound by any oral interpretation of
the Contract Documents made by any City employee, nor does the City guarantee the accurate
transcription of oral questions.




PREPARED BY: Kimvy Nguyen



ACKNOWLEDGED BY:
Company Name




Print Name Title


Signature Date
mailto:Kimvy.Nguyen@psomas.com

Content extracted directly from the issuing government portal. For authoritative technical exhibits, download official documents listed above.

About Government RFPs & Solicitations

Government RFPs and competitive bids are won through preparation, compliance, and a compelling value proposition. The questions below cover procurement fundamentals and how GTC 360° Advisors assists prospective vendors.

  • What is an RFP (Request for Proposals)?

    A Request for Proposals (RFP) is a formal solicitation issued by a government agency or public entity inviting vendors to submit competitive bids for goods, services, or construction. Unlike grants, RFPs are procurement contracts: you are paid to deliver a defined scope of work rather than awarded funds for a program.
  • How is an RFP different from a grant?

    Grants are non-repayable funds awarded to support a public mission or community program. RFPs and bids are government contracts: you compete by proposing your capability, past performance, and pricing to perform a specific government requirement. Winning an RFP means you enter into a binding commercial contract with the public agency.
  • What is a Bid, an IFB, or a Solicitation?

    These terms are often used across state, local, and federal procurement. An Invitation for Bids (IFB) is typically awarded to the lowest responsive and responsible bidder. An RFP evaluates both technical approach and price. A solicitation is the umbrella term for any formal government purchasing notice, including RFPs, IFBs, and Requests for Qualifications (RFQs).
  • Who can respond to a government RFP or bid?

    Any registered business, nonprofit, or qualified vendor that meets stated eligibility requirements can respond. Many state and local RFPs actively prioritize small businesses (SBEs), minority-owned firms (MBEs), women-owned firms (WBEs), and disabled veteran business enterprises (DVBEs). Always check the solicitation document for specific vendor requirements, insurance minimums, and bonding obligations.
  • How does GTC 360° Advisors help vendors respond to RFPs?

    GTC 360° Advisors provides capture strategy, proposal writing, compliance checklist development, competitive pricing analysis, and submission management. Our team reviews the solicitation requirements, identifies evaluation criteria, and builds a compliant, compelling response to maximize your probability of award on the timeline required.
  • What is the difference between State & Local and Federal procurement?

    Federal contracts are governed strictly by the Federal Acquisition Regulation (FAR) and require SAM.gov registration plus a Unique Entity Identifier (UEI). State and local contracts operate under each individual jurisdiction’s procurement ordinances. GTC 360° Advisors navigates both environments and advises on registration, local preference programs, and winning strategies.
  • How early should I start preparing a proposal for an RFP?

    For competitive government solicitations, we recommend starting at least 3 to 6 weeks before the submission deadline. Rushed proposals frequently miss mandatory compliance forms or fail formatting criteria. If this solicitation has already closed, reach out to us regarding future pipeline opportunities across all 50 states.

5 days is enough time — if you start now.

Tell us the opportunity and our team will provide an honest read on fit, required subcontracting partners, and what a compliant submission requires.

Request proposal support